Presentation is loading. Please wait.

Presentation is loading. Please wait.

Www.bmci.by THE ECOLOGICAL MONITORING CENTER. 2 JSC “Belgorkhimprom” Activity.

Similar presentations


Presentation on theme: "Www.bmci.by THE ECOLOGICAL MONITORING CENTER. 2 JSC “Belgorkhimprom” Activity."— Presentation transcript:

1 www.bmci.by THE ECOLOGICAL MONITORING CENTER

2 2 JSC “Belgorkhimprom” Activity

3 3 EMC Work Direction

4 4 Partners in the Republic of Belarus

5 5 PRL of Project “PA “Belaruskali” GAS SUPPLY OF THE 2 nd ORE DEPARTMENT OF RUE «PA «Belaruskali» Project proponent : Carbon finance share – from 8,6% to 11,5% from the project cost Greenhouse gases emission reduction – 20 353 t СО 2 /year Greenhouse gases emission reduction in a period from 2009 to 2012 – 81 412 t СО 2 Project realization costs - 7 088,2 thousand €

6 6 PRL of Project “PA “Belaruskali” GAS SUPPLY OF THE 3 nd ORE DEPARTMENT OF RUE«PA “BELARUSKALI” GAS SUPPLY OF THE 3 nd ORE DEPARTMENT OF RUE «PA “BELARUSKALI” Project proponent: Carbon finance share – From 4,8% to 6,4% from project cost Greenhouse gases emission reduction – 19 879 t СО 2 /year Greenhouse gases emission reduction in a period from 2009 to 2012 – 60 000 t СО 2 Project realization costs - 9 339 thousand €

7 7 PRL of Project “PA “Belaruskalii” CO-GENERATIONAL ENERGYGENERATING INSTALLATION CONSTRUCTION WITH RECOVERY BOILERS ON THE TERMAL POWER PLANT OF THE 1 st ORE DEPARTMENT Greenhouse gases emission reduction in 2012– 38 219 t СО 2 /year Project realization costs - 12 120 thousand € Carbon finance share – from 2,4% to 3,2% from the project cost Project proponent : Own electricity production increase in more than 2 times. Actual annual fuel economy on replacement of electrical power system - 19 923 000 n. m 3 gas. Reduce of contaminant emissions to the atmosphere in quantity of 79,841 t/year.

8 8 JSC “Grodno Khimvolokno” project IMPLEMENTATION OF 4,5-6 MW DEFINED CAPACITY WIND-DRIVEN POWER PLANT In the result of wind-driven power plant implementation producing of electric energy without СО 2 In the result of wind-driven power plant implementation producing of electric energy without СО 2 is assumed Annual income from generated ERU sale – from 22 050 € to 29 400 € Greenhouse gases emission reduction– 2 940 t СО 2 /year Greenhouse gases emission reduction in a period from 2009 to 2012 – 5 880 t СО 2 Project realization costs - 6 750-9 000 thousand €

9 9 JSC “Grodno Khimvolokno” project ENERGY COMPLEX RECONSTRUCTIONUSING POWER EFFICIENT ENERGY COMPLEX RECONSTRUCTION USING POWER EFFICIENTTECHNOLOGY Greenhouse gases emission reduction– 57 384 t СО 2 /year Greenhouse gases emission reduction in a period from 2009 to 2012 – 229 536 t СО 2 Project realization costs - 15 000-16 000 thousand € Carbon finance share (a year) – from 2,7% to 3,6% from the project cost

10 10 Facility “Polimir” JSC “Naftan” project CONSTRUCTION 0F9 MW ENERGOTECHNOLOGICAL COGENERATION UNIT WORKING ON THERMAL WASTE ENERGY CONSTRUCTION 0F 9 MW ENERGOTECHNOLOGICAL COGENERATION UNIT WORKING ON THERMAL WASTE ENERGY Annual income from generated ERU sale – from 116 557,5 € to 155 410 € Greenhouse gases emission reduction – 15 541 t СО 2 /year Greenhouse gases emission reduction in a period from 2009 to 2012 – 46 623 t СО 2 Project realization costs - 11 322 thousand € Gas-pumping unit (GPU) utilization involves usage of 757 m 3 /h of natural gas. Fuel gas (mixture of МВФ 93.7% and natural gas – 6,3%) usage will remain at the same level as before project realization.

11 11 JSC “Belshina” project ENERGY LARGE-SIZE TYRE PLANT COMPLEX RECONSTRACTION BASED ON CO-GENERATIONENERGOTECHNOLOGICAL INSTALATIONS BASED ON CO-GENERATION ENERGOTECHNOLOGICAL INSTALATIONS Greenhouse gases emission reduction – 27 761 t СО 2 /year Greenhouse gases emission reduction in a period from 2009 to 2012 – 55 522 t СО 2 Project realization costs - 5 493 thousand € Annual income from generated ERU sale – from 208 207,5 € to 277 610 €

12 12 JSC “Polotsk-Svetlovolokno” project GLASS-WORKED ARC №4 MODERNIZATION Greenhouse gases emission reduction – 5 619 t СО 2 /year Greenhouse gases emission reduction in a period from 2009 to 2012 – 11 238 t СО 2 Project realization costs - 1 916 thousand € (costs of 2006 ) Carbon finance share (in a year) – from 2,2% to 2,9% from project cost Implementation of electric heating additional system on existing direct-fire kiln for increasing arc efficiency.

13 13 JSC “Grodno Azot” project 16 MW (2x8 MW) GAS TURBINE POWER PLANT CONSTRUCTION. SECOND PHASE Greenhouse gases emission reduction – 10 915 t СО 2 /year Greenhouse gases emission reduction in a period from 2010 to 2012 – 32 745 t СО 2 Project realization costs - 24 800 thousand € Annual income from generated ERU sale from 81 862 € to 109 150 €

14 14 JSC “Grodno Azot” project As the result of project secondary decomposition catalyst installation in nitric acid production reactor at enterprise would be installed. NITROUS OXIDE GENERATION SUPPRESSION (N 2 O) Greenhouse gases emission reduction – 2009: 238 253 tons СО2 2010: 235 745 tons СО2 2011: 233 237 tons СО2 2012: 230 733 tons СО2 Greenhouse gases emission reduction in a period to 2012 – 937 968 t СО 2 Project realization costs - 2 500 thousand € (costs of 2006 ) Annual income from generated ERU sale from 1,8 million € to 3,05 million €

15 15 СО 2 emission reduction on the projects of 2007-2008

16 16 СО 2 emission reduction on the projects of 2007-2008

17 17 СО 2 emission reduction on the projects of 2009

18 18 СО 2 emission reduction on the projects of 2009

19 19 Our offers  Adoption and implementation of new power-efficient ecological technologies in realizable projects.  Application of the latest process plants of the institute in mining and chemical field in the projects implemented by our partners.  Application of the latest technologies of wind, solar energy, biogas and biomass usage in different projects.  Joint research activities aimed at the creation of new technologies in the field of power engineering and energy efficiency.  Joint implementation of projects within the framework of Kyoto protocol and the mechanism of voluntary greenhouse gas emission reduction.  Energy inspection and audit.  Protection of patent rights on the technologies and their usage.  Joint participation in European ecological programmes.

20 20 Contact information JSC “Belgorkhimprom” The Ecological Monitoring Center 220029 Masherov avenue, 17 Telephone: (8017) 334-69-92 Fax: (8017) 334-70-25 E-mail: bmci@bmci.bybmci@bmci.by Site: www.bmci.bywww.bmci.by Telephone: (8017) 334-79-88 E-mail: lgm@belgorhimprom.bylgm@belgorhimprom.by