Presentation is loading. Please wait.

Presentation is loading. Please wait.

NEESgrid Early Adopter Program Sridhar Gullapalli USC/Information Sciences Institute + The SI Team + EA Team.

Similar presentations


Presentation on theme: "NEESgrid Early Adopter Program Sridhar Gullapalli USC/Information Sciences Institute + The SI Team + EA Team."— Presentation transcript:

1 NEESgrid Early Adopter Program Sridhar Gullapalli USC/Information Sciences Institute + The SI Team + EA Team

2 2 Agenda n Introduction: 11:15 to 11:30 AM (Sridhar Gullapalli) –Outline and goals: –People on each team –POC –E-Mail Lists n EA Plan: 11:30 to 11:45 AM (Sridhar Gullapalli) n EA Plan Discussion: 11:45 AM to 12:15 PM (Laura Pearlman) n Next Steps: 12:15 PM to 12:45 PM (Doru Marcusiu) –Site Responsibilities –SI Team Responsibilities

3 3 The EA Plan (11:30 AM to 11:45 AM) SG

4 4 Architecture Approach (System Architecture Document) n Develop common infrastructure that can used across all NEES applications –Balance generic mechanisms, extensibility for future growth, efficiency for application specific tasks n Validate against user requirements –Input from user requirements analysis, site visits n Extending proven grid technologies n Developing custom solutions for NEES specific requirements (e.g. Data, DAQ, Video services)

5 5 The Early Adopter Program (from the EA Document) n Spiral Model –Iterative deployment, testing and refinement –Timeline roughly 6 months (this phase) n EA sites –RPI, Reno, Oregon State n Shadow Sites and other users – NEES Equipment Sites –Researchers in Earthquake Engineering field

6 6 The Generic EA Experiment: The Preparation Phase

7 7 Generic Experiment in Progress (an instance or “test”)

8 8 Conclusion of a “test” or “run” Change/adjust parameters and repeat test or conclude experiment or revise experiment

9 9 Partial listing of components n Collaboration Tools n Local (on-site) Storage & Central Data Repository n DAQ n Prototype Data Models and Services n Streaming data services n Streaming video Services n Tele-operations (control will not be supported during the EA Phase) n NEESPOP and Services

10 10 Global Timelines n Communicating PlanApr 15 n Tracking NMI releaseMay 7 n Strawman data modelApr 15 n LabVIEW setup at ANL/ISIMay 15 n NEESPOP, Video Server and Local Storage Solution, LabVIEW DAQ (version 6.1) setup and installation at EAJun 1 n Prototype Telepresence server at EAJul 1 n Streaming data specification Aug 1 n Streaming data implementation (based on LabVIEW version 6.1)Aug 1 n Initiate Experiments phase 1Jul 15 n Conclude Experiment Phases Oct 15

11 11 EA Plan Discussion: 11:45 AM to 12:15 PM (LP) n Is the generic experimental model accurate? Representative? n Are site specific modes accurate? n Tune up details

12 12 Next Steps: 12:15 PM to 12:45 PM (DM) n Site Responsibilities (DM) –Status of Equipment and Software purchase NEESPOP Video Server (Linux box) + cameras + appliances Local Storage Solutions DAQ: Setup and LabVIEW 6.1 installation –Hardware Installation –Access to systems by SI team –Define Experimental Requirements –Define Experimental Procedures –Learn/Use Collaboration Tools

13 13 SI Team Responsibilities n Installation and Configuration (12:30 to 12:45 PM) –NEESpop Grid Services software Data management tools Support Software –Video Server (hardware and software) (NZ) –Local Storage Solutions (JF) –Data Acquisition Services (PH) –Collaboration Tools (EH, JL) –Support Issues (DM)

14 14 The SI Team: n USC/ISI –Carl Kesselman carl@isi.eduSI Co-PIcarl@isi.edu –Sridhar Gullapalli sridhar@isi.edu ISI Project Managersridhar@isi.edu –Laura Pearlman laura@isi.edu Lead System Architecturelaura@isi.edu n Argonne National Labs –Ian Foster foster@mcs.anl.govSI Co-PIfoster@mcs.anl.gov –Nestor Zaluzec zaluzec@aaem.amc.anl.gov Lead (Tele-Operations/DAQ)zaluzec@aaem.amc.anl.gov –Paul Hubbard hubbard@mcs.anl.govLead System Architecture (Tele-Ops, DAQ)hubbard@mcs.anl.gov –Bill Allcock allcock@mcs.anl.gov ANL Project Managerallcock@mcs.anl.gov n U Michigan –Tom Finholt finholt@umich.edu CO-PI User Requirements and Collaboration Toolsfinholt@umich.edu –Elizabeth Wierba, User Requirements –Jeremy Birnholt jbirnhol@umich.edu User Requirements –Joseph Hardin Collaboration Tools –Lars Schumann larsi@umich.edu Collaboration Toolslarsi@umich.edu –Erik Hofer ehofer@umich.edu Collaboration Toolsehofer@umich.edu –John Leasia jleasia@umich.edu Collaboration Toolsjleasia@umich.edu –Peter Knoop knoop@umich.edu Collaboration Toolsknoop@umich.edu –Glenn Golden ggolden@umich.edu Collaboration Toolsggolden@umich.edu

15 15 The SI team (continued) n NCSA –Tom Purdhomme tip@ncsa.uiuc.edu PItip@ncsa.uiuc.edu –Kyran D. Mish kdmish@llnl.gov, Deputy Director, NEESgridkdmish@llnl.gov –Cristina Beldica cbeldica@ncsa.uiuc.edu Project Manager –Randy Butler rbutler@ncsa.uiuc.edu Deployment Leadrbutler@ncsa.uiuc.edu –Joe Futrelle futrelle@ncsa.uiuc.edu Data Model and Servicesfutrelle@ncsa.uiuc.edu –Doru Marcusiu marcusiu@ncsa.uiuc.edu Deploymentmarcusiu@ncsa.uiuc.edu –Chase Phillips cphillips@ncsa.uiuc.edu Deploymentcphillips@ncsa.uiuc.edu –Kazi Anwar kazi@ncsa.uiuc.edu Deploymentkazi@ncsa.uiuc.edu –John Towns jtowns@ncsa.uiuc.edu Deploymentjtowns@ncsa.uiuc.edu –M Butler mbutler@ncsa.uiuc.edu, Deploymentmbutler@ncsa.uiuc.edu –Jason Alt jalt@ncsa.uiuc.edu Deploymentjalt@ncsa.uiuc.edu –David Gehrig dgehrig@ncsa.uiuc.edu Technical Writerdgehrig@ncsa.uiuc.edu –Jeff Gaynor jgaynor@ncsa.uiuc.edu Deploymentjgaynor@ncsa.uiuc.edu

16 16 The EA Teams n Oregon State –Solomon Yim solomon.yim@orst.edu Professor & PI of Tsunami Basin Project,solomon.yim@orst.edu –Ken Ferschweiler kennino@nacse.org Softwarekennino@nacse.org –Charles Sollitt, Charles.Sollitt@orst.edu Director of Wave Research Laboratory,Charles.Sollitt@orst.edu –Terence Dibble, Terence.Dibble@orst.edu Wave Research LaboratoryTerence.Dibble@orst.edu –David Standley, David.Standley@orst.edu SoftwareDavid.Standley@orst.edu n Reno –Ian G. Buckle, igbuckle@unr.edu PIigbuckle@unr.edu –Manos E. Maragakis, maragaki@ce.unr.edu Co-PI data/video sharing and live videomaragaki@ce.unr.edu – Sherif Elfass, elfass@unr.edu Manages research and information serviceselfass@unr.edu –Gokhan Pekcan, pekcan@unr.edu Laboratory Research Engineer and NEES Project Manager (POC)pekcan@unr.edu n RPI –Tarek Abdoun abdout@rpi.edu Co-PI of RPI's NEES project, Manager of the RPI centrifuge and NEES projectabdout@rpi.edu –Ricardo Dobry, PI –Christophe Dupre duprec@scorec.rpi.edu NEES Network Consultantduprec@scorec.rpi.edu –Mourad Zeghal, zeghal@rpi.edu Co-PI and Point of Contactzeghal@rpi.edu –Tom Zimmie


Download ppt "NEESgrid Early Adopter Program Sridhar Gullapalli USC/Information Sciences Institute + The SI Team + EA Team."

Similar presentations


Ads by Google