Presentation is loading. Please wait.

Presentation is loading. Please wait.

University Of Jordan Faculty Of Engineering And Technology Industrial Engineering Department Motion and Time Study.

Similar presentations


Presentation on theme: "University Of Jordan Faculty Of Engineering And Technology Industrial Engineering Department Motion and Time Study."— Presentation transcript:

1 University Of Jordan Faculty Of Engineering And Technology Industrial Engineering Department Motion and Time Study

2 Group # 9 *Members Of The Group*

3 Apply the macro motion study techniques on a part of a product which is the paper. Think of a new –more efficient– method than the present method. The objectives

4 Why we choose the Jordan university press? It produces a lot of books, lab manuals, researches done by faculty members and university magazines. Its closeness.

5 The Binding Paper Its Size is (50X70) cm containing 32 pages of the size P5 (17 X 24 cm).

6 Process Description

7 Entering the printing hall. Print 500 copy of one binding paper in the offset printing machine.

8 Sent to a table by jack. Inspection and individualization.

9 Send it to the folding machine by hand. Fold.

10 Moved manually to floor. Delay.

11 Move to table by hand. Organize

12 Move to the assembly machine by a jack. Assemble with cover page by glue.

13 move to the cooling machine by a conveyor. Cooling.

14 Move to the tri-scissors saw machine. Cutting.

15 Move to table by conveyor. Inspection. Move out by jack.

16 Flow diagram for present method D

17 5 10 15 20 25 30 35 Folding Organizing Assembly with cover page Cooling Cutting Binding paper Printing Individualization Cover page Glue Operation chart

18 Move out Operation process chart D Organizing Cooling Assembly with cover page Wait Move to machine Move to floor Folding Inspection and individualization Move to table Move to machine Cutting Inspection Printing Move to hall printing 35 25 15 20 30 10 5 Cover pageBinding paper Glue Move to table

19

20

21 Route chart Part name: Binding paper Date: 6-12-2010 Quantity: 500 A B C Operation Number Operation and Tooling Machine Name Description 5 Printing Offset printer 15 Folding Folding Machine 30 Assemply Assemply and Gluing Machine 35 Cooling Cooling Machine 40 Cutting Tri-scissors Saw Machine

22 Proposed method

23 We can not. Every step is important. Elimination

24 We can not. There is no machine combines two operations together, technician said. Combination

25 Machines can be moved. Reduce distance traveled. Eliminate cross traffic. Rearranging

26 Flow diagram for present method D

27 D Flow diagram for propose method

28 Move out D Organizing Cooling Assembly with cover page Wait Move to machine Move to table Folding Move to table Move to machine Cutting Inspection Printing Move to hall printing 35 25 15 20 30 10 5 Cover pageBinding paper Glue Inspection and individualization Move to table Operation process chart

29

30

31 Thank you


Download ppt "University Of Jordan Faculty Of Engineering And Technology Industrial Engineering Department Motion and Time Study."

Similar presentations


Ads by Google