Presentation is loading. Please wait.

Presentation is loading. Please wait.

Warm Springs Extension Alignment 0 Fremont Central Park Subway Line, Track, Station and Systems BART Overpass (City of Fremont Grade Separation Project)

Similar presentations


Presentation on theme: "Warm Springs Extension Alignment 0 Fremont Central Park Subway Line, Track, Station and Systems BART Overpass (City of Fremont Grade Separation Project)"— Presentation transcript:

1 Warm Springs Extension Alignment 0 Fremont Central Park Subway Line, Track, Station and Systems BART Overpass (City of Fremont Grade Separation Project) Fremont Station Warm Springs/South Fremont Station Fremont Central Park South Subway Portal North Subway Portal North Ventilation Structure Lake Elizabeth South Ventilation Structure Irvington Station (Future) Walnut Ave. Washington Blvd. Auto Mall Pkwy. S. Grimmer Blvd. Mission Blvd. BART Overpass Paseo Padre Pkwy. Stevenson Blvd. 0 Tie-in Point for SVBX Project 0

2 Subway Work Progress 1

3 LTSS Work Progress 2

4 WSX Project Schedule Subway Contract Project Completion Spring 2013 LTSS Contract Revenue Service Fall 2015 3

5 Project Location 4

6 HMC and Hayward Shop Modifications Site Plan Hayward Shop Vehicle-level Overhaul Shop Component Repair Shop Central Warehouse Non-Revenue Vehicle and M&E (Maintenance & Engineering) Shop and Storage Yard Hayward Maintenance Complex (HMC) 123 New Track Access 5

7 Contract 1 Site Plan Component Repair Shop Hayward Shop Modifications BART Mainline 6

8 Tie-ins and crossover Contract 2 Site Plan 7

9 8


Download ppt "Warm Springs Extension Alignment 0 Fremont Central Park Subway Line, Track, Station and Systems BART Overpass (City of Fremont Grade Separation Project)"

Similar presentations


Ads by Google