Download presentation
Presentation is loading. Please wait.
Published byCory Stevenson Modified over 9 years ago
1
A sensor architecture for neutrino telescopes on behalf of the KM3NeT consortium Els de Wolf Thank you, Claudio!
2
Buoy OM 10 kV / 400V ~2.6 km 3 300 slender strings 6000 optical modules ~100 MEuro Branch cable network on the seabed Junction box
3
Features of the architecture Flexible and slender string structure Optical fibre network for communication Single high pressure transition per storey Few (active) components in the deep ‐ sea No application specific components in the deep-sea No fault (leak)propagation from one storey to the other or from one string to the other One wet ‐ mateable connections per string (Innovative deployment: 1/~15) Minimum of material in the deep sea ‘Low’ cost 3 reliability
4
Analysis of DUMAND/Antares/NEMO/Nestor Flexible string works Fibre network works Reliability can be further enhanced Costs can be reduced 4
5
Reliability analysis Minimise probability of water leaks Minimise number of pressure transitions 5 1(2?) transition (1 OM) ~Same photocathode Electronics and all other instrumentation a single container 9 transitions (3 OMs + Hydrophone) 1 transition
6
multi-PMT optical module No separate electronics container Single pressure transition per storey (optical module = storey) 6 (talk Paul Kooijman)
7
7 Nikhef Open Day 10/10/2009 Temperature measurements in multi-PMT optical module
8
Sensor concept for readout&DAQ Laser light from shore is modulated in the (optical) module with the data through reflective modulators. Readout on heart-beat of laser pulses from shore Front-end functionality moved to shore. 8 laser
9
Sensor architecture concept Unique optical connection between each module and the shore. 9 laser (talk Jelle Hogenbirk)
10
Reliability of readout/DAQ Only few non-specific active components in the deep sea No application-specific components in the deep sea 10 Designed to our specification by telecom technical consultancy company CIP, using their off the shelf and Bellcore certified items.
11
Communication network 10 Gb/s bandwidth, 50 GHz channel spacing Passive Optical Network using DWDM Fibre propagation time over 100 km measured with precision < 100 ps
12
Electro-optical backbone Flexible hose Oil filled, run at equipressure Break out at each storey Wet-mateable connection to node in branch cable 12 No propagation of failure of one storey to another (talk Eric Heine) First reference model
13
Mechanics of slender string Minimum of material in the deep sea 13 Two dyneema ropes for mechanical strength Simple structure to support optical module
14
Slender string 20 storeys String master module included in break-out-box at storey 9 Low drag Relatively easy to deploy Single wet ‐ mateable connection per string (innovative deployment: very few) 14 Buoy OM BOB & DWDM BOB Anchor Rope Storey 30 m 570m 100m EOC (2 fiber + 2 Cu) DU_CON (talk Eric Heine)
15
Realisation speed up Enlarge weather window for deployment Compact and light deployment structures Increase deployment rate Many strings in a single sea operation. Early start of construction strings Can start while on-shore electronics is still in development 15
16
16 10 kV / 400V Junction box Sea floor: branch cables with nodes Compact deployment of strings Sea floor network of branch cables with nodes node
17
17 Unfurling of the string
18
18 Connect to node in the branch cable ~2.6 km 3 300 slender strings 6000 optical modules ~100 MEuro
19
Effective area 19 Simulation and reconstruction effort started late, but is ongoing Preliminary results are promising. Claudio Kopper 130 m string distance Upgoing tracks only
20
Effective area compared to Antares 20 Antares EnergyAntaresFactor 100 GeV8x10 -5 m 2 -5 (?) 1 TeV0.005 m 2 0.02 m 2 5 10 TeV0.5 m 2 20 m 2 40 100 TeV3m 2 120 m 2 40 1 PeV20 m 2 500 m 2 25 Rough comparison
21
Summary and conclusions Sensor architecture with slender strings is feasible Based on experience of pre-decessors Designed for high reliable Cost effective Easy to deploy Further improvements Improvement/avoidance wet-mateable connections Reconstruction Preparatory phase Prototype string mechanics Prototype electro-optical cable Detailing readout and DAQ Design assembly lines for OM and string Detailing seafloor network 21 Engineering effort together with industry started (first ideas documented)
22
Thank you!
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.