Presentation is loading. Please wait.

Presentation is loading. Please wait.

SMAP 5 - Kickoff 19 March 2010. IBM Smarter Planet Agenda Introductions Background (SMAP) Proposed Component Model General discussion on approach An overview.

Similar presentations


Presentation on theme: "SMAP 5 - Kickoff 19 March 2010. IBM Smarter Planet Agenda Introductions Background (SMAP) Proposed Component Model General discussion on approach An overview."— Presentation transcript:

1 SMAP 5 - Kickoff 19 March 2010

2 IBM Smarter Planet Agenda Introductions Background (SMAP) Proposed Component Model General discussion on approach An overview of the projects functional objectives (Scenario / Demo) Next Steps

3 IBM Smarter Planet Introductions Arthur Proestakis – GIS, iPhone, methodology Gerard Gigliotti – Java, J2EE, Web Front End Neil Penman – Architecture Milind – J2ME Bryan – J2EE, Java Media Framework, GPS, Mobiles Hai – Java, Mobiles Ricky – Java, HTML5, Oracle / Databases Hubert – Java, J2EE, XML Astrid – Project Director Amit – PHD student, software engineering, architecture (2 hours per week)

4 IBM Smarter Planet SMAP - Instrumentation and data collection for the Smarter Planet Collection of location aware data using mobile phones Low cost cloud based software and hardware Provides insight into the effectiveness of intervention programs in developing countries A collaborative project between IBM, World Vision and RMIT University Shares data using maps Provides simple access to the data by analytic, logistic and management systems

5 IBM Smarter Planet The Current Survey Application - SMAP Data Collector (Cloud) Management Console Download Survey Upload Results ETL Relational Database WV Program Effectiveness Analyse results ADP Manager Create Survey / Monitor Progress Enumerator

6 IBM Smarter Planet Architecture Mobile Devices & Interface (4) Task InterfaceOSM API(9) SMAP Relational API Publish / Subscribe Geo Database (OSM) Analysis FE (5) Task Storage (6) Survey Template Editor Map Server (8) Relational View (7) Geo Editor Out of the boxSMAPSMAP5 1.SMAP Mobile (Java) (2) SMAP Geo (Java) (3) SMAP Mobile (Smart) Storage Back Office

7 IBM Smarter Planet Approach Agile o Self Directed Team o Maintain a product backlog and requirements documents o Multiple sprint cycles of 2-3 weeks, (Total of 3 sprints) for each  Update requirement use cases  Design changes to components  Implement & test  Demonstrate o Daily meeting at RMIT 30mins – 1 hour o Weekly meeting at IBM (1 hour) Roles o Product Owner / Scrum Master - NP o For each sprint team members need to select  functions / use cases they will update  Components / tasks they will design, code and test o Architect, Project Manager, Tech Specialists

8 IBM Smarter Planet Tools XPlanner Google Code

9 IBM Smarter Planet SMAP 5 – Demonstration Scenario User identifies the OSM element (Use JOSM) User creates task information and associates it with target element o Refer to: http://code.google.com/p/smap-suite/wiki/geoMetaLanguagehttp://code.google.com/p/smap-suite/wiki/geoMetaLanguage The mobile user downloads the task information o Possibly using: http://server_name/ api/0.6/relation/#id/full The user answers the question using the mobile device The user uploads the completed task

10 IBM Smarter Planet Next Steps Familiarisation with OSM o Everone needs to register and map something! Complete Project Charter o Communication Mechanism Complete High Level Project Plan (NP) Confirm Tools Confirm meeting times Start SCRUM1 – When

11 IBM Smarter Planet Links http://code.google.com/p/smap-suite/ http://www.openstreetmap.org

12 IBM Smarter Planet


Download ppt "SMAP 5 - Kickoff 19 March 2010. IBM Smarter Planet Agenda Introductions Background (SMAP) Proposed Component Model General discussion on approach An overview."

Similar presentations


Ads by Google