Presentation is loading. Please wait.

Presentation is loading. Please wait.

EE/CS 480 Fall 2007 1September, 2007 University of Portland School of Engineering Project Goldeneye Freshmen Engineering Database for the University of.

Similar presentations


Presentation on theme: "EE/CS 480 Fall 2007 1September, 2007 University of Portland School of Engineering Project Goldeneye Freshmen Engineering Database for the University of."— Presentation transcript:

1 EE/CS 480 Fall 2007 1September, 2007 University of Portland School of Engineering Project Goldeneye Freshmen Engineering Database for the University of Portland (FEDUP) Team John Doxtator Kevin Farr Christopher Taketa Advisor Dr. Ward Industry Representative Mr. Todd Gentry

2 EE/CS 480 Fall 2007 2September, 2007 University of Portland School of Engineering Overview Introduction Scorecard Additional Accomplishments Plans Issues/Concerns Conclusions

3 EE/CS 480 Fall 2007 3September, 2007 University of Portland School of Engineering Introduction Database application with a user interface Audience: Freshmen engineering teams, tool room workers Purpose: Invoice creation, parts, team, and employee look-up Benefits: More reliable system

4 EE/CS 480 Fall 2007 4September, 2007 University of Portland School of Engineering Scorecard November plans: –Project Plan.95 completed –Project Plan 1.0 completed –Theory of Operation 0.9 Project Plan 0.95 and 1.0 completed Theory of Operations

5 EE/CS 480 Fall 2007 5September, 2007 University of Portland School of Engineering Additional Accomplishments Functional Specification revised to 1.1 (approved by CCB and advisor) Designed database Confirmed the tools we had chosen (C#, SQL Server,.NET framework) would be sufficient to accomplish our project

6 EE/CS 480 Fall 2007 6September, 2007 University of Portland School of Engineering December Plans Design Review Theory of Operation 0.9 Survive until Christmas Break

7 EE/CS 480 Fall 2007 7September, 2007 University of Portland School of Engineering Milestones NumberDescriptionOriginal 9/25/07 Previous 10/30/07 Present 11/27/07 1Product Approved9/9/07 2Functional Spec Approved10/9/07 3Project Plan Approved10/26/07 4Design Review11/23/07 11/30/07 5Theory of Operation 0.912/07/07 12/07/07 - ? 6Theory of Operation Approved 1/18/08 7Screen Graphics Completed2/1/08 8Database Completed2/6/08 9System Integrated2/27/08 10Alpha Release3/12/08 11Prototype Release3/12/08 12Founder’s Day4/8/08 13Final Report Approved4/25/08 14Turn Over System4/26/08

8 EE/CS 480 Fall 2007 8September, 2007 University of Portland School of Engineering Concerns/Issues Concerns –May not complete Theory of Operations 0.9 by Dec. 7 th –Extra functionality was introduced in FS 1.1 Solutions –Readjust completion date for TOP 0.9 to beginning of spring semester –Up the hours per week we work for those first two weeks –Meet the fours days previous to spring semester

9 EE/CS 480 Fall 2007 9September, 2007 University of Portland School of Engineering Conclusions Database with GUI for Freshmen Engineering Competition Completed Project Plan 0.95 and 1.0 Revised Functional Specification to 1.1 Any questions?


Download ppt "EE/CS 480 Fall 2007 1September, 2007 University of Portland School of Engineering Project Goldeneye Freshmen Engineering Database for the University of."

Similar presentations


Ads by Google