Download presentation
Presentation is loading. Please wait.
Published byNickolas Long Modified over 9 years ago
1
AAE 450 Spring 2008 William Yeong Liang Ling 1/31/2008 Propulsion Cost Model of Balloon and Aircraft Assisted Launch Credit to Stephanie Morris, Jerald Balta and Alex Woods for their assistance Propulsion
2
AAE 450 Spring 2008 Balloon Cost Propulsion Launch vehicle mass500kg1000kg2000kg3075kg Cost of balloon launch (Helium) $58,000$96,000$172,000$254,000 Cost of balloon launch (Hydrogen) $57,000$95,000$169,000$249,000 Aircraft Cost (White Knight) Maximum payload of 3075kg Altitude = 15,000m Price: $25,150 Notes:Breakeven height increases with gross weight (32,133m at 3075kg) Minimum breakeven height (500kg) is 27,000m Costs rounded to nearest thousand. Credit to: Stephanie Morris for contacting Scaled Composites for pricing figures and Jerald Balta for coding partnership and obtaining scaling figures
3
Possible additional costs Aircraft Insurance, $600,000/year, $50,000/month Existing ground station will not suffice for orbital launch Future Work Integration with other codes Output tensile force for Structures Further refining costs Balloon (in constant cost regime, 3,075kg) Tugboat standby: $1,000/day, 2 weeks = $14,000 Tugboat insurance: $4,000 Tugboat operation: $12,000/day, 2 days = $24,000 Total: $42,000 Credit to: Stephanie Morris for contacting Scaled Composites for pricing figures and Alex Woods for tugboat operational costs AAE 450 Spring 2008 Propulsion
4
AAE 450 Spring 2008 Cost breakdown (Aircraft (White Knight), 3,075kg, 15,000m) ItemCost Hourly rate ($4,410 for 5 hours)$22,050 Crew hourly rate ($620 for 5 hours)$3,100 TOTAL$25,150 Credit to Stephanie Morris for contacting Scaled Composites for figures Propulsion
5
AAE 450 Spring 2008 Cost breakdown (Balloon, 500kg, constant cost regime) ItemCost Helium$4,000 Hydrogen$3,000 Gondola Avionics$14,000 Gondola Refurbishing$20,000 Gondola Payload Assembly$20,000 TOTAL (Helium)$58,000 TOTAL (Hydrogen)$57,000 Credit to Jerald Balta for coding partnership and obtaining scaling figures Propulsion
6
Cost breakdown (Balloon, 1000kg, constant cost regime) ItemCost Helium$7,000 Hydrogen$6,000 Gondola Avionics$28,000 Gondola Refurbishing$41,000 Gondola Payload Assembly$20,000 TOTAL (Helium)$96,000 TOTAL (Hydrogen)$95,000 Credit to Jerald Balta for coding partnership and obtaining scaling figures AAE 450 Spring 2008 Propulsion
7
Cost breakdown (Balloon, 2000kg, constant cost regime) ItemCost Helium$14,000 Hydrogen$11,000 Gondola Avionics$55,000 Gondola Refurbishing$83,000 Gondola Payload Assembly$20,000 TOTAL (Helium)$172,000 TOTAL (Hydrogen)$169,000 Credit to Jerald Balta for coding partnership and obtaining scaling figures AAE 450 Spring 2008 Propulsion
8
Cost breakdown (Balloon, 3075kg, constant cost regime) ItemCost Helium$22,000 Hydrogen$17,000 Gondola Avionics$85,000 Gondola Refurbishing$127,000 Gondola Payload Assembly$20,000 TOTAL (Helium)$254,000 TOTAL (Hydrogen)$249,000 Credit to Jerald Balta for coding partnership and obtaining scaling figures AAE 450 Spring 2008 Propulsion
9
Credit to Jerald Balta for coding partnership AAE 450 Spring 2008 Propulsion
10
Credit to Jerald Balta for coding partnership AAE 450 Spring 2008 Propulsion
11
Credit to Jerald Balta for coding partnership AAE 450 Spring 2008 Propulsion
12
Credit to Jerald Balta for coding partnership AAE 450 Spring 2008 Propulsion
13
Credit to Jerald Balta for coding partnership AAE 450 Spring 2008 Propulsion
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.