1 PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 07 MAR 12 OPT Brief

2 2 UNCLASSIFIED Roll Call CDS-7 State Dept – Mr. Weinz USNS MERCY AUS HQ JOC HQ JFNZ JSDF FLC-Yokosuka C7F C3F CTF 76 351 st Civil Affairs Command DLA Troop Support - Pacific ETG 30 th NCR HSC-21 DET 2 MCAST Blue: Normal participants not expected to attend VTC due to scheduling conflict.

3 3 UNCLASSIFIED PP 12 Weekly Planning Rhythm ThursFriSatSun 1300-1500W OPT VTC 1100W read ahead slides posted to APAN 1100W CA WG 1300W LOG WG 1200W MED WG 1300W FP WG Every other week MonTuesWed 1000W COMMS WG 1430W Comm Integration WG CPF N3 Semi-Monthly Update 1200W ENG WG Effective 22 FEB

4 4 UNCLASSIFIED SEPOCTNOVDECJANFEBMARAPRMAYJUNJULAUG Mission Planning/CONOPS (CPF) Meetings/Conferences (CPF/CDS) Force Sourcing (CPFN3) Interagency Coord (CPF N5) NGO Coordination (CPF N5) Partner Nations (CPF N5/C7F) Final Transit Plan (CDS) Funding/Auths (CPF N5/N00F) Communications (CPF N6) Assessment (CA WG) Detailed CONOPS (CDS) PDSS/Advanced Echelon (CDS) Deployment (CDS) Planning Timeline Advanced Echelon Deployment MOU Letters Signed EXORD Systems CPF RFF Mid Planning Conference Initial Planning Conference Initial PLANORD PDSS FSLO Letter Final Requirements PN Invitation letters Assessment plan Country CONOPs

5 5 UNCLASSIFIED ADF Planning Status General Planning CJOPS Decision Brief for PP12 signed. Command CMDR Ken Walters, RAN confirmed as Commander Australian Contingent. Small number of ASNCE staff remain to be identified. Engineering 12 engineers confirmed to participate as FIE in Indonesia. Medical All Personnel for ADF Health PP12 positions identified. Credentialing to follow. No Change

6 6 UNCLASSIFIED ADF Participation Command Element –O-5 Commander and 4/5 support staff. CIMIC –2 personnel. Engineering Section –12 person section. –FIE Indonesia & SIE for remainder of mission. Medical –Contribution of 20 personnel in each contingent. –Contingent 1 embark USNS MERCY in Guam and change out in Subic Bay Philippines. –Contingent 2: embark USNS MERCY in Subic Bay Philippines and disembark at the conclusion of mission in Cambodia. –HQJOC Health PP12 POC: CMDR Kenneth Walters (SO1 Reg / Dom & Joint Ex Hlth Plans) kenneth.walters@defence.gov.au kenneth.walters@defence.gov.au No Change

7 7 UNCLASSIFIED PP12 RFI Tracker NumberStatusDate ReqResponsibleQuestionOther ADF-001Closed11 Nov 11PACFLTRequest a copy of the Indonesian PDSS itinerary ADF-002Closed11 Nov 11PACFLTStatus of Partner Nation invitation letter No Change

8 8 UNCLASSIFIED JSDF Planning Status CONOPS of Japan - Developing the CONOPS of Japan Country selection - Philippine - Vietnam Activities - Medical supports - Community service projects Introduction of culture etc. - Studying other activities Vehicles - JMSDF Ship LST“OOSUMI” - JASDF Aircraft ( C-130 or KC-767× 1) Medical team - Approximately 20~30 No Change

9 9 UNCLASSIFIED JSDF Planning Status PDSS -Re-survey Philippines with U.S. member in MAR 5 ~ MAR 9 Humanitarian community in Japan - Recruit on 21 FEB POC - PLANNING PRI: LCDR Haga : j3haga@js.mod.go.jp DSN:224-7714 or 7723 SEC: LCDR Yamaguchi : j3yamaguchi_m@js.mod.go.jp - MED PRI: CDR Hayashizaki:j4hayashizaki@js.mod.go.jp SEC: MAJ Yamasaki:j4yamasaki@js.mod.go.jp - PA CDR Maeyama: j1maeyama@js.mod.go.jp No Change

10 10 UNCLASSIFIED JSDF Planning Status NumberStatusdateWGRequests/QuestionsComments JPN -001 19 OCTPDSS Draft plan of PDSS in Philippine and Vietnam JPN-002 30 NOVPDSS Req. re-survey with US survey member in FEB or MAR. JPN-003 8 FEBOPS MERCY's arrival/departure port time at Calbayog and Vinh JPN-004 8 FEB CMO 1day seminar' s date,location,participant No Change

11 11 UNCLASSIFIED NZDF Planning Status No Change NZDF will deploy a multi-disciplinary team of 8 personnel for the duration of the deployment to Vietnam 10 – 24 Jul 12. Exact composition is to be finalised in due course but likely to be as follows with specialties to be advised: 2 x Health Planners 1 x Medical Officer 1 x Nursing Officer 1 x Dentist or Dental Hygienist 2 x Medics 1 x Environmental Health Officer Outline SOM: - Embark USNS MERCY in Subic Bay, Philippines on or prior to 6 July 12. - Conduct tasks as personnel embedded into appropriate health capability bricks. - Disembark at conclusion of Vietnam mission. - RTNZ via either Hanoi or Ho Chi Minh City.

12 12 UNCLASSIFIED CPF FOPS Update - Manning Update - Approximately 70 billets being filled by FFC will be in 07MAR SDOB. - USARC will fill the 16 CA billets. - PACOM will task USARPAC in EXORD.

13 13 UNCLASSIFIED Medical Update Transition to new DMOP – CAPT David Tanen Medical Assessment: PI report being chopped. CAM cancelled. RMI will go forward, need to determine dates, team, etc. Staffing – 97/623 billets remain “un-named” – reportedly filled, names have not been forwarded. 7 positions “unfillable” due to cross-reference with PDSS/ADVON (Gen surg X1, HCA/POMI/RSOI X1, Nurse Educator X 2, Vet X 2, Internist/CC = DMOP) Credential requirements: Still being reviewed by PACFLT, latest from JAG is that we can provide requested information. CONOPS – Medical Annexes PI, VN 90%, CAM, IND 75%. VET Annexes behind, vet now back from USAF ops. MERCEX – SOE in place. OIC Notebook being developed. RON – Hotel RON in IND and CAM discussed with MWG. Hotel reduces FHP risk, FP risk. PACFLT requesting data on RON requirements, similar to what ENG provided. Completed On-trackOff-Track/RecoverableOff-Track not recoverable

14 14 UNCLASSIFIED Engineering Update Site Survey Projects RecommendedSMEE Request Philippines3 schools & 1 medical clinicP&E; Seawall Cambodia3 health centersWater; Bldg Design Indonesia3 health centers & 1 schoolSeismic; Disaster Vietnam2 health centersDisaster; Safety Philippine Project Package preparation (ACB1 lead) Cambodia Project Package preparation (NMCB40 lead) Indonesia Project Package preparation (ADF lead/NMCB40 Alt) Vietnam Project Package preparation (NMCB40 lead) Engineering SMEE Plan. Completed On-trackOff-Track/RecoverableOff-Track not recoverable

15 15 UNCLASSIFIED Logistics Update Logistics WG held 6 Mar 12 Logistics Resource Matrix Completed –Identifying Medical Life Support items for Indonesia and Philippines requiring contracted support Funding –APRI, ORF, OCO on track Pharmaceuticals and Consumables –Received 8 pallets initial MedSurge Consumables –Indonesia and Vietnam Estimated Contract Award April Donation Material –Received 48 pallets from LDSC Next Logistics WG meeting scheduled for 20 Mar 12

16 16 UNCLASSIFIED PP12 Supply and Logistics Status FUNDING (7MAR12) 16 CompletedOn-trackOff-Track/RecoverableOff-Track not recoverable Item / TaskStatusActionDate ReqNotes APRICPF/ SUPPO 5MAR12 - APRI ($1.7M of $1.9M required received) - $205K in queue earmarked for DLA MedSurge consumable procurement ORFC7F/ CDS-7/ SUPPO 1APR12 - ORF plan developed - Draft message completed pending CDS-7 review and approval OCOCPF/ SUPPO 15APR12 - Requirements data forwarded to CPF - Review in progress

17 17 UNCLASSIFIED 17 Completed On-trackOff-Track/RecoverableOff-Track not recoverable Item / TaskStatusActionDate ReqNotes Indonesia Load List SUPPO 31MAR12 - Estimated contract award April 2012 - DLA commenced initial purchase of standard consumable items - Initial MedSurge consumable items delivered 6 March Philippines Load List SUPPO 31MAR12 - Standard pharmaceutical items requisitioned - DLA commencing initial purchase of standard consumable items - Initial MedSurge consumable items delivered 6 March Vietnam Load List SUPPO 31MAR12 - Estimated contract award April 2012 - DLA commencing initial purchase of standard consumable items - Initial MedSurge consumable items delivered 6 March Cambodia Load List SUPPO 31MAR12 -Standard pharmaceutical items requisitioned -DLA commencing initial purchase of standard consumable items - Initial MedSurge consumable items delivered 6 March PP12 Supply and Logistics Status PHARMACEUTICALS and CONSUMABLES (6MAR12)

18 18 UNCLASSIFIED 18 Completed On-trackOff-Track/RecoverableOff-Track not recoverable Item / TaskStatusActionDate ReqNotes Load PlanMSC/ SUPPO 31JAN12- Load plan developed and approved by MSC MERCY - 240 pallet maximum established Project Handclasp SUPPO 5APR12- 40 pallets scheduled for delivery 15 MAR - Goal established at 60 pallets total LDSCSUPPO 5APR12- 48 pallets received 6 MAR - 93 pallets total received - Weekly deliveries scheduled Worldwide VETs SUPPO 15MAR12- 2 Pallets Received PP12 Supply and Logistics Status DONATION MATERIAL (7MAR12)

19 19 UNCLASSIFIED 19 Completed On-trackOff-Track/RecoverableOff-Track not recoverable Item / TaskStatusActionDate ReqNotes IT & Radio Operator Manning CPF N3/ CDS / 15MAR12 - JCSE IEP (3 ea +OIC= 7 pers ) approved 05DEC Funding issue. - 4+Remote MEDCAP manning - IMEF providing 4 PERS/ 6 PRC-117 Radios Annex K / COMM Plan CPF/ C3F/CTF -76/CDS 15MAR12 - IAW NTTP 3-57 Navy HCA OPS and NWP 3-29 - Country CIS inventory and CONOPS Plan developed at MPC. - OPTASK COMMS will include daily plan based on CONOPS and Japanese ship COMMs capability BGAN SATCOM CPF N6/ CDS POST- MPC - Not required for PDSS. (17OCT11 CDS-7 N6 email). - OPTEST CPF BGANs (MAR12). - Develop CONOPS for BGAN use. - ADVON BGAN training by MERCY TBD Host Nation Spectrum Mgt C7F/CTF -76 /CDS 01MAR12 - Awaiting C7F response to CDS-7 01FEB request for frequency assignments and restrictions for each host nation. Info rcvd 21FEB12. ENCAP CIS Requirements CDS 15MAR12 - CDS determine CIS requirements. PP12 CIS Information Systems Status (07MAR12)

20 20 UNCLASSIFIED 20 Completed On-trackOff-Track/RecoverableOff-Track not recoverable Item / TaskStatusActionDate Req Notes PAO NetworkCPF PAO/N6 / CDS/ MERCY 15MAR12 - Defense Video & Imagery Distribution System (DVIDS) : PAO confirmed system is available. Ashore use only. - Verified Fast File Transfer (FFT) SW (version 2.43) Installed in MERCY. FFT ATO pkg in development at DMA. PAO assist in progress PN-NGO Business Center (SSC LANT CHARLESTON) CPF N6 / CDS /MERCY APR12 -SPAWAR PN-NGO Business Center (Wireless and terminals) is the afloat solution. - MERCY to coordinate refresh/OPTEST/training in San Diego by SPAWAR. Funding transfer to SPAWAR in progress - CDS procure printer consumables for entire mission. - IA/business rules provided CDS-7 N6 03NOV11. Partner Nation Interoperability CPF N6 / CDS POST- MPC - Identify JS OOSUMI (LST) CIS POC and CIS capability in progress - Develop CIS Interoperability Matrix in Annex K. Health Engagement Information System (HEIS) CIS WG/ CDS N6 TBD - HERS from MARFORPAC Experimental Center (MEC) is not available -Medical information collection is not a mission requirement. No further action required. PP12 CIS Information Systems Status (07MAR12)

21 21 UNCLASSIFIED 21 Completed On-trackOff-Track/RecoverableOff-Track not recoverable Item / TaskStatusActionDate Req Notes Remote MED- DENCAP /CC Comms Arch CDS / CPF PRE- MPC - Draft CIS Element architecture and inventory under review at CDS-7 (20JAN12) - Completed at MPC. Host Nation MIL C4 PDSS OIC PDSS AAR - PDSS OICs for assessment action. - Training provided to Blue Team 21OCT11. Host Nation CIVIL Comms PDSS OIC PDSS AAR - PDSS OICs for assessment action. - Training provided to Blue Team 21OCT11. Remote Site US Mission CIS Assessment PDSS OIC/ AOIC PDSS AAR - JCSE Planner not included in PDSS. PDSS AOIC to conduct assessments with provided checklists and guidance. - Command Center (CC) Comms assessment. - Training provided to Blue Team 21OCT11. PDSS CIS Comms CPF/ CDS PDSS OICs PRE- PDSS - Iridium Phones: CPF N6 issued phone to Blue OIC. - In country cell phones: MERCY to provide from PP10 mission phones. - Automated Data Collection (8 cell phones app) issued to OIC. PP12 CIS Information Systems Status (07MAR12) No Change

22 22 UNCLASSIFIED 22 Completed On-trackOff-Track/RecoverableOff-Track not recoverable Item / TaskStatusActionDate Req Notes Knowledge Management /Data Protection CDS/ MERCY 7MAR12 - MEDCAP/CDS/Mission Data storage and protection Command Center Ashore CIS CDSPDSS AAR - Identify configuration and location in each country. - Completed at MPC IT SMEE Requests CDSPDSS AAR - PDSS determine scope (SYSADMIN, repair, training, etc.). - No IT SMEE were requested by the host nations SATCOM Requests C3F/ C7F/ CDS MAR12 - Standard USN process. Mission COMMs Readiness CDS / MERCY APR12 - Pre-deployment COMM Checks (DVIDS, FTP, FFT, NMCI FAS, MERCY COMMs Suite) PP12 CIS Information Systems Status (07MAR12)

23 23 UNCLASSIFIED 23 Completed On-trackOff-Track/RecoverableOff-Track not recoverable Item / TaskStatusActionDate Req Notes FSET on MERCY CPF / MSC 13APR12 - Field Service Engineering Team (FSET) rqmt for San Diego to Guam cost estimate from SPAWAR received 16FEB12. SD-Guam -Funding transfer to SPAWAR in progress. End of Mission CIS Exit Plan CPF/ CDS TBD - Hardware: Transfer custody of loaned CIS items back to CPF -Data Exit Plan: TBD VHF Handheld Radios CPF/ CDS MAR12 -CDS determine required quantities ADVON CISCDS MAR12 -Requirements determined at MPC. Under review at CPF N6/N3 Embarked Documentary Team CDS Ongoing -CDS determine requirements and set expectations -Afloat connectivity limited to NGO Business Center Rehearsal CISCDS 01MAR12 -15FEB CDS requirements: Cell phones and 1 UHF voice net. PP12 CIS Information Systems Status (07MAR12) No Change

24 24 UNCLASSIFIED Force Protection Update –USN Force Protection Asset Status MESG1 Det Guam (24 EST, 24 Shore, 2 OIC & AOIC) –Travel Reqs nearly complete for FP Element –On The Horizon EST Mercy FAM and Training (8-9MAR) –24 EST Personnel participating in FP Scenarios Mission Rehearsal Exercise (12-14MAR) –24 EST Personnel participating in FP Scenarios ADVON Travel Tracker Completion –Needed to complete APACS request –Due 30MAR12 –POC’s: Blue – LCDR Weatherup / LT Adams, Gold – LCDR Palacios / LT Nutting

25 25 UNCLASSIFIED Pre-Deployment Travel Requirements Force Protection Update ADVON/FIE ISOPREP –Completed/validated by parent command within last 6 months –https://prmsglobal.prms.af.smil.mil/prms21 5/default.htmhttps://prmsglobal.prms.af.smil.mil/prms21 5/default.htm AOR location specific brief –Completed by parent command N2 or FPO Level I ATFP (OCONUS) –NKO eLearning within last 6 months –https://wwwa.nko.navy.mil/portal/home/https://wwwa.nko.navy.mil/portal/home/ SERE 100 B –NKO eLearning within last 18 months –https://wwwa.nko.navy.mil/portal/home/https://wwwa.nko.navy.mil/portal/home/ IATP / APACS –Completed by ADVON OIC/AOIC for ADVON and ENG OIC for FIE https://iatp.pacom.mil/ https://apacs.dtic.mil/apacs/ SIE (Mil) ISOPREP –Completed/validated by parent command within last 6 months –https://prmsglobal.prms.af.smil.mil/prms21 5/default.htmhttps://prmsglobal.prms.af.smil.mil/prms21 5/default.htm AOR location specific brief –Completed by embarked N2, NCIS, or FP OIC Level I ATFP (OCONUS) –NKO eLearning within last 6 months –https://wwwa.nko.navy.mil/portal/home/https://wwwa.nko.navy.mil/portal/home/ SERE 100 B –NKO eLearning within last 18 months –https://wwwa.nko.navy.mil/portal/home/https://wwwa.nko.navy.mil/portal/home/

26 26 UNCLASSIFIED CAWG Update (29 FEB) Item / TaskStatusActionDate ReqNotes CJ-CMCC Concept Paper Dev CPF N5 15 FEB -Completed -Chops received and incorporated from DESRON, PP 09, 10, 11 reps, COE-DMHA (IHC) -CMCC concept document inputs received during MPC TTX. CMCC Battle Rhythm Sych DESRON19 JAN - Inputs submitted to DESRON. Non-Medical SMEE CONOPS Draft Plan CAWG23 JAN -Complete - Plan details will continue to be added, as possible, between now and ADVON deployment. However, CONOP finalization will not occur until ADVON. Operational Assessment Plan CAWGMAR 12 - Assessment WG has produced draft task list which will be socialized and refined during WGs. -Geared toward MOPs NGO and Partner Nation Engagement Process CAWG / CPF N5 MPC - 90% plan post MPC but add-ins will be ongoing. No Change

27 27 UNCLASSIFIED CAWG Update (29 FEB) Item / TaskStatusActionDate ReqNotes PN Participation CAWG01 MAR 12 -Singapore will participate in VT only -Costa Rica drops out -Probably French add soon - Expect PN manning lists end of Feb NGO Specialties Assignment CAWG / MWG Mid-March Specialty requests are back from NGOs/PN and will distribute this list back to MTF for additional input, comments & requests. -95% details by 01 MAR - 90% by name by 15 MAR Donation Plan CAWG DESRON01 MAR 12 - Philippines and Cambodia donation lists with DESRON for approval - Indonesia and Vietnam lists still with USEMB No Change

28 28 UNCLASSIFIED Projected HN/PN Participation by Mission Country (29 FEB 2012) Host / Partner Nation Material / Platform Support Personnel Participation by Port SDHIGUIDRP VNKMGUHISD POC IndonesiaFP, Engineers, Medical LCDR Chris Giacomaro GiacomaroCM@state.gov Philippines FP, Engineers, Medical LCDR Scott Alms AlmsSC@state.gov Vietnam FP, Engineers, Medical LTC Wayne Turnbull TurnbullPW@state.gov Cambodia FP, Engineers, Medical LTC Kristin Means MeansKA@state.gov MeansKA@state.gov Australia Medical 15-20 PAX Engineer Section CMDR Kenneth Walters: kenneth.walters@defence.gov.au SQNLDR Owen Gardner, owen.gardner@defence.gov.au. Canada Medical/Dental 9 May 15 Pax 4 July15 Pax 4 Sep CAPT Lee Gagne LEE.GAGNE@forces.gc.ca Japan JMSDF Ship Aircraft (C-130 or KC-767) Medical Team: 20-30 pax LCDR Haga : j j3haga@js.mod.go.jpj j3haga@js.mod.go.jp New Zealand8-12 PAX Medical Team MAJ Andrew Brooks andrew.brooks@nzdf.mil.nz SingaporeMedical team Major Chow Weien: CHOW_Weien@starnet.gov.sg CHOW_Weien@starnet.gov.sg Thailand Medical, Engineers and CA Approx 15 Pax LCDR Jason Starmer starmer@jusmagthai.org starmer@jusmagthai.org ROK CAPT Steve Merrll MerrillSR@state.gov Chile 1 PAXMedical5 July 24 July LCDR Julian Maldonado Julian.maldonado.cl@navy.mil Costa Rica1 PAX Medical 25 APR LCDR David L Ricci riccidl@tcsc.southcom.mil UAE1 PAX Medical CDR James C. Anderson MarbleAD@state.gov No Change

29 29 UNCLASSIFIED Projected NGO Participation by Mission Country (29 FEB 2012) Host / Partner Nation Material / Platform Support Personnel Participation by Port SDHIGUIDRP VNKMGUHISD POC LDS Medical, Engineering, SMEEs, Donations 3557 5167 Dr. Susan Puls PulsSu@lsdchurch.org UCSD PDS Medical, Engineering, SMEEs 5153+ 54+ 50+ Dr. Irv Silverstein dsilverstein22@cox.net Project Hope Medical, SMEES 16 Lynn Bemiller lsbemiller@gmail.com World Vets Veterinary, SMEEs 6 6 7 6 Katie Horn katie@worldvets.org UH NursingMedical 5 5 44 Kristine Qureshi kqureshi@hawaii.edu UH Engineering Engineering 2222 Ashish Babbar ashishbabbar@gmail.com Project Handclasp Donations0000 LT Aron Rotklein aron.rotklein@navy.mil Global GrinsDonations0000 Joselyn Miller joselyn.miller@globalgrins.org Vietnam Medical Assistance Program Medical TBD Nguyen nguyen.nguyen@vnmap.org Totals115139134145 In-Country NGOs Indonesia Philippines Vietnam Cambodia Help for Orphans(?)Calbayog Rotary ClubCompassion Flower TDB Hope World WideGIZ (TBD)Vietnam Woman’s Union ASWHO No Change

30 30 UNCLASSIFIED Public Affairs Update -Admin Working to replace PA ADVON Lead for IND Asst ADVON for VNM, KHM identified -Media Coordination Coordinating Defense Logistics Agency (DLA) request to take B-roll, still photography of PP12 load-on and interview MERCY Suppo week of 23 APR. Purpose: Education videos and AFN spots

31 31 UNCLASSIFIED Public Affairs Update Item/TaskStatusActionSuspense Date Notes PAGCDS PA CPF PA TBD Draft to CDRE 15 DEC Routing will happen D-30 to 45 days Preparing MRX DC media trip/mission announcement CDS PAAPR 2012 Coordinating draft concept w/ MSC and BUMED Public Affairs. PP Fact SheetCDS PA, CPF PA 30 DEC Mission info to NAVINFO WEST for vetting Smartphone SOP CIWG, CPF Social Media 15 MAR Online presence/Social Media CDS PA, CPF PA 9 DEC 07 MAR CPF PA telecon re: online presence/social media plans. 31 Completed On-trackOff-Track/RecoverableOff-Track not recoverable

32 32 UNCLASSIFIED Public Affairs Update Item/TaskStatusActionSuspense Date Notes Equipment requirements CDS PA, NPASE 31 MAR Dialogue initiated w/ MERCY on 04 JAN BGAN support- emergency use only, provided by CPF COMCAM PO&AM inputsCDS PA, CPF PA 14 DEC Due to FOPS. PA-specific updates in progress Media Training Plan CDS PA 30 APR 05 MAR – Basic media/TV media training w/ MTF CO 12 MAR – MRX media prep w/ leadership COMREL purchase list CPF PA 24 FEB CPF PA commencing w/ purchase order 32 Completed On-trackOff-Track/RecoverableOff-Track not recoverable

33 33 UNCLASSIFIED PP12 Communication Integration Identified initial list of communication “products” at MPC – Posters, gifts, backpacks, SMEE aids, etc. Coordinating communication assessment support for PP12 (MAY – SEP 12) – Working with CPF N01H and N5 to develop assessment approach – Linguist candidates to support in-country media analysis, and CA/PA engagement IND (1), TAG (3), VIET (2), CAMB (0) CIWG will transition to the PAWG.

34 34 UNCLASSIFIED PP12 Communication Integration 34 CompletedOn-trackOff-Track/RecoverableOff-Track not recoverable Item / TaskStatusActionDate ReqNotes Stakeholder Analysis CIWG15 NOV - Initial product completed. Briefing with Commodore Morgan scheduled for early Dec. Characterize Information Environment CPF N2/N39 15 NOV – 30 JAN -Political Military Economic Social Infrastructure and Information (PMESII) product status is as follows: Cambodia 100%, Indonesia 100%, Vietnam 100%, Philippines 100%. Communication Strategy/ Implementation Plan CPF N2/N39 31 DEC - This product will detail integrated approach for internal, external messaging. This product will be a draft until finalized as an Annex to the CPF PP12 Campaign Plan. Identify/Coordinate key messaging events CIWG15 JAN - Identified; coordinating CIWG support: -- ETG Leadership Training -- MPC Assessment planning -- SLV support Develop messaging products CIWG/ CPF N2/N39, PA 15 APR - Identified initial information products to support mission execution. Researching feasibility, and working with mission SMEE coordinators to ID additional requirements; coordinating with PACOM, SOCPAC, USARPAC, in-country teams. NO CHANGE

35 35 UNCLASSIFIED PP12 Communication Integration 35 CompletedOn-trackOff-Track/RecoverableOff-Track not recoverable Item / TaskStatusActionDate ReqNotes Develop communication MOE Indicators CIWG/ N2/N39 15 JAN - Draft indicators developed as part of overall PP12 assessment effort. Define Communication assessment methodology CPF N2/N39 30 JAN - Completed communication assessment framework and methodology for incorporation into overall PP12 assessment effort. Coordinate and monitor communication during execution CPF N2/N39 During PP12 - Identified initial monitoring requirements, resources and tools to support communication assessment, such as media analysis. Conduct communication assessment CIWGDuring PP12 - Not started. Develop AARCPF N2/N39, PA 30 SEP - Not started. NO CHANGE

36 36 Planning Timeline UPDATED: 07MAR12

37 37 UNCLASSIFIED Mission Commander Priorities Country CONOPS Development –29FEB: CONOPS and Medical/Eng Annexes forwarded to CPF (COMPLETE) –CONOPS Engineering Annex (COMPLETE) –CONOPS Medical Annex (IN PROGRESS) –CONOPS Veterinarian Annex (IN PROGRESS) –TBD: Post CONOPS to APAN (pending approval) ADVON Composition / Notification –Composition approved by CPF –Notification in progress by OIC/AOIC Collecting following information: contact info, passport, GOVCC, ATFP requirements, visas Voyage Planning –CPF major sked change request approved (expect msg later this week) –MERCY transit plan 291731Z FEB 12 CSFTP endorsement 011817Z MAR 12 Endorsements remaining: C3F, CTF76, C7F

38 38 UNCLASSIFIED Mission Commander Priorities (continued) MRX Planning –08MAR: MRX planning TELCON (#3) Participants: MTF MERCY, USNS MERCY, HSC 21, ENG, EST, CDS7: OPS, FP, Comms, & PAO reps –MRX Participant list finalized –All participants must be on MERCY messdecks on Monday, 12MAR at 0730-1200 for MRX pre-sail conference/briefs Pre-deployment Briefings –27MAR 1400 PST (272200ZMARR12) – C3F –02APR 1630 PST (030030ZAPR12) – CTF76 (VTC) –09APR 1630 PST (100030ZAPR12) – C7F (VTC) –TBD – CPF (13APR – proposed) Concerns –Manning Unfilled billets 16x USA CA billets (351 st ) –JCSE funding –Timeline for dissemination of CONOPS on APAN to NGOs, PNs, HNs, etc for planning

39 39 UNCLASSIFIED Closing Questions/Comments CPF Staff State Dept – Mr. Weinz AUS HQ JOC HQ JFNZ JSDF FLC-Yokosuka C7F C3F CTF 76 351 st Civil Affairs Command DLA Troop Support - Pacific 30 th NCR ETG HSC-21 DET 2 MCAST USNS MERCY CDS-7

40 40 UNCLASSIFIED 40 BACKUPS

41 41 UNCLASSIFIED Contact List Working Group CPF MedicalMr. Dean Tano 808 471 2463 dean.tano@navy.mil LogisticsLCDR Tim Graham 808 474 7814 timothy.graham@navy.mil CommsMr. Mike Gurath 808 474 6382 michael.gurath@navy.mil Force Protection Capt James McKeon 808 471 8229 james.mckeon@navy.mil Comm Integration CDR Ingrid Rader ingrid.rader@navy.mil Working Group CPF EngineeringMr. Gary Basham 805 982 6102 gary.basham@navy.mil Civil AffairsLCDR Ric Arthur 808 474 4458 richard.c.arthur@navy.mil Public AffairsLT Lauren Gammache lauren.gammache@navy.mil 808 471 3769 Country Desk RP, CB, VN LCDR John Rios 808 474 9633 john.j.rios@navy.mil Country Desk ID Mr. Takashi Yamamoto 808 4746912 takashi.yamamoto@navy.mil 41

42 42 UNCLASSIFIED Contact List ORGContact CPFLCDR Rob Hulse 808 474 8526 robert.g.hulse@navy.mil CPFLCDR Dave Leather 808 471 8661 David.leather@navy.mil CPFCDR Joyce Blanchard 808 474 6954 joyce.blanchard@navy.mil C3FMAJ Sean Williams 619 767 4803 sean.p.williams@navy.mil C7FCDR Tom Long thomas.long@lcc19.navy. mil ORGContact CTF-76LTJG Joel Hammen joel.hammen@fe.navy.mil AUSSQNLDR (O4) Owen Gardner +612 6128 4027 owen.gardner@defence.gov.au JPNLCDR Haga j3haga@jso.mod.go.jp NZMAJ Andrew Brooks DDI: +64 4 529 6124 Andrew.brooks@nzdf.mil.nz 42