Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 CSC operation news M. Ignatenko UCLA group meeting CERN February 18, 2014.

Similar presentations


Presentation on theme: "1 CSC operation news M. Ignatenko UCLA group meeting CERN February 18, 2014."— Presentation transcript:

1 1 CSC operation news M. Ignatenko UCLA group meeting CERN February 18, 2014

2 2 HV, LV and skew clear cables for ME-42 chambers installed RPC gas tubes prevented us from finishing cable installation The last VME-4/4 crate cabled with skew clear cables

3 3 ME+11 problems 1.ME+1/1/08 – swapped skew clear cables (fixed) 2.ME+1/1/20 - swapped PPIB cables (fixed) 3.ME+1/1/35 - LV terminal block problem (fixed) 4.ME+1/1/26 – bad skew clear cables (replaced) 5.ME+1/1/04 – missing 5.5 V for DCFEB 5 (not confirm on the surface). 1.ME+1/1/22 – no ALCTtx/rx working area 2.ME+1/1/33 – no ALCTtx/rx working area, no data from DCFEB7 (some ALCT problems seen on the surface, but DCFEB7 problem has not been confirm)

4 4 Near operation tasks 1.Time in the readout of ME+42 chambers with 1000219 PC config. 2.Take a long CR run (or a few runs) with 4 stations of +Z endcap (without ME+11). 3.Repeat test of all installed ME+11. 4.Start ME+11 LTT (6 chambers). 5.New MPC test (CR local runs). 6.As soon as LV and HV are ready on –Z endcap start operating station -2 and -3 (include these station in the local runs).

5 5 2014 DOC volunteers 1.Amithabh Shrinivas UC Riverside experienced shifters 2.Pieter Everaerts UCLA 3.Senka Duric UW 4.Jesse Heilman UC Riverside 5.Indara Suarez TAMU 6.Jessica Brinson OSU 7.Kennedy Elizabeth UC Riverside 8.Devin Taylor UW 9.David Morse NU 10. Xiaofeng Yang UCLA 11. Jay Hauser UCLA 12. Eric Takasugi UCLA (yes before August, ? after)

6 6


Download ppt "1 CSC operation news M. Ignatenko UCLA group meeting CERN February 18, 2014."

Similar presentations


Ads by Google