Presentation is loading. Please wait.

Presentation is loading. Please wait.

GSMP Local Community Network Enhanced Process Physical Meeting, San Diego Oct. 2007.

Similar presentations


Presentation on theme: "GSMP Local Community Network Enhanced Process Physical Meeting, San Diego Oct. 2007."— Presentation transcript:

1 GSMP Local Community Network Enhanced Process Physical Meeting, San Diego Oct. 2007

2 ©2005 GS1 2 The Global Collaborative Forum AGENDA

3 ©2005 GS1 3 The Global Collaborative Forum Enhance LCN Process Welcome to the San Diego GSMP Event Enhance the GSMP Local Community Network Process Physical Meeting! Our agenda: Administrative items GSMP Local Community Network Time Table Feedback Participation Communication Plan Latest Item – Engaging Asian MOs

4 ©2005 GS1 4 The Global Collaborative Forum ADMINISTRATIVE

5 ©2005 GS1 5 The Global Collaborative Forum Administrative Use Community Room MO folders a continuing practice Process Group PCN and addendum posted Action / Discussion Items Spreadsheet posted Melanie is LCN GSMP Staff contact person Fixed dates / floating times for meetings now in place New Name in Use To do – revise manual, etc.

6 ©2005 GS1 6 The Global Collaborative Forum GSMP LCN TIME TABLE

7 ©2005 GS1 7 The Global Collaborative Forum GSMP LCN Time Table Synchronized (Core / LCN) time table reviewed at last LCN Enhanced Process call Group Discussion Is LCN prepared to move to the synchronized time table? When?

8 ©2005 GS1 8 The Global Collaborative Forum Measuring Value Group Discussion How do we propose to measure value? Survey question example: This CR is relevant to me (yes, no) This CR provides (high, medium, low) value to my company Action: Implement in Zoomerang, When?

9 ©2005 GS1 9 The Global Collaborative Forum FEEDBACK PARTICIPATION

10 ©2005 GS1 10 The Global Collaborative Forum Current feedback participation results Group Discussion How do will we increase LCN member feedback participation on the GA / Survey?

11 ©2005 GS1 11 The Global Collaborative Forum COMMUNICATION PLAN

12 ©2005 GS1 12 The Global Collaborative Forum LATEST ITEM – ENGAGING ASIAN MOS

13 ©2005 GS1 13 The Global Collaborative Forum Thank-you


Download ppt "GSMP Local Community Network Enhanced Process Physical Meeting, San Diego Oct. 2007."

Similar presentations


Ads by Google