Presentation is loading. Please wait.

Presentation is loading. Please wait.

VOTech Stage 1 Meeting, DS4 User Tools, Univ. Leicester, 22-Feb-2005 VOTech DS4 Welcome to: DS4 * User Tools WP Manager Markus Dolensky, ESO * DS... Design.

Similar presentations


Presentation on theme: "VOTech Stage 1 Meeting, DS4 User Tools, Univ. Leicester, 22-Feb-2005 VOTech DS4 Welcome to: DS4 * User Tools WP Manager Markus Dolensky, ESO * DS... Design."— Presentation transcript:

1 VOTech Stage 1 Meeting, DS4 User Tools, Univ. Leicester, 22-Feb-2005 VOTech DS4 Welcome to: DS4 * User Tools WP Manager Markus Dolensky, ESO * DS... Design Study

2 VOTech Stage 1 Meeting, DS4 User Tools, Univ. Leicester, 22-Feb-2005 VOTech DS4 Agenda Morning Session 10:30 - 12:30: Short Range Planning Overview (Dolensky) CDS Proposal (Boch) Planning Iteration #1 Afternoon Session 13:30 - 15:30: Iterations 2 - 6 Science Drivers (Walton) Tools (Dolensky) General Discussion Wrap Up/Summary

3 VOTech Stage 1 Meeting, DS4 User Tools, Univ. Leicester, 22-Feb-2005 VOTech DS4 DCA DS4 User Tools DS6 Data Mining DS5 Resource Discovery DS3 Infrastructure EURO-VO Telescope Assembly Pointing FC

4 VOTech Stage 1 Meeting, DS4 User Tools, Univ. Leicester, 22-Feb-2005 VOTech DS4 Short Range Planning Iteration 1 27 June – 1 July 2005 ESO Headquarters, Munich, Germany http://euro-vo.org/workshop2005 Registration Deadline: March 1 st Workshop on VO Standards and Systems for Data Centres and Large Projects Sponsored by ESO, OPTICON, RADIONET and EURO-VO partners

5 VOTech Stage 1 Meeting, DS4 User Tools, Univ. Leicester, 22-Feb-2005 VOTech DS4 Tool Layer I

6 VOTech Stage 1 Meeting, DS4 User Tools, Univ. Leicester, 22-Feb-2005 VOTech DS4 Tool Layer II

7 VOTech Stage 1 Meeting, DS4 User Tools, Univ. Leicester, 22-Feb-2005 VOTech DS4 Scope This task will produce designs and prototypes for new VO-compliant end-user tools. We will produce a list of suggested priority tools. This will partially be based on the experience and feedback of precursor projects and will be based on input from the scientific user community. Work will be conducted in close collaboration with data providers, e.g., members of the Data Centre Alliance, current and future missions, simulations as well as tool builders. A goal is to help existing facilities with technology take-up and to have a lasting impact on Astronomy data centres and their user community by exploring new designs and deriving generalized IVOA standards.

8 VOTech Stage 1 Meeting, DS4 User Tools, Univ. Leicester, 22-Feb-2005 VOTech DS4 Team Communication mailing list: requires registration: http://forum.eurovotech.org/profile.php?mode=register collaborative page: http://wiki.eurovotech.org/bin/view/VOTech/UserTools dial-in telecons: Markus can arrange (Skype?) ‚cheap‘ videocons? contact for follow-up (from within DS group) ESO: Markus Dolensky Astrogrid:Keith Noddle CDS:Thomas Boch INAF:Riccardo Smareglia ESA:Pedro Osuna Starlink:Malcolm Currie

9 VOTech Stage 1 Meeting, DS4 User Tools, Univ. Leicester, 22-Feb-2005 VOTech DS4 page intentionally left blank

10 VOTech Stage 1 Meeting, DS4 User Tools, Univ. Leicester, 22-Feb-2005 VOTech DS4 Enabling Convincing Workshop Tutorial H/W & S/W setup public demo server (ESO, others?): Astrogrid portal, MySpace, experimental registry,... improving usability of AG portal for end users and DCs: security review ivo:// address exchange layer (MySpace, etc.) multiple filestore support MIME-type association use cases for browsing survey & archival data: preparing test sets of survey data for sample services support of graphic previews (.jpg,.png) footprint overplotting capability

11 VOTech Stage 1 Meeting, DS4 User Tools, Univ. Leicester, 22-Feb-2005 VOTech DS4 page intentionally left blank

12 VOTech Stage 1 Meeting, DS4 User Tools, Univ. Leicester, 22-Feb-2005 VOTech DS4 A Preliminary Analysis of Input to AVO SRM by M. Dolensky Feedback requested from DS4 partners. SRM... Science Reference Mission

13 VOTech Stage 1 Meeting, DS4 User Tools, Univ. Leicester, 22-Feb-2005 VOTech DS4 Tools Science Applications: T1 multi-waveband image tool T2 best fitting T3 SED builder from archival data T4 positional cross matcher T5 access to theoretical data T6 robotic telescope interface T7 generic source extraction Other Tools: T8 VO Portal (GUI) T9 workflow builder & monitor

14 VOTech Stage 1 Meeting, DS4 User Tools, Univ. Leicester, 22-Feb-2005 VOTech DS4 Tools vs. Scenarios I This is a preliminary analysis; feedback requested from DS4 partners.

15 VOTech Stage 1 Meeting, DS4 User Tools, Univ. Leicester, 22-Feb-2005 VOTech DS4 Tools vs. Scenarios II A question mark ‚?‘ denotes a gap between scenarios and envisaged tools. Implementations may already exist. This is a preliminary analysis; feedback requested from DS4 partners.

16 VOTech Stage 1 Meeting, DS4 User Tools, Univ. Leicester, 22-Feb-2005 VOTech DS4 A question mark ‚?‘ denotes a gap between scenarios and envisaged tools. Implementations may already exist. This is a preliminary analysis; feedback requested from DS4 partners. Tools vs. Scenarios III

17 VOTech Stage 1 Meeting, DS4 User Tools, Univ. Leicester, 22-Feb-2005 VOTech DS4 Food for Discussion: Derived Focus Iterations 2-6 Note taken during the presentation: The group concluded to initially focus on T4 ‚cross matcher‘. Work on an iteraion‘s focus area does not prevent work in any other area. Above list is ‚a‘ possibility; feedback requested from DS4 partners.

18 VOTech Stage 1 Meeting, DS4 User Tools, Univ. Leicester, 22-Feb-2005 VOTech DS4 page intentionally left blank

19 VOTech Stage 1 Meeting, DS4 User Tools, Univ. Leicester, 22-Feb-2005 VOTech DS4 Slides from Kickoff Meeting Revisited

20 VOTech Stage 1 Meeting, DS4 User Tools, Univ. Leicester, 22-Feb-2005 VOTech DS4 Institution FTE Astrogrid1 CNRS2 ESO2 INAF1 Human Resources VOTech staff has not been hired yet by any of the partners.

21 VOTech Stage 1 Meeting, DS4 User Tools, Univ. Leicester, 22-Feb-2005 VOTech DS4 DS4 Context DS3 Infrastructure DS5 Resource Disc. DS6 Data Explor. EURO-VO DCA, FC VOTech Mgmt DS1, DS2 IVOA VOTech DS4

22 VOTech Stage 1 Meeting, DS4 User Tools, Univ. Leicester, 22-Feb-2005 VOTech DS4 Timeline (subject to change) WP Plan 2/057/053/067/0612/059/0612/07 Sci. Funct. Framewk.DS3 Infrastr. Study Rpt.User Tool Prelim. Study Rpt.User Tool Study ReportDS5 Resource Discovery Study Rpt.DS6 Data Explor. Study Rpt. VOTech DS4 2/057/053/067/0612/059/0612/07

23 VOTech Stage 1 Meeting, DS4 User Tools, Univ. Leicester, 22-Feb-2005 VOTech DS4 DS4 Collaborative Page http://wiki.eurovotech.org/bin/view/VOTech/UserTools


Download ppt "VOTech Stage 1 Meeting, DS4 User Tools, Univ. Leicester, 22-Feb-2005 VOTech DS4 Welcome to: DS4 * User Tools WP Manager Markus Dolensky, ESO * DS... Design."

Similar presentations


Ads by Google