NLC MAC Meeting 6-8 Nov. 2002 Linac Girder Studies and Plans C. Boffo Slide 1 Linac Girder Studies and Plans C. Boffo – E. Borissov – H. Carter Fermilab,

Similar presentations


Presentation on theme: "NLC MAC Meeting 6-8 Nov. 2002 Linac Girder Studies and Plans C. Boffo Slide 1 Linac Girder Studies and Plans C. Boffo – E. Borissov – H. Carter Fermilab,"— Presentation transcript:

1 NLC MAC Meeting 6-8 Nov. 2002 Linac Girder Studies and Plans C. Boffo Slide 1 Linac Girder Studies and Plans C. Boffo – E. Borissov – H. Carter Fermilab, Technical Division RF Technology and Development Group

2 NLC MAC Meeting 6-8 Nov. 2002 Linac Girder Studies and Plans C. Boffo Slide 2 OUTLINE  Strongbacks for NLCTA  First delivery (FXB001/2)  Near future plans (FXB003-12)  NLC Girders development  Stability Measurements  Vibrations – HLS – Movers – FEM/FEA  Schedule & Budget

3 NLC MAC Meeting 6-8 Nov. 2002 Linac Girder Studies and Plans C. Boffo Slide 3 Strongbacks For FXB002/3  SLAC Style  Fit up to 2 structures or 1 structure + instrumentation  Maintain the same beam line length as SLAC strongbacks in NLCTA 61.34 59.25

4 NLC MAC Meeting 6-8 Nov. 2002 Linac Girder Studies and Plans C. Boffo Slide 4 Strongbacks For FXB002/3 Mockup Instrumentation from SLAC Shipping supports

5 NLC MAC Meeting 6-8 Nov. 2002 Linac Girder Studies and Plans C. Boffo Slide 5 Strongbacks ->NEXT STEP  Extend the strongback to accommodate 3 structures with the minimum impact on the NLCTA setup  Reduce the length of the drift pipes; add bellows to compensate for thermal deformations (3 mm) ~94” FXB004FXB005FXB006 eyelet Available space 89”

6 NLC MAC Meeting 6-8 Nov. 2002 Linac Girder Studies and Plans C. Boffo Slide 6 NLC Girder Development  Stability measurements  Vibration measurements  Motors and gears  HLS  FEM / FEA Simulations

7 NLC MAC Meeting 6-8 Nov. 2002 Linac Girder Studies and Plans C. Boffo Slide 7 Stability measurements (SM)  Study the effect of thermal cycles on the girder assembly. (started in 1998 C. Adolphsen) GOALS Investigate about the sensitivity of the girder + structures complex to thermal variations due to the water cooling and heat generation.

8 NLC MAC Meeting 6-8 Nov. 2002 Linac Girder Studies and Plans C. Boffo Slide 8 SM Single station test

9 NLC MAC Meeting 6-8 Nov. 2002 Linac Girder Studies and Plans C. Boffo Slide 9 SM Mockup in MP8 In the process to: Calibrate and align the sensors. Connect the water system. Test the electronics and DAQ. Mockup in MP8 Wire connection Water connections PLANS Reproduce SLAC measurements and improve the setup by substituting: actual tubes -> dummy structures with disks with the same Inertia as C type actual 4.5 m support -> 6 m long girder

10 NLC MAC Meeting 6-8 Nov. 2002 Linac Girder Studies and Plans C. Boffo Slide 10 Long term plan: Upgrade this mockup by steps in order to create a real girder “NLC style” fully instrumented to perform all needed tests SM Mockup in MP8

11 NLC MAC Meeting 6-8 Nov. 2002 Linac Girder Studies and Plans C. Boffo Slide 11 Vibrations Collaborate with SLAC (Seryi, Le Pimpec) to: Perform vibration measurements on the Girder complex. Determine effect on stability due to water cooling system on FNAL structures. Transmission of vibrations to quads Hardware: Geophones DAQ system Software: SLAC Labview applications

12 NLC MAC Meeting 6-8 Nov. 2002 Linac Girder Studies and Plans C. Boffo Slide 12 Motors and movers Build a complex of 2 cams system to: Understand the limits of the application Perform tests on hardware Perform tests and familiarize with controls Actual quote: 2 stepper motors$ 5000 x 2 2 gear boxes$ 2500 x 2 control system$ 1000 $ 16,000

13 NLC MAC Meeting 6-8 Nov. 2002 Linac Girder Studies and Plans C. Boffo Slide 13 Hydrostatic Level System Contacts with groups at FNAL and SLAC that use HLS to monitor ground motion in tunnels. Need to build know-how in adapting the devices to work on girders COSTS: Sensors (4) $ 2,500 / each Software $10,000 $20,000

14 NLC MAC Meeting 6-8 Nov. 2002 Linac Girder Studies and Plans C. Boffo Slide 14 SIMULATIONS Create solid model of structure on strong back using TD resources Involve FNAL PPD group for finite element analysis Perform thermal and mechanical stress analysis Perform vibration modes analysis As soon as we converge on a design for Girders extend simulations on the full complex Verify FEA results with experimental data where possible PLANS No work as been pursued in this direction yet. Need to generate a solid model first in order to begin the process. STATUS

15 NLC MAC Meeting 6-8 Nov. 2002 Linac Girder Studies and Plans C. Boffo Slide 15 ACTIVITIES AND BUDGET FY03 Budget for girders and strongbacks $50K Stability measurements $ 10K (5K) Movers$ 20K HLS$ 20K Strongbacks production$ 10K (2K) Simulations ? Spent

16 NLC MAC Meeting 6-8 Nov. 2002 Linac Girder Studies and Plans C. Boffo Slide 16 SCHEDULE NLCTA STRONGBACKS: Build and deliver strongback for FXB003 01/03 Design and build strongback for FXB004/5/6 04/03 Build and deliver strongback for FXB007/8/9 07/03 Build and deliver strongback for FXB010/11/12 10/03 SLABILITY MEASUREMENTS: Complete calibration and start routine measur. 01/03 Implement FXB dummy structures 04/03 Implement 6m long “static” girder 07/03 VIBRATION MEASUREMENTS: Start measurements on dummy structures 01/03 MOVERS – HLS – SIMULATIONS: Depending on FUNDING and TIME availability

17 NLC MAC Meeting 6-8 Nov. 2002 Linac Girder Studies and Plans C. Boffo Slide 17 SUMMARY Work on girder development has begun at FNAL Just as everyone else we are experiencing funding limitations. Time and engineering resources are limited due to the involvement in other projects. Future work on NLCTA strongbacks for the 8 pack test will not require significant engineering resources.


Download ppt "NLC MAC Meeting 6-8 Nov. 2002 Linac Girder Studies and Plans C. Boffo Slide 1 Linac Girder Studies and Plans C. Boffo – E. Borissov – H. Carter Fermilab,"