AA-mid Strategy to proceed to SRR & next steps AuthorAndrew Faulkner AA dCoDR: 23 November 2011.

Similar presentations


Presentation on theme: "AA-mid Strategy to proceed to SRR & next steps AuthorAndrew Faulkner AA dCoDR: 23 November 2011."— Presentation transcript:

1 AA-mid Strategy to proceed to SRR & next steps AuthorAndrew Faulkner AA dCoDR: 23 November 2011

2 General AAVS Schedule AA-mid Individual tile demonstratorsAAVS02011 Single array performance demonstratorAAVS12013 multi-array interferometer performance demonstratorAAVS22016 SKA 1 capable costed design2016 AA systemAA-low and AA-mid AA-CoDR2011 SKA 2 technology roadmap & costed system design2014 AA-mid SRRnot yet fixed but will be 1Q2013 The work will be affected by the WBS being undertaken and the SoW for SKA PEP

3 Digital processing architectures AAVS0 –EMBRACE processing AAVS1 – use similar processors to AA-low deployment –UNIBOARD per AA-low AAVS1 AAVS2 – Updated for current programmable devices –UNIBOARDx per AA-low AAVS2 SKA 2 Deployment…. –Upgraded to the then current generation devices

4 Decisions, decisions.... Front-end –Element typeVivaldi or ORA –Element pitchFrequency range and performance –LNASingle ended or differential Signal processing –BeamformingSplit analogue/digital –Data rates e.g.Tile to Station Processor Physical –TilesSplit or contiguous –Station processingLocation etc.

5 Principal design option decisions AA-mid element selectionQ4 2014 –Vivaldi or ORA –Take forward viable designs through AAVS1 –Decision prior to AAVS2 PRR Processing ArchitectureQ1 2013 & 2015 –AAVS0 & 1: not critical for processing hardware –Choose actual devices as late as possible –Decision after AAVS2, for build decision on SKA implementation

6 Critical design aspects 1. An acceptable cost level 2. An acceptable power level 3. Reduction of the system noise temperature 4. Scalability 5. Calibrateability 6. A verified performance for radio astronomy A lot of focus on: Cost & Power A lot of focus on: Cost & Power

7 Summary AA-mid finalising specifications: DRM, system SRR AA-mid on an SKA 2 timescale Progressive development through AAVS0-2 Options and selection available Progression over many years leading to SKA