Presentation is loading. Please wait.

Presentation is loading. Please wait.

US Army Corps of Engineers BUILDING STRONG ® Alabama River Lakes Recreation Edward I. Lyon Site Manager/Supervisory Park Ranger Alabama River Lakes.

Similar presentations


Presentation on theme: "US Army Corps of Engineers BUILDING STRONG ® Alabama River Lakes Recreation Edward I. Lyon Site Manager/Supervisory Park Ranger Alabama River Lakes."— Presentation transcript:

1 US Army Corps of Engineers BUILDING STRONG ® Alabama River Lakes Recreation Edward I. Lyon Site Manager/Supervisory Park Ranger Alabama River Lakes

2 BUILDING STRONG ® R.E. “BOB” WOODRUFF LAKE WILLIAM “BILL” DANNELLY RESERVOIR CLAIBORNE LAKE

3 BUILDING STRONG ® AL FL GA MOBILE BIRMINGHAM G U L F O F M E X I C O ALABAMA RIVER COOSA RIVER FLINT RIVER APALACHICOLA RIVER ATLANTA TALLAPOOSA RIVE R MONTGOMERY - ALABAMA-COOSA-TALLAPOOSA BASIN Claiborne Lock only R.F. Henry Lock, Hydropower, Rec staff Millers Ferry Lock, Hydropower, Rec Staff Corps Alabama Power

4 BUILDING STRONG ® Alabama River Lakes Site Office Millers Ferry Resource Office Project Offices

5 BUILDING STRONG ®  68,006 TOTAL AREA ACRES (Includes Land, Water & Easement) ► 25,013 WOODRUFF LAKE ► 34,400 DANNELLY RESERVOIR ► 8,593 CLAIBORNE LAKE

6 BUILDING STRONG ® 42 Recreation Areas covering 8 counties 35 Corps operated 7 Leased to other Government Agencies 6 Class A Campgrounds 476 Campsites 3 Day Use Parks with Beaches

7 BUILDING STRONG ® FACILITIES

8 BUILDING STRONG ® Campsites

9 BUILDING STRONG ® Boat Ramps

10 BUILDING STRONG ® Playgrounds

11 BUILDING STRONG ® Group Pavilions Dulcimer Festival Halloween / Gunter Hill

12 BUILDING STRONG ® Beaches

13 BUILDING STRONG ® Picnic Areas

14 BUILDING STRONG ® Butterfly Garden

15 BUILDING STRONG ® Alabama Birding Trails

16 BUILDING STRONG ® Renew Our Rivers

17 BUILDING STRONG ® Annual Youth Catfish Rodeos Life time fishing license winners Given by ACEOA

18 BUILDING STRONG ® AMERICAN RECOVERY AND REINVESTMENT ACT  PAVING  GUNTER HILL RENOVATION  EQUIPMENT PURCHASES  WATERBORNE TOILETS  PLAYGROUNDS  ELECTRICAL UPGRADES  UPGRADE/RENOVATION MILLERS FERRY RESOURCE OFFICE

19 BUILDING STRONG ® East Bank Beach, Bridgeport Beach and Six Mile Creek Park Playgrounds Complete

20 BUILDING STRONG ® Electrical Upgrades Prairie Creek, Six Mile, and Millers Ferry Complete

21 BUILDING STRONG ® 7 Loaner Life Jacket Stations Complete

22 BUILDING STRONG ® Weather Allowed for Some Clean-up of Drift Before After

23 BUILDING STRONG ® Paving in Progress

24 BUILDING STRONG ® Gunter Hill Campground Park Renovation In Progress

25 BUILDING STRONG ® Recreation at it’s BEST!


Download ppt "US Army Corps of Engineers BUILDING STRONG ® Alabama River Lakes Recreation Edward I. Lyon Site Manager/Supervisory Park Ranger Alabama River Lakes."

Similar presentations


Ads by Google