Presentation is loading. Please wait.

Presentation is loading. Please wait.

Meeting Planning Timeline: Making A Plan, Planning for Success Society of Government Meeting Professionals A Gilmer Institute of Learning Presentation.

Similar presentations


Presentation on theme: "Meeting Planning Timeline: Making A Plan, Planning for Success Society of Government Meeting Professionals A Gilmer Institute of Learning Presentation."— Presentation transcript:

1 Meeting Planning Timeline: Making A Plan, Planning for Success Society of Government Meeting Professionals A Gilmer Institute of Learning Presentation www.sgmp.org Idea for Meeting Meeting Success

2 Steps in the Timeline 1. Six to 12 months out 2. Four to six months out 3. Three months out 4. Two months out 5. One month out 6. One week out 7. Post conference www.sgmp.org

3  Determine who will attend  Select several possible meeting dates and sites  Contact hotel/conference centers and visit relevant Web sites  Submit your RFP through SGMP’s RFP Connection www.sgmp.org Six to 12 Months Out: Once You Decide to Have the Meeting

4  Visit potential sites and consider: Distance from airport Shuttle service and parking options Accessible parking  Select potential sites, obtain referrals  Select a destination and facility www.sgmp.org Six to 12 Months Out: Once You Decide to Have the Meeting

5  Inform potential attendees of date and location E-mail Registration documents  Refine the program/agenda  Confirm speakers Send letter of confirmation with agenda Guidelines for preparing presentations Obtain presenter bio sketches www.sgmp.org Four to Six Months Out

6  Know your approximate numbers for food and beverage  Be sure to include ADA requirements  Look for cost savings measures  Include AV needs  Identify taxes and service charges  Review cancellation and attrition clauses  Confirm meeting and sleeping room rate  Sign contract www.sgmp.org Four to Six Months Out: Hotel Negotiations

7  Arrange local transportation needs Shuttles from the airport and train stations VIP transportation Transportation to special events  Guests needing special assistance Interpreters Accessible rooms Transportation www.sgmp.org Three Months Out

8  Determine meeting room set up Design seating for comfort and engagement Watch maximum capacity  Order signage Welcome banners Podiums signs Directional signs Message boards  Communicate with attendees Hotel confirmation Transportation to venues www.sgmp.org Two Months Out

9  Send rooming list to hotel  Finalize speaker travel  Determine staff roles at event  Order name badges and promotional materials based on amount needed  Finalize AV needs  Finalize menus based on what is in season  Communicate special dietary needs to chef www.sgmp.org One Month Out

10  Prepare conference bags and handouts  Meet with internal and external meeting staff  Run through AV requirements for special and/or large events with technical staff  Confirm signature authority  Review emergency preparedness plans www.sgmp.org One Week Out

11  Post-con with venue  Detailed review of billing statements  Collect evaluations  Evaluate challenges with internal staff  Celebrate successes! www.sgmp.org Post Conference Questions and Answers

12 www.sgmp.org Thank you for participating in today’s workshop. You have earned one educational contact hour. Original content for this presentation developed by Charles Sadler, CGMP, CHSP, CHSC. Edited by Lisa Silverman, MA, CGMP. November 2011


Download ppt "Meeting Planning Timeline: Making A Plan, Planning for Success Society of Government Meeting Professionals A Gilmer Institute of Learning Presentation."

Similar presentations


Ads by Google