Plumbing Prints Unit 15
2
Unit 15 Plumbing Prints Identify various piping systems
page 159 Learning Objectives Identify various piping systems Recognize plumbing fixtures symbols on prints Explain the three stages of plumbing installation Read piping diagrams
3
Specifications Staging
Unit 15 page 159 Specifications Staging Stage 1 provisions for water outlet & for service entrance of water supply & sewer drain to the building are made prior to the pouring of the foundation. Stage 2 rough-in plumbing work done prior to slab-on-grade and wall coverings
4
Specifications Staging
Unit 15 page 159 Specifications Staging Stage 3 finish plumbing - setting of fixtures after walls and floors are finished
5
shown on architectural floor plan
Plumbing Information Unit 15 page 160 Figure shown on architectural floor plan
6
Water Distribution System
Unit 15 page 159 Water Distribution System main supply line form water meter distributes to water outlets water heater sinks water closets hose bibs etc. includes control valves
7
Plumbing Symbols Unit 15 page 161 Figure
8
Distribution Piping Materials
Unit 15 page 160 Distribution Piping Materials copper - most common for water distribution comes in - heavy, medium, & light hard or soft do not embed in concrete
9
Sleeves Allow for movement in copper pipe Unit 15 page 160
Use a sleeve to protect pipe going thru wall Allow for movement in copper pipe
10
Distribution Piping Materials
Unit 15 page 160 Distribution Piping Materials copper should never come in contact with other metals joints sweated threaded
11
Distribution Piping Materials
Unit 15 page 162 Distribution Piping Materials galvanized steel pipe great strength dimensionally stable protected inside & out three grades S - standard XS - extra strong XXS - double extra strong
12
Distribution Piping Materials
Unit 15 page 162 brass pipe used for highly corrosive water plastic pipe ABS - acrylonitrile butadiene styrene PVC - polyvinyl chloride polybutylene threaded or solvent welded joints rated according to wall thickness can distribute hot water
13
Unit 15 page 163 Figure Plumbing Isometric
14
Plumbing Rough-in Unit 15 page 160
15
Plumbing Rough-in
16
Sewage Disposal System
includes vertical soil stacks a vent a trap cleanouts
17
Plumbing Codes Uniform Plumbing Code Local Government Codes
Specify leak testing
18
Test Your Knowledge take 10 minutes to complete the test on page 165
Unit 15 Test Your Knowledge take 10 minutes to complete the test on page 165
19
Residential Plumbing Prints
Unit 15 Residential Plumbing Prints Take 10 minutes & complete the questions for Activity 15-1 on page 166 refer to large prints 15-1
20
Office Building Plumbing Prints
Unit 15 Office Building Plumbing Prints Take 15 minutes & complete the questions for Activity 15-2 on page 167 refer to large prints 15-2a & 15-2b END OF UNIT 15