Innovation & Training for the bio-based economy
Biopark Terneuzen Connected Energy Bio Base Europe Innovation & Training for the bio-based economy
2
Ports of Vlissingen and Terneuzen
Diepgang 12,50 meter Oppervlakte circa 2100 ha Vlissingen Draft 16,5 m 2.400 ha Terneuzen Draft 12,5 m 2.100 ha Terneuzen Max. draft meters Port area +/ ha
3
Sloewarmte BV Green Deal
MARTENS ZEELAND REFINARY Heerema COVRA
4
Results and numbers Demand of energy Martens GJ/j upto GJ/j in 2021 Demand of energy Covra GJ/j Available energy KW/uur (gross) Price of energy linked to the gasprice with annual indexation Supply and demand guarantees to justify investments results: CO2 emission (approx 4000 ton per year) Reduction of fossil fuels (natural gas) CO2 credits (Carbon Credits) / emission rights Lower energy costs for users Reasonable return on investment Return used for future investments additional smart links Marketing / sustainable image Bind existing companies for the future
5
Sustainable clusters in practice
Bio Base Europe Innovation & Training for the bio-based economy
6
Clustering in the canalzone
Biopark / use of residues & by products Valuepark / Dow Chemicals Greenhouse complex / Warmco2 Bio Base Europe / Ghent Bio-Energy Valley Ghellinckpolder / Cargill - Nedalco
8
2nd Green Deal Biodiesel Plant Biomass powerplant Biogas powerplant
heath Biogas powerplant Green waste
9
Glycerine Heath NOBLE PLANET ENERGY
10
chemical cluster zevenaarhaven
194 dc steam
11
Greenhouse complex Terneuzen
Part of Biopark Terneuzen Most sustainable greenhouse project: smartlink with Yara 300 ha greenhouses Education, promotion and knowledge center
12
Practice Smart use of heath, CO2, water and bio- mass
Warmte CO2 Water Bio-massa-stromen Smart use of heath, CO2, water and bio- mass Independent from existing utilities Use of existing infrastructure New infrastructure for heath and CO2
13
Concept | Vertrouwelijk
Zeeland Seaports Yara VolkerWessels
14
Sustainable greenhouses
Heath 90% saving on fossil fuels Less CO2 and NOx 30-35 points GLK CO2 Pure CO2 needed for growers 15 points GLK
15
Autrichehaven BIOGAS PRODUCTION Length: 855 m Width:140 m
Production and storage of Biofuels BIOGAS PRODUCTION BAVIWE ABEN Biogas Length: 855 m Width:140 m Draft: 12.5 m
16
Pipeline connections Multi utility provider