Presentation is loading. Please wait.

Presentation is loading. Please wait.

Www.see-grid.eu SEE-GRID-2 The SEE-GRID-2 initiative is co-funded by the European Commission under the FP6 Research Infrastructures contract no. 031775.

Similar presentations


Presentation on theme: "Www.see-grid.eu SEE-GRID-2 The SEE-GRID-2 initiative is co-funded by the European Commission under the FP6 Research Infrastructures contract no. 031775."— Presentation transcript:

1 www.see-grid.eu SEE-GRID-2 The SEE-GRID-2 initiative is co-funded by the European Commission under the FP6 Research Infrastructures contract no. 031775 WP3 progress report Antun Balaz WP3 Leader Institute of Physics, Belgrade antun@phy.bg.ac.yu SEE-GRID-2 PSC06 Meeting, 22 November 2007 Sarajevo, Bosnia and Herzegovina

2 SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 20072 Overview WP3 deliverables and milestones WP3 schedule WP3 activities status WP3 issues WP3 action points

3 SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 20073 WP3 Deliverables & Milestones (1) D3.1a - Infrastructure Deployment Plan, M04 (CERN)  Describes the envisaged infrastructure deployment execution plan to be followed in the region.  Prepared and submitted on time D3.2 - CA and RA guidelines for new candidates, M05 (GRNET/AUTH)  This deliverable describes the guidelines and best practices of the per-country CA and RA organization and policies.  Prepared and submitted on time D3.3 - Portal specifications and functionality, M06 (SZTAKI)  This deliverable provides the characteristics and structure of the multi-grid user-oriented portal.  Prepared and submitted on time

4 SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 20074 WP3 Deliverables & Milestones (2) D3.1b - Infrastructure Deployment Plan, M14 (CERN)  Final version of D3.1.  Prepared and submitted on time We are currently in M19 Future: D3.4 - Infrastructure overview and assessment, M23 (UOB-IPB)  This deliverable presents an overview and assessment of the progress in the regional infrastructure and operations in the life of the project  TOC will be circulated soon

5 SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 20075 WP3 Deliverables & Milestones (3) M3.1 - Infrastructure Deployment Plan Defined  M04, Status: OK M3.2 - CA and RA guidelines for new candidates defined  M05, Status: OK M3.3 - Portal operational across the pilot Grid  M12, Status: OK

6 SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 20076 WP3 schedule M01 - Start of WP3 M04 - Infrastructure Deployment Plan (M3.1, D3.1a) M05 - CA and RA guidelines for new candidates (M3.2, D3.2) M06 - Portal specifications and functionality (D3.3) M12 - Portal operational across the pilot Grid (M3.3) M14 - Final Infrastructure Deployment Plan (D3.1b) M19 – We are currently here M23 - Infrastructure overview and assessment (D3.4) M24 - End of WP3 (and of the project)

7 SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 20077 WP3 activities overview A3.1: Implementation of the advanced SEE-GRID infrastructure (UOB-IPB/IPP) A3.2: Network Resource Provision and BoD requirements (IPP) A3.3: Deploy and operate Grid CAs (GRNET) A3.4: Provide a user portal (SZTAKI)

8 SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 20078 A3.1: Overview Infrastructure status  Infrastructure size and gLite deployment status Operations  SLA conformance monitoring per site  MPI support on SEE-GRID sites Operational & monitoring tools deployment & integration  Accounting Portal / R-GMA SEE-GRID Wiki status WP3 developments Infrastructure, Site and VO metrics

9 SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 20079 Infrastructure status (1) SEE-GRID total and free CPUs in the last year

10 SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 200710 Infrastructure status (2) SEE-GRID infrastructure contains currently the following resources:  35 sites in SEE-GRID production  Over 1150 CPUs available  Storage: 42 TB + 27 TB in preparation All sites on gLite-3, with 12 sites on gLite-3.1 and the rest on gLite-3.0 glite-WMSLB actively used (its 3.1 version) Guides provided for deployment of gLite-3.1 WNs on SL4.5, for both 32-bit and 64-bit architectures Other 64bit guides in preparation (SE_dpm will be first) Migration to YAIM-4 in progress

11 SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 200711 Operations SLA conformance monitored per site; tools used:  HGSM, SAM, GStat, WiatG, Helpdesk SLA conformance analysis:  SEEGRID2-WP3-RS-023-SLA-Q6-a-2007-11-16.xls Availabilities have declined compared to Q5! Red group (availability < 50%) has grown to 7 sites  RO-03-UPB  RO-05-INCAS  RO-06-UNIBUC  RO-09-UTCN  RO-10-TUIASI  AL-02-FIE  AEGIS06-AOB (in maintenance)

12 SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 200712 Comparison of CE availabilities

13 SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 200713 MPI support MPI WG established It will produce a set documents, recommending  MPI setup of SEE-GRID sites  Tests for MPI setup of SEE-GRID sites  Submission of MPI jobs to SEE-GRID infrastructure Currently MPI setup is checked once a week by Grid- Operator-on-Duty, and tickets are opened to sites that advertise MPI, but MPI jobs fail

14 SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 200714 Operational & monitoring tools Operational & monitoring tools deployment status  Hierarchical Grid Site Management (HGSM) – Turkey  Service Availability Monitoring (SAM) (+ porting to MySQL) – Bosnia and Herzegovina with CERN support  Helpdesk - Romania  BBmSAM - Bosnia and Herzegovina  GridICE – FYR of Macedonia  SEE-GRID GoogleEarth – Turkey + Gidon Moont (ic.ac.uk)  SEE-GRID GoogleMaps - Turkey  Global Grid Information Monitoring System (GStat) – Min-Hong Tsai (ASGC, Taiwan)  Nagios - Bulgaria  Real Time Monitor (RTM) – Gidon Moont (ic.ac.uk) and Turkey (HGSM)  MONitoring Agents using a Large Integrated Services Architecture (MonALISA) – Romania  What is at the Grid (WiatG) – CERN with support from Serbia  Accounting Portal / R-GMA – Bulgaria  Pakiti - Greece

15 SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 200715 Accounting Portal / R-GMA (1) Provides full accounting data  Per site/institution  Per country  Per VO Provides full statistics for usage  Per institution  Per application (in progress) Provides job statistics (success rates etc.) Accounting portal is based on SEE-GRID R-GMA data Publishing of site accounting data to R-GMA done by the deployed Java publisher, developed by IPP SEE-GRID-2 PSC05 meeting, Thessalonica, Greece - September 11-12, 2007

16 SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 200716 Accounting Portal / R-GMA (2) Accounting views for SEEGRID-only sites per site accounting: ● https://gserv1.ipp.acad.bg:8443/Accounting

17 SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 200717 Accounting Portal / R-GMA (3)  Accounting views for SEEGRID and EGEE sites that support SEEGRID – per country/institution user accounting https://gserv1.ipp.acad.bg:8443/Accounting-2

18 SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 200718 Accounting Portal / R-GMA (4)  Accounting views for Job success rates and other statistics –in progress, currently running on our own data only. https://gserv1.ipp.acad.bg:8443/Jmon

19 SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 200719 SEE-GRID Wiki Available at  http://wiki.egee-see.org/index.php/SEE-GRID_Wiki Many documents still missing UKIM should be coordinating Effort needed by all partners

20 SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 200720 WP3 developments HGSM WiatG, WsbatG Accounting portal glite-yaim-seegrid customizations and packaging apt/yum repository of SEE-GRID customized packages SVN repository development RB/WMS monitoring tool development, packaging and deployment GridMap customizations and deployment

21 SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 200721 Infrastructure, Site and VO metrics Infrastructure growth over time (sites, CPUs, storage, memory?) Bandwidth growth? Site availabilities and downtimes (CE, SE) Accounting data (per site, per country, per application, per VO, per user community, time distribution); SEEGRID VO + national VOs Job success rates (per site, per country, per application, per VO, per user community, time distribution); SEEGRID VO + national VOs VO membership time evolution, distribution per country, per application, per user community; SEEGRID VO + national VOs

22 SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 200722 A3.2: Status IPP Status of the infrastructure and plan for expansion  5 sites infrastructure – significantly stable with good up-time  All sites upgrading now to SL4 WNs and gLite 3.1.0.  New grid site in progress with 12 WNs in Geophysical Institute.  Core services, monitoring tools:  R-GMA: graphical on-line user interface  Accounting information: https://gserv1.ipp.acad.bg:8443/Welcome –Accounting by SEEGRID-only sites –Application Accounting –Job monitoring Accounting (need to add the data from all RB and WMS).  FTS: used in production by SALUTE  WMS – run stable using a better hardware.  BDII stability and capability improvements

23 SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 200723 A3.3: Status New accredited CAs in the Region  Romanian CA (ROSA CA)  Accreditation request on January 25, 2006  Under review by GridAUTH team, PK-GRID CA and CESNET CA (on behalf of EUGridPMA)  Accredited on August 1, 2007  Fully operational Grid CA candidates  Montenegro CA (MREN CA)  CP/CPS reviewed by GridAUTH (via see-ca-incubation mailing list) on July 10, 2007  F.Y.R.O.M. CA (MARGI CA)  Accreditation request on May 4, 2007  First CP/CPS not yet available

24 SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 200724 A3.4: Status SZTAKI SEE-GRID user portal is operational  Maintenance/portal user support Collaboration with Turkish partner (P-GRADE Portal Developer Alliance)  METU finished the Certificate and File manager portlet  It is merged with P-GRADE 2.5v  Testing is ongoing task Problems with accounting (Action Point) P-GRADE Portal received attention on Supercomputing'07 P-GRADE Portal 2.5 goes open source (announced on EGEE'07)

25 SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 200725 WP3 issues and action points (1) Deployment of the Moldova site (MD)  MD-01-TUM certified last weekend  Other sites? Deployment of all Albanian sites (AL)  Difficult due to organizational changes; status? SLA conformance needs to be improved (RO – 5 sites) MPI WG should produce recommendation documents  End of November Helpdesk improvements needed – statistics extraction needs to be perfected (RO)  End of November Wiki reorganization and updates ASAP finished (UKIM)  End of November

26 SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 200726 WP3 issues and action points (2) Migration to SL4 gLite-3.1 on WNs, since gLite-3.0 will not be supported after December (ALL) Application SEEGRID VO VOMS groups to be used by WP4 application developers (ALL)  The use is documented on the Wiki HGSM further developments (TR)  Site application support Knowledge base of helpdesk tickets relevant for application development  Initial set of tickets selected and put to the knowledge base by WP4 leader  From now on, GOODs should put all tickets that may be relevant for application development to the knowledge base

27 SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 200727 WP3 issues and action points (3) SEEGRID VO commitments (RS-IPB)  End of November Review of critical SAM tests (RS-IPB)  End of November  R-GMA test will become critical Metrics for final review to be specified  Proposal to be discussed  End of November Further development of Accounting Portal, so that the metrics and graphs specified can be obtained directly (BG)  Tables and graphs should give data by VOs (all VOs supported by SEE-GRID sites, not only some combinations; set of VOs should be selectable), applications (by name!), institution, country  Mid-December?

28 SEE-GRID-2 PSC06 Meeting - Sarajevo, 22 November 200728 WP3 issues and action points (4) Core services deployment  Status  FYROM (WMS+LB and LFC already deployed for SGDEMO?)  Bosnia and Herzegovina (LFC already deployed; BDII)  Montenegro (WMS+LB)  Mid-December? Broker stability  Tested at AEGIS01-PHY-SCL (wms.phy.bg.ac.yu)  New 3.1 WMS+LB shows improved stability over the old 3.0 WMS+LB  RB/WMS monitoring tool used for on-line status check and problems detection


Download ppt "Www.see-grid.eu SEE-GRID-2 The SEE-GRID-2 initiative is co-funded by the European Commission under the FP6 Research Infrastructures contract no. 031775."

Similar presentations


Ads by Google