Presentation is loading. Please wait.

Presentation is loading. Please wait.

National Contact Points October 23rd FP6 is not business as usual! R F de Bruïne Director INFSO-F.

Similar presentations


Presentation on theme: "National Contact Points October 23rd FP6 is not business as usual! R F de Bruïne Director INFSO-F."— Presentation transcript:

1 National Contact Points October 23rd FP6 is not business as usual! R F de Bruïne Director INFSO-F

2 NCP 23rd October 2002 Introduction For NCPs the clear priority is now to prepare the constituency Preparing the constituency is a real challenge as IST in FP6 is profoundly different from IST in 5th:- -in terms of ambition -focus -and implementation mechanisms (3 out of 6 instruments) Happily there is continuity as well -People (familiar faces on our side and yours) -Well established constituencies (at least in some areas) -Some implementation mechanisms Awareness is increasing but maximum effort needs to be made on all sides before the first call

3 NCP 23rd October 2002 IST in FP6: Workprogramme 2003/4 Much more detail will be given during the day but remember above all:- 2 Year Workprogramme -Focused on a limited set of Strategic Objectives -Further focused on work that must be done at European level -Better leveraging of MS and private efforts Strategic Objectives selected so as to -Reinforce European Strengths -Exploit new opportunities -Ensure co-evolution of technologies and applications

4 NCP 23rd October 2002 IST in FP6: Workprogramme 2003/4 Remember Also: -In the framework of ERA -Future Generation of Technologies leading to Ambient Intelligence -23 Strategic Objectices vs. 60+ Action Lines in FP6 -6 Instruments (3 new) vs. 12 in FP6 Focus of the days work

5 NCP 23rd October 2002 Budget allocation 80% of budget pre-allocated 20 % flexible, to be allocated after evaluation Five groups of objectives -Strengthening leadership Marked increase (~27%) -Seizing opportunitiesSubstantial increase (~45%) -Applied ResearchSame level -InfrastructuresFollowing decision -FETFollowing commitment Allocation only for the first two years: To be revised for 2005- 2006 ~2/3 of budget on new instruments (all together not per objective)

6 NCP 23rd October 2002 Good Luck Make the best use of the day Ask questions freely Dont leave confused


Download ppt "National Contact Points October 23rd FP6 is not business as usual! R F de Bruïne Director INFSO-F."

Similar presentations


Ads by Google