1 14 TH NOV 2014 OPTIMISING POWER AVAILABILITY: ACTION PLAN FOR THE NEXT DECADE 2024

2 1 …) Theme: 10 years too short. Minimum 20-30 years Action plan would depend on that – 10/15/20/30 VISION

3 2 …) Today: IC: 2,54,049 MW Thermal (69.6% - C 152 60%); Hydro (16.4%); Renewable (12.8%); Nuclear (1.9%). CS (27.5%); SS (37.5%); PS (35% C 51 RE 27.8 G 8.8) generation grew 6% in FY 13-14. CAP Added: 17GW Future: IC: 2017: Add 88,537 MW+ 30GW NRE = 318GW IC: 2022 /32 = 462 / 948GW (% Mix: RE 22, G 13, HY 16, N 4, C 45). PEAK DEMAND 2022 / 32: 283 /541 Optimising generation: Challenges / Opportunities: What should be the mix in 2032. Thermal / hydro – 60/40?; RE = 17 / 30. Need for eg. 40/30/30 in 2032 ? Optimising Generation: 2032 / 2027 / 2022 / 2014

4 3 (Contd……) GENERATION - challenges / solutions…

5 4 (Contd……) SIZE 3.1 LCKM / 3.6 (2017) / 5 (2022). 50% > 400KV; 5.6 L MVA/ 6.9/ 12 (2022). ISTS: 44.8GW/ 68 GW in 2017; largest AC grid in world today ISTS / 2032: 240GW Bhu-ER/NER (35) / Nepal- ER (8) Ne+NR (17) / ER-WR & NR & SR: 30/ 45/ 30. WR-SR (35) / WE-NR (35). ER-NER – Bangla (2-5GW), SR- Srilanka (1GW) TRANS….challenges / solutions More Private Sector through Competitive Bidding STEPS TAKEN / BEING TAKEN TBCB – 240 -145 Days / 200 Days – 90; Total: 440 – 235 days Delegation of power to CEA, EC monthly meetings, etc Single parameter bidding, early completion incentivisation GNA, AT/AW/AC ACESS

6 5 (Contd……) SIZE: connections: Crs : 3/13 DISTRIBUTION….challenges /solutions TotalDOM.COM.IND.Plight.Tract.Agri.PWW.MISC. Connx.27.621.62.60.420.1218722.50.090.19 Energy sold %: 824BU22.28.844.40.91.717.81.9 AT&C Losses %: 12-13 All IndiaNRWRSRERNER 25.428.823.417.342.137.6 ManipurUP: 42.8 / J&K: 60.8MP: 31.2Kar: 20.8Bihar: 54.6Man: 85.5 AI14-1515-1616-1717-1818-1919-20 24.320.819.518.317.315.2 AI Losses Reduction Pathway REGIONAL BALANCE OF POWER: 12-13 AI / NR / SR / ER / WR / NER: 914Kwh / 852/ 1093/ 552/ 1283/ 298. Bring all to 3000kWh World Avg. – require - 3.2/3.5/3/6/2.3/10x

7 5.62 Cr households (Rural: 5.04 Cr, Urban: 0.58 Cr) – Not covered as per Census 2011. State specific “Action Plan” in partnership with them. Cost sharing among Centre, State and Consumers Covering gaps in T & D network. Leverage central power allocation / UMPP for mandating enhanced supplies to rural areas 8 States already supply 22 to 24 hours Remaining States can achieve within 3 to 5 years. Rural Feeder Separation -DDUJGY- Rs 50 k crs 100% metering of Consumers – IPDS – Rs 30k crs ARR-ACS GAP (tariff rationalisation) ….. 24x7 Power For All: Agenda for States 6

8 …. Amendments to Electricity Act 2003 & Tariff Policy Carrier – Current segregation: Competition in retail. Choice to consumers. Accountability & Independence of Regulators Timely and regular Tariff determination. Enhance RPO with strict enforcement. Zero tolerance on Grid Safety and Security. 7 THANK YOU