Download presentation
Presentation is loading. Please wait.
Published byRandolph Whitehead Modified over 9 years ago
1
doc.: IEEE 802.15-01/527r1 Submission November 2001 John Barr, MotorolaSlide 1 Project: IEEE 802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3 Closing Report 16Nov01] Date Submitted: [16Nov01] Source: [John Barr] Company [Motorola] Address [1303 E. Golf Road, Schuamburg, IL 60196] Voice:[+1 847 576-8706], FAX: [+1 847 576-6758], E-Mail:[John.Barr@Motorola.com] Re: [01453r7P802-15_TG3-Nov01-Meeting-Objective-and-Agenda.xls] Abstract:[TG3 Chair Report to 802.15 WG] Purpose:[TG3 chair report to WG to update them on work completed in Austin.] Notice:This document has been prepared to assist the IEEE 802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release:The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by 802.15.
2
doc.: IEEE 802.15-01/527r1 Submission November 2001 John Barr, MotorolaSlide 2 IEEE 802.15 Working Group for Wireless Personal Area Networks TG3 Closing Report November 2001, Austin, TX USA 802.15
3
doc.: IEEE 802.15-01/527r1 Submission November 2001 John Barr, MotorolaSlide 3 Agenda Goals of November Meeting Major Accomplishments Goals for January Meeting
4
doc.: IEEE 802.15-01/527r1 Submission November 2001 John Barr, MotorolaSlide 4 Goals of the November Meeting Conference call status, including approval of any ad hoc business Review draft (D08) comments Resolve comments and open issues Create amendments document for D08 to D09 Complete drafting update to D09 Prepare WG letter ballot for D09 Prepare for Post-January sponsor ballot Schedule RevCom if necessary
5
doc.: IEEE 802.15-01/527r1 Submission November 2001 John Barr, MotorolaSlide 5 Major Accomplishments Addressed all open technical issues in previous drafts. Resolved how security will be handled Draft amendments approved for generation of D09 that will go to letter ballot. Adopting the 802.3 comment resolution tools.
6
doc.: IEEE 802.15-01/527r1 Submission November 2001 John Barr, MotorolaSlide 6 Draft Status report D08 D08 released 7 November 2001 D08 approved by TG3 on 12 November 2001 New edits Updated draft with new technical content Closed all outstanding technical issues 23 editorial issues still outstanding New text due to Gilb by 27 November 2001 D09 due out by 6 December, 2001
7
doc.: IEEE 802.15-01/527r1 Submission November 2001 John Barr, MotorolaSlide 7 Comment status Type of issueMondayThursday Open220 Assigned8823 (all E’s) Written3249 Closed132219 Withdrawn1022 Open - new issue Assigned - pending resolution Written - Resolution approved, text in document Closed - Resolution in draft, appoved by commenter Withdrawn - Withdrawn by commenter
8
doc.: IEEE 802.15-01/527r1 Submission November 2001 John Barr, MotorolaSlide 8 Status All open technical items in D08 were closed or written and will be included in D09 All changes representing these issues are captured in approved amendment document 01/496r1 and security document 01/530r3. (vote to approve 16/0/0) The motion to forward the Draft Standard 000d09P802-15_TG3 for letter ballot passed the Task group with a vote of 19/0/1
9
doc.: IEEE 802.15-01/527r1 Submission November 2001 John Barr, MotorolaSlide 9 WG Motion To recommend 802.15 WG move Draft Standard 000d09P802-15_TG3 to Letter Ballot no later than December 7 th, with the condition that it is first amended with the accepted draft amendment document 01/496r1 and security document 01/530r3. Moved: Jim Allen Second: Jay Bain 26/0/1
10
doc.: IEEE 802.15-01/527r1 Submission November 2001 John Barr, MotorolaSlide 10 Goals for January Conference call status, including approval of any ad hoc business. Letter Ballot Comment resolution Sponsor Ballot Initiation Or – Ballot Recirculation Update Draft as Required (D10 or D11) Call for Patents
11
doc.: IEEE 802.15-01/527r1 Submission November 2001 John Barr, MotorolaSlide 11 Next Steps 802.15.3 Conference Call Tuesday, Nov. 20, 10AM CST to address D09 Completion Draft sections due to James Gilb by Nov. 27 th. 40-day Letter Ballot starts on Dec. 7th Letter Ballot ends on January 19th Questions
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.