By Anthony Moody Rhys Porter Nicolas Wilson.  Background  Objectives  Design  Normal Operation  Logic  Failure  Issues and solutions  Improvements.

Similar presentations


Presentation on theme: "By Anthony Moody Rhys Porter Nicolas Wilson.  Background  Objectives  Design  Normal Operation  Logic  Failure  Issues and solutions  Improvements."— Presentation transcript:

1 By Anthony Moody Rhys Porter Nicolas Wilson

2  Background  Objectives  Design  Normal Operation  Logic  Failure  Issues and solutions  Improvements

3 Level Crossing:  Flags as indicators  Patent of Level Crossing  Electronic Bells  Cross-Buck “X” sign

4  12 Digital Inputs  4 Inputs able to run as analog  6 Relay Outputs  LCD Display  Operating Buttons Functions:

5  Design and Implement a Level crossing using analogues available in the lab and Moeller  Fail safely and appropriately handle exceptional cases

6  Fail Safe  Moeller Easy “PLC”  Power Supply  Strobe Light as bells

7  Proximity Based Train Detection  Safety Conscious Design  Verbose Fault/Warning Memory for Diagnosis and Reporting  Some Automatic Fault Recovery  Intersection Obstruction Detection  10 effective outputs from 6 SSRs  Emergency Stop  Fail Safe on Controller Power Loss

8

9  Wait for train  Trigger warning lights  Lower boom gates  Set train lights accordingly throughout  As train leaves do in reverse order

10

11

12 Simplified Underlying Logic

13  Loss of power to controller  Sensor failure (boom gates)  Emergency switch  Obstructed intersection  Train detection failure  Erroneous train signals to boom gate

14  Issue: Limited outputs  Solution: Use external transistor with diode or gate  Issue: Potentiometer too sensitive  Solution: Use rheostat in series with resistor

15  Moeller Expansion Module if required  Active monitoring to larger control system

16


Download ppt "By Anthony Moody Rhys Porter Nicolas Wilson.  Background  Objectives  Design  Normal Operation  Logic  Failure  Issues and solutions  Improvements."