Project Team: Project Lead: Jared Mukina (Electrical Engineering) Brian Nguyen (Computer Engineering) Nou Lee (Computer Engineering) James Lee (Electrical.

Similar presentations


Presentation on theme: "Project Team: Project Lead: Jared Mukina (Electrical Engineering) Brian Nguyen (Computer Engineering) Nou Lee (Computer Engineering) James Lee (Electrical."— Presentation transcript:

1 Project Team: Project Lead: Jared Mukina (Electrical Engineering) Brian Nguyen (Computer Engineering) Nou Lee (Computer Engineering) James Lee (Electrical Engineering Technology) Rona Vo (Electrical Engineering) Kurt Fischer (Electrical Engineering)

2 1. Problem Statement 2. Load 3. Design Overall system block diagram Detailed circuit schematics Psuedocode 4. Design Requirements Performance Verifications 5. Feasibility Manufacturability With in budget/resources Meets requirements/ safety 6. Risks FMEA

3  Create a functioning system that incorporates a photovoltaic (PV) array, in addition to a battery bank, to supply one kW to a load for a time period of 5 hours.

4  EPIC cart battery charging station. *NOTE: Load will dictate adjustments in the system design.

5 Epic charging dock is being under review of this location Proposed Area for Shed Proposed Area for Electric carts

6 The entire roof will consist of all PV arrays and it has to be interchangeable and watertight

7

8 1 2

9

10

11 Psuedocode if (power of PV >= (1.3*power of Load)) { if 13.8< battery1 < 14.2 or 13.8<battery2 <14.2 { relay1=OFF relay2=OFF relay3=ON printf("relay 1= OFF,relay 2= OFF,relay 3 = ON" ); } else if((battery1 < 13.8) or (battery2 < 13.8)) { relay1=ON; relay2=OFF; relay3=ON; printf("relay 1= ON relay 2= OFF relay 3 = ON" ); } if(power of PV<(1.3*power of Load)) { relay1=ON; relay2=ON; relay3=OFF; printf("relay 1= ON, relay 2= ON, relay 3 = OFF" ); if(Power of PV <1.3*(P load)) { relay1=ON; relay2=OFF; relay3=OFF; printf("relay 1= ON, relay 2= OFF, relay 3 = OFF" ); }

12

13  The P.V. physical testing can not be completed properly until the P.V. system is set up outside for real time data testing.

14

15 AfterBefore

16  Batteries are alive.  Batteries need to be charged from PV subsystem to charge quickly.

17

18  1KW average per hour for 5 hours.  2KW average peak for 1 hour.  Max power point tracking to maintain steady DC voltage.  AC output must be 120 ± 5% volts at a frequency of 60 ± 1% Hertz  Protected device ◦ Relay ◦ Breaker ◦ Gauge sizing

19  By eliminating the DC-DC converter, microcontroller and the Relays, the cost of our product is cheaper by ~$1000.  Cheaper

20  Complexity of the design.  Outback Power Systems  Construction of housing.

21  A budget of $2000 was provided. MaterialPrice Circuit Breaker$100 Wires$100 Housing$750 Simulation Software$200 Total$1150

22

23  High current.  High voltage.  Structural Integrity.  Component overheating.

24  The system has grid tie capability.  If the PV/battery sub system can not produce the necessary power, power can be pulled in to system from the grid.

25  The final design should work as expected.  All the criteria should be met.  The load should consume enough energy.  Excess energy will be delivered to the grid.

26 1. Farid Golnaraghi and Benjamin C. Kou. Wiley, 2010. Automatic Control Systems. 9 th ed. Intext Citation: (Golnaraghi and Kou, 2010 p.g-p.g.) 2. 2012 IEEE Vehicle Power and Propulsion Conference, Oct. 9-12, 2012, Seoul, Korea Intext Citation: (2012 IEEE Oct. 9-12) 3. Prusty, K. B., Ali S. M., and Sahoo K. D. “Modeling And Control of Grid-Connected Hybrid Photovoltaic/Battery Distributed Generation System.” International Journal of Engineering Research & Technology (IJERT). URL: http://www.ijert.org/browse/november-2012-edition 4. “map_pv_national_hi-res_200.jpg.” www.nrel.gov. 2013. Accessed 9/8/13. http://www.nrel.gov/gis/images/map_pv_national_hi-res_200.jpg 5. “map_csp_national_hi-res.jpg.” www.nrel.gov. 2013. Accessed 9/8/13. http://www.nrel.gov/gis/images/map_csp_national_hi-res.jpg 6. “gem-e4-golf20-cart.jpg” gliccc.wordpress.com. 2011. Accessed 9/26/13. http://gliccc.files.wordpress.com/2011/05/gem-e4-golf20-cart.jpg

27 Questions?