1 G E O T H E R M A L C O M M U N I T I E S An FP7 CONCERTO project

2 G E O T H E R M A L C O M M U N I T I E S FACT SHEET Project acronym: GeoCom Project full title:Geothermal Communities – demonstrating the cascading use of geothermal energy for district heating with small scale RES integration and retrofitting measures Funded period: 01.01.2010. – 31.12.2014 Total budget: 11.541.696 EUR EC funding: 3.513.704 EUR Coordinator: Geonardo Ltd. Number or beneficiaries: 16

3 G E O T H E R M A L C O M M U N I T I E S OBJECTIVES Pilot scale implementation of geothermal energy applications Energy efficiency measures by means of retrofitting and optimalisation Integration of geothermal resources with other RES developing and implementing an efficient monitoring system for the demonstration activities applied technological research on system integration, applications and optimalisation to help the demonstration activities of the project to be more efficient detailed socio-economic research and studies for the public perception and to ease the preparation of similar future projects, pro-active training and dissemination activities initiate and facilitate the networking of interested Communities by setting up Mayor’s Geothermal Club

4 Coordinator:Geonardo Environmental Technologies Ltd. (HUN) SOFTECH Energia Technologia Ambiente (ITA) Slovak Energy Agency (SVK) Polish Academy of Science (POL) Galantaterm (SVK) Macedonian Geothermal Association (MKD) Distretto delle Energie Rinnovabili (ITA) University of Szeged (HUN) Demo sites: Municipality of Mórahalom (HUN) Municipality of Galanta (SVK) Municipality of Montiery (ITA) Bysprav Ltd (SVK) G E O T H E R M A L C O M M U N I T I E S CONSORTIUM Associated cities:Municipality of Oras Sacueni (ROM) Municipality of Subotica (SRB) Municipality of Kocani (MKD) Municipality of Mszczonow (POL)

5 G E O T H E R M A L C O M M U N I T I E S WORK PACKAGES (WPs)

6 MÓRAHALOM One of the two planned CHP engines is installed and test runs are on Solar panels for DHW at the school are 100% installed Replacement of windows and doors at all target buildings are completed, thermal insulation to be done spring 2013. Public procurement for the LED public lighting system is on, bids received MONTIERI Construction of the district heating network started as of 1st October 2012 Retrofitting of the historic city centre to start once the construction and excavation works will be completed COMMUNITY PROGRESS I.

7 G E O T H E R M A L C O M M U N I T I E S GALANTA Project ammendment request has been accepted by the Commission Reduced cost, greater benefit – new public housing estates are being built and connected to Galantaterm Neighboring housing estates taking on the retrofitting initiative represented by the three Concerto buildings PV panels are installed and fully operational on the top of the Concerto buildings Retrofitting of the Concerto area is 90% ready Public procurement for the re-injection well study and implementation has been commenced COMMUNITY PROGRESS II.

8 G E O T H E R M A L C O M M U N I T I E S COMMUNITIY PROGRESS

9 G E O T H E R M A L C O M M U N I T I E S OVERALL PROGRESS

10 G E O T H E R M A L C O M M U N I T I E S For further information on the GeoCom project please contact: Mr. Gabor Kitley Mr. Istvan Pari Geonardo Environmental Technologies Ltd. Graphisoft Park, Building A Zahony utca 7 H-1031 Budapest, Hungary Phone: +36 1 250 6703 Fax: +36 1 436 9038 Web: www.geothermalcommunities.euwww.geothermalcommunities.eu E-mail: coordinator@geothermalcommunities.eu