Shared Generators-LTOA customers WRLDC,Mumbai. NSPCL---NTPC&SAIL JOINT VENTURE,BHILAI.

Similar presentations


Presentation on theme: "Shared Generators-LTOA customers WRLDC,Mumbai. NSPCL---NTPC&SAIL JOINT VENTURE,BHILAI."— Presentation transcript:

1 Shared Generators-LTOA customers WRLDC,Mumbai

2 NSPCL---NTPC&SAIL JOINT VENTURE,BHILAI

3

4 Brief on NTPC-SAIL joint venture 2*250MW M/S Bhilai CPP-II Expansion project. A joint venture of NTPC and SAIL LTOA for 170MW is approved 100MW to DNH & 70MW to D&D under LTOA

5 Brief----Contd… Out of balance 330MW…. 280MW will be transferred to BSP/SAIL through dedicated system owned by BESCL… 50MW to CSEB through exclusive CSEB system

6 Commercial Arrangements NSPCL is connected with WR, ISTS through..400kV NSPCL-Raipur D/C, owned, maintained and operated by NSPCL BSP is connected with NSPCL through.. 220kV NSPCL-BSP two D/Cs

7 Commercial Arrangements…contd CSEB is connected with NSPCL through …..220kV NSPCL-Bhilai-III S/C&..220kV NSPCL-Gurur S/C(tap on 220kV NSPCL-Bhilai-III) CSEB is connected with BSP through..220kV Khedamara-BSP D/C

8 METERING ARRANGEMENTS SEMs(same specification as ours) are installed by NSPCL on..All the out going feeders emanating from 400kV &220kV NSPCL bus..All the GTs and ICTs

9 METERING ARRANGEMENTS SEMs are proposed by WRLDC and installed by NSPCL on …..both ends of 220kV Khedamara- BSP D/C..both ends of 220kV BhilaiIII- NSPCL S/C..At Gurur on 220kV NSPCL- Gurur(tap on 220kV NSPCL-Bhilai- III)

10 Torrent Power Limited,Sugen LTOA-II

11 Torrent Power Limited,Sugen

12 3*365MW(1095MW) generation project at SUGEN LTOA for 500MW approved LTOA customers are yet finalized Balance 595MW will be transferred to TPSEC &TPAEC through their internal lines.

13 Torrent Power Limited,Sugen SUGEN is connected with WR,ISTS through … LILO of 400kV Gandhar-Vapi S/C (completed) …proposed LILO of 400kV Gandhar- Dehgam line-1(temporary arrangement till 400kV PIRANA 400kV S/S of POWERGRID commissioning) …400kV SUGEN-PIRANA D/C ….400kV Pirana(SUGEN)-Pirana(PG) D/C …400kV Dehgam-Pirana S/C

14 Torrent Power…contd. SUGEN is connected with SURAT through three 220kV D/C (to Ved,Puna&Bhatar) SUGEN is connected with GECTO at KIM through 220kV D/C

15 LTOA-III JINDAL POWER LTD,TAMNAR

16 JINDAL POWER LTD

17 4*250MW generation project at Tamnar,CSEB 3*250MW is connected to 400kV bus and 1*250MW is connected to 220kV bus LTOA allowed for 500MW GUVNL=300MW &CSEB=100MW Balance 100MW will proportionately allocate o GUVNL&CSEB

18 JINDAL POWER LTD Jindal is connected with WR grid through 400kV Raipur-Jindal D/C which is built,owned & operated by Jindal Jindal is connected with CSEB through 220kV Rigarh- Jindal(Tamnar) D/C Supply of power ti Jindal Steelplant & Jindal estate through 220kV lines.

19 LTOA-IV LANCO-AMARKANTK THERMAL POWER STATION,PATHADI

20 LANCO-AMARKANTAK THERMAL POWER STATION

21 LANCO-AMRKANTAK 2*300MW generation at Pathadi,Chhattisgarh LTOA approved is 300MW LTOA customer is MPPTCL 400kV Korba-Sipat is made LILO at Pathadi for the evacuation of 300MW of power.

22 Issues related to STOA customers –Treatment of deviations from schedules Option-I:LTOA generator as UI pool member Option-II:LTOA generator as embedded in the host state Option-III:Hybrid model based on case to case basis (not advisable).

23 Issues related to STOA customers..contd. Demarcation of scheduling periphery LTOA generators are separate control areas with a schedule. Example: for Sugen (Torrent), the scheduling periphery becomes Sugen 400kv bus whereas for NSPCL, the scheduling periphery becomes Raipur 400kV, since the lines to Raipur are owned by NSPCL. In the case of Jindal, the scheduling periphery becomes 400kV Raipur. For Lanco, the scheduling periphery is at 400kV Pathodi

24 Issues related to STOA customers..contd. –Is gaming certification required for the LTOA generators on DC or on approved LTOA quantum? –The meters are to be provided by the LTOA customer at their own cost and meters shall have to comply with specifications as per Annexure-2 to Chapter-6 of IEGC.

25 Issues related to STOA customers..contd. –POWERGRID shall have to keep additional stock of around 100 meters and 15 DCDs to meet the requirement of LTOA customers. The cost of the meters shall have to be paid by the LTOA customers. –Maintenance and testing of SEMs at LTOA generators bus as in the case of NSPCL, the SEMs used for accounting shall come under the scope of POWERGRID and the payment for the same to be borne by the LTOA customers.

26 Issues related to STOA customers..contd. –Some LTOA generators are having MPP status and their tariff is fixed by CERC. Whether different treatment is required for such plants? –Treatment of power drawn during construction –Treatment of infirm power from LTOA generators

27 Issues related to STOA customers..contd. Metering Scheduling and Accounting of LTOA customers in WR Metering: Schematic diagrams showing the locations of meters for NSPCL at Bhilai Chattisgarh, LANCO-AMARKANTAK at Patahdi Chattisgarh, Jindal at Tamnar Chattisgarh and Torrent at SUGEN, Gujarat are enclosed at Annexure-I. The committee may approve for the locations and for the number of meters.

28 Issues related to STOA customers..contd. Scheduling: Common scheduling request for mutually agreed quantum signed by LTOA generators and their respective customers shall have to be sent to RLDCs. The scheduling quantum may be specified at injecting utility’s control area periphery. This quantum shall be restricted to their approved LTOA quantum. This arrangement for scheduling is required as the allocations in percentage are not available as in the case of ISGS stations. Similarly revisions of schedules may also be informed to RLDCs