Presentation is loading. Please wait.

Presentation is loading. Please wait.

FP6−2004−Infrastructures−6-SSA-026409 www.eu-eela.org E-infrastructure shared between Europe and Latin America Pilot Test-bed Operations and Support Work.

Similar presentations


Presentation on theme: "FP6−2004−Infrastructures−6-SSA-026409 www.eu-eela.org E-infrastructure shared between Europe and Latin America Pilot Test-bed Operations and Support Work."— Presentation transcript:

1 FP6−2004−Infrastructures−6-SSA-026409 www.eu-eela.org E-infrastructure shared between Europe and Latin America Pilot Test-bed Operations and Support Work Package 2 Roberto Barbera EELA Technical Coordinator INFN - Univ. of Catania On behalf of Diego Carvalho Pilot Test-bed Operations and Support Manager Cuban Workshop - 28 May 2007

2 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May 2007 2 Outline e-Infrastructure activities EELA PKI EELA Grid Conclusion

3 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May 2007 3 Pilot Test-bed coordination –management set up & coordination –project execution plan Authentication and Authorization –implementation, operation and support of required Certification Authorities (CA) –international CA coordination –set up of Virtual Organisation (VO) infrastructure and maintenance Overview of activities - 1/2

4 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May 2007 4 Operations –installation of the pilot Test-bed –Test-bed operation and monitoring –definition and implementation of Security Policies & Protocols Network –survey of application requirements –feasibility study of new network service offerings –monitoring of network performance –deployment of new integrated monitoring infrastructure Overview of activities - 2/2

5 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May 2007 5 Deployment of 6 CAs: Brazil Catch-all Argentina Chile Mexico Venezuela Milestone - M2.2.1 Latin America Certification Authority Operational - M07

6 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May 2007 6 Authentication Infrastructure Before EELA CA fully accredited EU “catch-all”

7 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May 2007 7 Authentication Infrastructure right after the EELA Start-up CA fully accredited EU “catch-all” RA

8 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May 2007 8 EELA Certification Authorities Deployed Now CA fully accredited LA “catch-all”, depl. deployed in preparation CA RA fully accredited EU “catch-all”

9 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May 2007 9 Milestone - M2.3.1 Pilot Test-bed Operational - M07 Six months before due time 5 partners 4 Resource Centres (RC) Top Level BDII, LDAPs, Resource Brokers, etc 600 Jobs RedCLARA - Géant traffic rate on 2006.02.01 – LA-Europe is in Blue ALICE Link

10 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May 2007 10 EU e-Infrastructure Experiences of EELA Partners Before the Start-up T-I RC RC = Resource Center T-I = t-Infrastructure Center

11 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May 2007 11 Metric 4/16 (cont) Evolution of the number of sites integrating the e- Infrastructure

12 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May 2007 12 RC T-I The EELA Pilot Test-bed Now 1 RC 5 RC 1 RC 2 RC 1 RC 2 RC 1 RC stand-alone grid site RC = Resource Center T-I = t-Infrastructure Center

13 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May 2007 13 Metric 4/16 Number of sites participating in the Pilot e-Infrastructure Production sites (10) – 6 in Europe – 4 in Latin America Certification (8) – 2 in Europe – 6 in Latin America EELA has two Test-beds: Certification - sites under validation Production - available to users EELA uses the same certification process as EGEE

14 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May 2007 14 Metric 5/16 Resources integrated into the Test-bed Production sites (source GStat) CPU Slots evolution Storage Capacity evolution

15 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May 2007 15 Metric 6/16 Statistics of use of the Pilot Test-bed Successful jobs ~ 120 K jobs ~ 160 CPU years Failure rate: 15% ** Expected load: + 220 K Jobs

16 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May 2007 16 Milestone - M2.2.2 EELA VO infrastructure Operational - M07 EELA AUP VOMS and LFC Servers LA’s User Interfaces

17 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May 2007 17 Metric 12/16 Number of EELA VOs and evolution of the number of users Two distinct VOs: EELA and EDTEAM Two HEP VOs: ALICE and LHCb Resource Centres may support other VOs EELA and EDTEAM VOMS Statistics more than 60 users

18 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May 2007 18 Milestone - M2.3.2 Pilot Test-bed monitoring and Security Policies operational - M12 Monitoring Tools SAM, GStat, GridICE, Real Time Grid Monitor EELA contributed with the SAM Dashboard Security Security Executive Body (SEB) Security Staff Body (SSB) Security Policies & Protocols

19 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May 2007 19 the most comprehensive application survey the most thorough LA network analysis infrastructure application requirements Milestone - M2.4.1 Network Studies - M12

20 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May 2007 20 Metric 1/16 Expertise –only UFRJ, CIEMAT, CERN and INFN had prior experience with EGEE middleware –specific training program and documentation –Regional Operation Centre tutorial (ROC-on-duty) –net result: our documents are accessed worldwide Geomap of EELA GOC access Nov 2006

21 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May 2007 21 Metric 9/16 Number of queries issued and solved by EELA Helpdesk 2006 74 support tickets 60 solved tickets (81.1%) 14 in hold Future integration with Network Helpdesk escalation up to EGEE

22 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May 2007 22 Proportion of special activities successfully supported by the Pilot Test-bed Metric 8/16 EELA Kick-of-meeting Lisbon EU-LAC Summit first EELA Conference ROC-on-duty tutorial 3 tutorials 3 data challenges first EELA grid school - (Stand Alone Grid) WP2 fulfilled 100% of 2006 requests EGRIS logistics

23 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May 2007 23 Metrics 13/16 Major network requests handled Enabling of International routing for high speed access to RCs in Rio de Janeiro Enhancement of End-to-End Performance –Tuning of TCP/IP streams over Fat Pipes Specific setups for events –EU-LAC Summit (dedicated connection to NREN) –1st EELA Conference  Bandwidth increase for data challenge  VPN providing connection to EELA network infrastructure – 3rd Tutorial – EGRIS (stand-alone-grid) and other specific actions

24 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May 2007 24 Metric 14/16 Requests of Advanced Network use from the e- Infrastructure (implementation and monitoring) TCP/IP streams over Fat Pipes (RedCLARA/GÉANT2 link) perfSONAR monitoring system

25 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May 2007 25 Conclusions

26 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May 2007 26 Conclusions WP2 Global highlights –Setup of a Pilot Test-bed with 5 sites (only 3 sites were committed in TA and 6 months before the expected date) –After 1 year: 16 integrated sites ( > 1 site/month) –Over 150 CPU.year delivered –EELA Public Key Infrastructure is a landmark in LA –2 EELA VOs and support for several EGEE VOs –Network studies providing the full picture of network characteristics for future application deployment

27 FP6−2004−Infrastructures−6-SSA-026409 E-infrastructure shared between Europe and Latin America Sixth EELA Workshop - Cuba - 28 May 2007 27 http://www.eu-eela.org


Download ppt "FP6−2004−Infrastructures−6-SSA-026409 www.eu-eela.org E-infrastructure shared between Europe and Latin America Pilot Test-bed Operations and Support Work."

Similar presentations


Ads by Google