Presentation is loading. Please wait.

Presentation is loading. Please wait.

ALMA North American Science Advisory Committee Meeting August 17, 2007, Charlottesville, VA Overview: North American ALMA Science Center Chris Carilli.

Similar presentations


Presentation on theme: "ALMA North American Science Advisory Committee Meeting August 17, 2007, Charlottesville, VA Overview: North American ALMA Science Center Chris Carilli."— Presentation transcript:

1 ALMA North American Science Advisory Committee Meeting August 17, 2007, Charlottesville, VA Overview: North American ALMA Science Center Chris Carilli

2 2 ALMA Operations: Guiding principles “The exponential advance in capability demands an equally forward-looking and effective operations model and plan. ALMA operations must fully enable the scientific promise of ALMA, through:  maximum efficiency and productiveness of operations,  optimal ease of access and use for a broad community,  fostering a U.S. community that is competitive in the use of ALMA.” (NAASC/NSF proposal)

3 3 ALMA Operations: Core functions AOS: ALMA array, correlator – modular design to mitigate high-site maintenance OSF, San Pedro: Operate array, schedule & calibration QA0 (AoD), basic module repair, Antenna Maintenance SCO: Archive & Pipeline, QA1, Business, Science ARCs Observational Support (OT) Basic analysis support Archive copy & research OSF AoD staffing & QA2 H/W, S/W MR&D Sufficient to deliver pipeline-processed data to users, and support through electronic helpdesk

4 4 ALMA Operations: Full Science Support Full Science support: Required to realize the full scientific potential of ALMA Nationally funded in Europe Advanced User support (Legacy/complex projects) Adv. algorithm/pipeline heuristics Spectral line++ DB and anal.tools Postdocs, students Workshops, schools, tutorials EPO User Grants program: advocate for Decadal committee recommendation; strongly endorsed by ANASAC/Users committees Levels the playing-field for U.S. scientists.

5 5 Activities Aug 2006 - Aug 2007 Major Activity: ALMA operations and NAASC plans  ALMA operations plan (Hibbard) Formulate international operations working group (JAO, Executives) Revise based on Japanese contribution and rebaselined project Reconsider all positions, and tie schedule to construction milestones Internal reviews: NRAO, ESO, NAOJ, ALMA Board International external review at NSF Feb 27,28  NAASC and NA operations NSF proposal (Carilli) Incorporate core functions + full support under single, seamless management structure Fully matrixed into NRAO: E2E, SAA, EPO, NTC Internal reviews: NRAO + Canada, ANASAC ‘red team’ Site visit by NSF review panel plus Carilli, NSF January 2007 NSF review March 1

6 6 NSF Review of ALMA Ops Summary of exit interview comments from review panels ALMA operations planning is more mature and better delineated than any other ground-based observatory in history. The basic assumptions and plan are well founded and justified. Excel spreadsheet is a comprehensive, powerful tool for implementation, and real- time adjustment, of operations ramp-up, coupled closely to the construction schedule. Concerns International communication and coordination. Response: continue IPT structure Rapid ramp-up of skilled labor. Response: current plan captures expertise through transfer of staff as they roll-off construction. Importance of adequate user support for new, complex instrument, especially during early science to early full operations, both in terms of software and man- power. Response: developing contingency plan for (possible) short term increase in user demand during early science/ops.

7 7 Aug 2006 to 2007 Change of J. Hibbard from acting to permanent ARC manager C. Brogan remains NAASC astronomer Support 3.4 CASA programmers Support business manager Sept 2007 - Sept 2008 Two Scientists to perform AoD/CSV duties Two EPO staff (matrixed to EPO division) for web presence and other ALMA related EPO Move five staff at Office of Chilean Affairs from construction to Ops First ALMA ops postdoc North American ALMA Science Center Staffing

8 8 Respond to NSF and international review panel comments ANASAC – formalize charge-response format. First major charge was key NAASC plan review. Canadian participation in NA ALMA ops: first face to face in Tucson Aug 06. Monthly organizational meetings. Supported CASA S/W development (alpha testing/release) Participated in extensive S/W testing: OST, pipeline, off-line. Develop calibrator & spectral line databases http://www.splatalogue.net AAS summer 2006 ALMA special session. Second NAASC Workshop June 2007: ‘Through disks to stars and planets’ //www.cv.nrao.edu/naasc/disk07//www.cv.nrao.edu/naasc/disk07 Series of ALMA science lectures in 2007 Other NAASC Activities Aug 2006 -- 2007

9 9 Implement plan with first hires in CSV, EPO CASA major milestone -- beta release, Fall 2007 S/W testing: continuing (OST, pipeline, off-line) Participate in testing/training at ATF Participate in NRAO summer school Working visits to other Science centers: compare and coordinate New MOU with Canada for operations Third Science Workshop Summer 2008 ANASAC -- main charge will concern User grants NAASC activities Aug 2007 -- Aug 2008

10 10 ALMA Global Operations 2006-2007 Key JAO operations staff hires  Head Science Operations - Lars-Ake Nyman  Head of Admin - Russell Smeback  EPO officer at JAO - TBA  Head of Technical Services - TBA  Human Resources Manager - Joanna Mackenzie  Recruitment Officer - Pamela Rivera  Warehouse Supervisor - Hector Ceballos  Array operators (2), Admin ass’t Key activities:  Develop ALMA Operations Plan & present for review  Assume budget and staffing spreadsheet.  Define recruitment and hiring procedures for Chilean operations staff  Develop international EPO plan

11 11 ALMA Global Operations 2007-2008 Key JAO operations staff hires 2007-2008  84 Operations staff  +4 DSO (safety)  +15 ADM (warehouse management & facility maintenance)  +12 DSO (9 astronomers, including 5 transfer from AIV)  +41 DTS (Engineering leads, 1st contingent of Electronics & Antenna groups) Key activities for 2008:  Finalize and adopt Version C of AOP -- incorporate some full service functions (advanced user support)  Take over logistics and warehouse support of OSF  Responsible for general maintenance activities & safety  Operate telescopes for AIV/CSV  Maintain correlator  Support AIV/CSV at OSF  Prepare for start of 1-baseline interferometry at OSF

12 12 ALMA Global Operations Some User-related ALMA Project Milestones (taken from IPS April07)  Q1 2009 start of commissioning and science verification at AOS  Q2 2010 early science proposal submission  Q4 2010 start of early science operations  Q3 2012 start full science operations

13 13 ALMA User grants initiatives “Future of Radio Astronomy Committee,” McCray/AUI, Letter to NSF Bally and colleagues open letter to AAS president ANASAC report to NRAO (other?) Users committee report to NRAO AURA initiative?

14 14

15 15 Yellow: LSM duty station=OSF Light green: ISM, Duty station=OSF Mustard: LSM Duty station=SCO or both Position - Milestone+offset/startyear.quarter Darker Green: ISM Duty station=SCO or both Solid=Staff hiredotted=contract staff Key ISM LSM SCO OSF Accountant 1 - OSF-3/2007.4 Accountant 2 - OSF-3/2007.4 Accountant 3 - OSF-3/2007.4 Procurement 1 - OSF-3/2007.4 Procurement 2 - OSF-3/2007.4 Procurement 3 - OSF-3/2007.4 Executive Based Staff (EXE) General Services (GS) Admin Asst - OPS+23/2007.4 Head of Administration Ops+11/2006.4 GS Manager - OSF-3/2007.4 Travel Agent 1 - OSF-3/2007.4 Travel Agent 2 - OSF-3/2007.4 Warehouse Staff (3) 1-3 - Ware+0/2007.3 (2) 4-5 - Ware+12/2008.3 Facilities Group (FG) Buyer 1 - OSF+6/2008.3 Buyer 2 - OSF+6/2008.3 Buyer 3 - OSF+6/2008.3 Budget Controller - OSF-3/2007.4 Logistics Officer - Ops+24/2008.1 Warehouse Super - Ware-3/2007.2 Facilities Managr1 - OSF-3/2007.4 Facilities Managr2 - OSF-3/2007.4 Facility Operators (5) 1-5 - OSF+0/2008.1 Civil Works (3) 1-3 - OSF+0/2008.1 Security Officers (4) 1-4 - OSF+0/2008.1 Off-site Driver OSF +0/2008.1 Catering & Cleaning (20) 1-20 - OSF+0/2008.1 Grounds Keepers (2) 1-2 - OSF+0/2008.1 Auto Mechanics (2) 1-2 - OSF+0/2008.1 OSF/AOS Transfer Drivers (3) 1-3 - OSF+0/2008.1 ALMA Operations: Administration Division (ADM): 2008.4

16 16 ALMA Operations: Division of Science Operations (DSO): 2008.4 2008 Milestones: Apr-07 Ant 1 AIV Receive at OSF Jun-08 Ant 1&2 OSF Interferometer Start Aug-08 Ant 1 AOS Checkout Array Operator1 - 2006+3/2007.1 Array Operator2 - 2006+6/2007.2 AOG Manager1 - OSF+0/2008.1 Array Operator3 - Ant1-A/2008.3 Array Operator4 - Ant1-A/2008.3 Array Operator5 - Ant1-A/2008.3 Antenna Operations Group (AOG) Program and Data Management Group (PDG) Admin Asst1 - OSF+0/2008.1 Admin Asst2 - OSF+0/2008.1 Head of Science Operations 2006+0/2006.4 Sci. Prog. Manager-AIVx-3/2008.1 System Astr1 - 2bl+0/2008.2 System Astr2 - 2bl+0/2008.2 System Astr3 - 2bl+0/2008.2 System Astr4 - 2bl+6/2008.4 PDM Astr1 - 2bl-3/2008.1 PDM Astr2 - AIVx+0/2008.2 PDM Astr3 - AIVx+0/2008.2 PDM Astr4 - AIVx+0/2008.2


Download ppt "ALMA North American Science Advisory Committee Meeting August 17, 2007, Charlottesville, VA Overview: North American ALMA Science Center Chris Carilli."

Similar presentations


Ads by Google