Published byMatilda Todd Modified over 9 years ago
2
The Evolution of the TERRA Crystal Galleries Mineral Showroom
3
A work in progress lasting 7 long years….
4
- 1995 to 1998 - Uncapped rock is left in ½ of the basement pending future development ideas …..
5
- 1999 - Excavation begins!
6
- 1999 to 2004 - Slow progress is made….
7
As the rock is whittled and hauled away, bit by bit ….
8
By bit ….
9
- June 2005 - And is turned into walls and used as fill around the property…
10
- June 2005 - The excavation is complete, the footings poured and the floor is prepared for concrete….
13
- -October 2005 – Jim wires and puts up gyproc …. Gyproc dust!
14
- - November 2005 - The gyproc is completed and the room is painted ….
15
- November 2005 - The furniture is built and painted before the floor is painted and the carpet installed ….
16
- December 2005 - The carpet is installed and so is the lighting ….
19
- December 2005 - Rocks are unpacked and reviewed ….
20
- December 2005 - Furniture is assembled ….
22
- December 2005 - The room starts to come together ….
33
The end (finally!) We hope that you enjoyed your virtual visit to TERRA Crystal Galleries ….