Presentation is loading. Please wait.

Presentation is loading. Please wait.

Doc.: IEEE 802.15-01/212r0 Submission May 2001 John Barr, MotorolaSlide 1 Project: IEEE 802.15 Working Group for Wireless Personal Area Networks (WPANs)

Similar presentations


Presentation on theme: "Doc.: IEEE 802.15-01/212r0 Submission May 2001 John Barr, MotorolaSlide 1 Project: IEEE 802.15 Working Group for Wireless Personal Area Networks (WPANs)"— Presentation transcript:

1 doc.: IEEE 802.15-01/212r0 Submission May 2001 John Barr, MotorolaSlide 1 Project: IEEE 802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3 Opening Report 13May01] Date Submitted: [13May01] Source: [John Barr] Company [Motorola] Address [1750 E. Golf Road, Schuamburg, IL 60173] Voice:[+1 847 576-8706], FAX: [+1 847 538-4253], E-Mail:[John.Barr@Motorola.com] Re: [01201r3P802-15_TG3-May01-Meeting-Objective-and-Agenda.xls] Abstract:[TG3 Chair Report to 802.15 WG] Purpose:[TG3 chair report to WG to update them from the last session on all work items.] Notice:This document has been prepared to assist the IEEE 802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release:The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by 802.15.

2 doc.: IEEE 802.15-01/212r0 Submission May 2001 John Barr, MotorolaSlide 2 IEEE 802.15 Working Group for Wireless Personal Area Networks TG3 Opening Report May 2001, Orlando, FL USA 802.15

3 doc.: IEEE 802.15-01/212r0 Submission May 2001 John Barr, MotorolaSlide 3 Agenda Goals of May Meeting IEEE 802.15.3 PAR Status and plans for TG3 May Document List

4 doc.: IEEE 802.15-01/212r0 Submission May 2001 John Barr, MotorolaSlide 4 Goals of the May Meeting Conference call status, including approval of any ad hoc business. Review Draft D0.4 Comments. Resolve comments and open issues. Create amendments documents for D0.4 to D0.5. Complete drafting update to D0.5. (Prepare letter ballot of D0.5. Authorize Letter Ballot of D0.5.) Now just RFC. Security Discussion -> r4 of Graphic. Prepare goals and plans for May-July.

5 doc.: IEEE 802.15-01/212r0 Submission May 2001 John Barr, MotorolaSlide 5 IEEE 802.15.3 PAR Wireless Medium Access Control (MAC) and Physical Layer (PHY) Specifications for High Rate Wireless Personal Area Networks (WPAN) –… wireless connectivity with fixed, portable and moving devices within or entering a Personal Operating Space (POS) (up to 10 meters in all directions enveloping a person) –… interoperability or coexistence with other 802.15 TG –… coexistence with other wireless devices in conjunction with Coexistence Task Groups such as 802.15.2 –… low complexity, low cost, low power –… >20Mbps to satisfy a set of consumer multi-media industry needs for WPAN communications.

6 doc.: IEEE 802.15-01/212r0 Submission May 2001 John Barr, MotorolaSlide 6 Status and Plans for TG3 Construction of Initial Draft Goal: MAC/PHY standard of high rate WPAN Schedule Goal: Produce a Standard by the end of 2001 or early 2002 Next Steps Goal: Resolve comments/issues with current task group draft (D.0.4), May, 2001. Working Group draft, July, 2001. Sponsor ballot, November, 2001.

7 doc.: IEEE 802.15-01/212r0 Submission May 2001 John Barr, MotorolaSlide 7 Teleconference Calls Goal: Release updated draft from Hilton Head (D0.3), prepare new proposed draft for review (D0.4), identify outstanding issues and work to be completed. 802.15.3 General: Held every Tuesday between F2F meetings. PHY Committee: Every other Thursday. MAC Committee: Every Tuesday following general 802.15.3 call. System Committee: No calls scheduled. Email work.

8 doc.: IEEE 802.15-01/212r0 Submission May 2001 John Barr, MotorolaSlide 8 MAC Summary Report the activities of the TG3 MAC committee since Hilton Head –6 Con-Calls –Intensive review of draft 0.2 and 0.3 –Some initial review of draft 0.4 –Identification, categorization and Prioritization of –Open issues –Some initial resolution of Open Issues Activities Planned for Orlando: –Collect, Categorize and Prioritize new Open Issues from draft 0.4 –Resolve open MAC issues –Resolve MAC/PHY interface issues –Collect resolved issues into MAC amendment doc. –Summary and Vote on MAC amendment Doc. –Identify and assign tasks leading into Portland meeting

9 doc.: IEEE 802.15-01/212r0 Submission May 2001 John Barr, MotorolaSlide 9 Systems Summary Hilton Head action items are in Draft 0.4 Phy SAP/PHY PIB, are ready for WG review. MAC SAPs have a number of issues in MLE, MAC SAP, and MAC PIB, May - Stay active with PHY and MAC to deal with PIBs, SAPs and systems issues in real time. May need spot re-reviews. No original presentations planned.

10 doc.: IEEE 802.15-01/212r0 Submission May 2001 John Barr, MotorolaSlide 10 PHY/Draft Summary PHY time will be yielded to MAC This week –Some PHY staff are not able to be here. –Good Progress in PHY. Some Issues to resolve, but progress is being made. Siep to give presentation Monday on Draft Comment processes. Draft reviews and Writing sessions will be yielded as necessary. Collect PHY Amendments as a result of System and MAC discussions.

11 doc.: IEEE 802.15-01/212r0 Submission May 2001 John Barr, MotorolaSlide 11 May Document Summary (1 of 2) 00127r5 – TG3 Project PlanAllen 01104r0 – TG3 Hilton Head MinutesKinney 01114rx – TG3 MAC Issue ListHeberling 01122rx – PHY Issue ResolutionGilb 01186r2 – Systems Committee Report and PlanRoberts 01190rx – MAC Committee Running Minutesxxx 01191rx – PHY Committee Running Minutesxxx 01216r0 – PHY Committee Report and PlanGilb 01217r0 – Drafting Progress ReportGilb 01218r0 – PHY Committee May Working DocumentGilb 01219r0 – MAC-PHY Issue ResolutionGilb

12 doc.: IEEE 802.15-01/212r0 Submission May 2001 John Barr, MotorolaSlide 12 March Document Summary (2 of 2) 01220r0 – TG3 PHY Draft D0.4 AmendmentsGilb 01221r0 – TG3 MAC Draft D0.4 AmendmentsGilb 01222r0 – TG3 System Draft D0.4 AmendmentsGilb 01223r0 – TG3 Publicity PresentationB/A/K 01224r0 – Draft Comment Resolution MethodsSiep 01235r0 – MAC Committee Report and PlanHeberling 01242r0 – Effects of OQPSK on CAZACKaraoguz 01244r0 – Header error rate analysisLing 00000d03P802-15-3__Draft_Standard.pdfGilb 00000d04P802-15-3__Draft_Standard.pdfGilb

13 doc.: IEEE 802.15-01/212r0 Submission May 2001 John Barr, MotorolaSlide 13 Key May Sessions Monday: Review of committee work and resolution of outstanding issues. Overview of current draft (D0.4). Tuesday: Resolution of MAC and Systems issues and preparation of baseline draft amendments. Wednesday: Resolution of PHY issues, overview chapter, and MAC planning meeting. Thursday : Voting on MAC, PHY, and System amendments, and vote on baseline draft. Thursday: 802.11e Security Presentation Thursday: Standard drafting, committee reports, Updating project plan, May-July work plan, and WG report.

14 doc.: IEEE 802.15-01/212r0 Submission May 2001 John Barr, MotorolaSlide 14 No work next week Conference calls will not resume until week of May 29th. Questions Attendees this week (straw poll). Tuesday Dinner (straw poll). (18 would attend) Closing Meeting (Straw poll). Network tear down (Straw poll).

15 doc.: IEEE 802.15-01/212r0 Submission May 2001 John Barr, MotorolaSlide 15 Congratulate Mary Duval Completed here Systems Engineering Degree. Graduates This weekend.


Download ppt "Doc.: IEEE 802.15-01/212r0 Submission May 2001 John Barr, MotorolaSlide 1 Project: IEEE 802.15 Working Group for Wireless Personal Area Networks (WPANs)"

Similar presentations


Ads by Google