Presentation is loading. Please wait.

Presentation is loading. Please wait.

Operations in HEAnet Brian Nisbet NOC Manager. Operational Overview 30+ Technical Staff. – 75% of whom participate in NOC Duty. 60+ Clients. Expanding.

Similar presentations


Presentation on theme: "Operations in HEAnet Brian Nisbet NOC Manager. Operational Overview 30+ Technical Staff. – 75% of whom participate in NOC Duty. 60+ Clients. Expanding."— Presentation transcript:

1 Operations in HEAnet Brian Nisbet NOC Manager

2 Operational Overview 30+ Technical Staff. – 75% of whom participate in NOC Duty. 60+ Clients. Expanding Services Catalogue. 400+ L2 P2P circuits. 120+ iBGP peerings, across 80+ physical circuits.

3 What’s a service? Everything is a service! General Internet Service is the core HEAnet offering. Many, many services on top of the network, more user interaction. Increasing size has lead to increased need for automation across all services.

4 Layer 2 Network Layer 2 network (called Bluenet) was built with with an integrated provisioning tool. Automatic provision of links, monitoring & alerting. Complete database of all links. Basic config put on switch, topology tool uses CDP to find switch, then allows for automatic provision. Some early issues, but none for many years.

5 Layer 3 Network - Core 2 core routers (Cisco CRS-1s), 2 route reflectors (Cisco 7301s). CPE devices are a mixture of Cisco & Juniper devices. Not all CPE controlled by HEAnet. IGP running on CRSes & 7301s. – OSPF for IPv4 – IS-IS for IPv6 – Soon to be IS-IS for all eBPG to external peers.

6 Layer 3 Network - Clients 2 x iBGP peerings per client. – One to each Core router. Private ASes used in nearly all situations. Default network sent to clients. Client routes: – Advertised by network statements – Controlled by prefix-lists on both CPE & Core. BGP config mandated by HEAnet.

7 Layer 3 General Internet Templates Two links per client, different local prefs, different MEDs. Link addresses pulled from predefined pool. Templates used where possible (and by now, it’s possible everywhere). https://wiki.heanet.ie/BGP_Design,_Customer Conformity/mandating the BGP config has improved things greatly.

8 Other Layer 3 Services Not just one network on the network. Other services still follow template model where possible. Large amount of work, both operational & political goes into keeping this sane.

9 Equipment Over 80% of CPE supplied by HEAnet. Unlikely to ever reach 100%. – Client needs, exceptional circumstances etc. Templates need to be adaptable to major vendor code. So far only IOS, IOS-XR & JUNOS.

10 Wish List Ultimate aim would be to make L3 network more like L2. Several different models: – Tool creates config, manually applied. – Automatic config, applied in staging area. – Virtual CPE, whole config automatic. – Initial config manual, basic connectivity, links automatic. – Config templates always useful.

11 L3 Provisioning Tool Pool of link addresses & private ASes. – Grab the next /30 & /64 Client networks – access to routing registry? Multiple types of link. – General Internet – Pool A – Special Network – Pool B – Temporary Network – Pool C Short term virtual routers. – L2 port becomes entry point to new network.

12 L3 Provisioning Tool DNS Monitoring – Graphing, alerting, configuration Management – Access control, ACL applications & updates etc. Mapping


Download ppt "Operations in HEAnet Brian Nisbet NOC Manager. Operational Overview 30+ Technical Staff. – 75% of whom participate in NOC Duty. 60+ Clients. Expanding."

Similar presentations


Ads by Google