Presentation is loading. Please wait.

Presentation is loading. Please wait.

Running BMR TPA report. 1.Double Click Reports>Request>Financial 2.Check that Individual Reports is selected 3. Click OK This report is designed to print.

Similar presentations


Presentation on theme: "Running BMR TPA report. 1.Double Click Reports>Request>Financial 2.Check that Individual Reports is selected 3. Click OK This report is designed to print."— Presentation transcript:

1 Running BMR TPA report

2 1.Double Click Reports>Request>Financial 2.Check that Individual Reports is selected 3. Click OK This report is designed to print a one page summary of a schools TPA analysis code range.

3 Check Box is ticked Click dots

4 Enter BMR 13% (13 = school number) Click Find

5 Select Report Click OK

6 Change date Click Submit This is where you could enter segment over-ride Analysis codes. e.g. AA13001001 5013021300 (PARENT) 5413011200 (PARENT)

7 Click View>Requests Click Find

8 Click Refresh Data to check if report is completed Click View Output

9 Click File>Save As …. To save your text file

10 PRINTING Click File>Print preview

11 If required Change orientation Page size

12 OR… View report in Word Open File Select View All Files Select file Open

13 File needs reformatting Narrow Margins in File Page Setup to 0.5 cm

14 File needs reformatting Change font to 8 or 9

15 Page breaks should now be in place to allow printing of multiple reports

16 For Oracle queries (including general queries with running reports) contact insrvConnect@cf.ac.uk. For queries specific to these instructions or to this report please contact Accounts@cf.ac.uk"


Download ppt "Running BMR TPA report. 1.Double Click Reports>Request>Financial 2.Check that Individual Reports is selected 3. Click OK This report is designed to print."

Similar presentations


Ads by Google