 Engineers are regularly engaged in projects in their careers!  Middle management continues to shrink  Industry now organizes more around projects.

Similar presentations


Presentation on theme: " Engineers are regularly engaged in projects in their careers!  Middle management continues to shrink  Industry now organizes more around projects."— Presentation transcript:

1

2  Engineers are regularly engaged in projects in their careers!  Middle management continues to shrink  Industry now organizes more around projects than functions. 2

3  Engineers have led the way on project management, it is now “hot and trendy”.  #1 Area of Continuing Education reported by Penn State Behrend ECE alumni.  Penn State Behrend School of Engineering Survey 2003 of Fortune 500 companies- #1 required skill for new engineers = PROJECT MANAGEMENT SKILLS 3

4 To complete the project ◦ On-time ◦ Within budget ◦ So that it meets the requirements 4

5 By the end of this chapter, you should  Be able to create a work breakdown structure.  Be able to create network diagrams and Gantt charts.  Be able to determine the critical path for completing a project and the float time for each activity in the plan.  Be able to conduct break-even analysis and understand some basic methods of cost estimation.  APPLY THIS TO YOUR PROJECT – YOU MUST LEARN BY DOING! 5

6 Work Breakdown Structure (WBS) Activity 6

7 Tasks Deliverables 7

8 From MIL-HDBK 881  A product-oriented family tree composed of hardware, software, services, data, and facilities. The family tree results from systems engineering efforts.  A WBS displays and defines the product, or products, to be developed and/or produced. It relates the elements of work to be accomplished to each other and to the end product.  A WBS can be expressed down to any level of interest. However the top three levels are as far as any program or contract need go unless …. 8

9  Activities  Responsibilities  Timeline  Dependencies  Costs HINT: THESE THINGS OUGHT TO BE IN YOUR PLAN! 9

10 Problem: Create the WBS for a temperature monitoring system design 10

11 There are three main tasks 1. The analog interface circuitry. 2. The LED & digital circuitry. 3. Integrate & Test. 11

12  Activity: Design Circuitry  Description: Complete the detailed design and verify it.  Deliverables/Checkpoints: 1) Circuit schematic, and 2) Verify in simulation.  Duration: 14 days.  People: Jana (1), Rob (1)  Resources: PC, SPICE Simulator  Predecessors: none 12

13 IDActivityDescriptionDeliverables / Checkpoints Duration (days) PeopleResourcesPredeces sors 1Interface Circuitry 1.1Design CircuitryComplete the detailed design and verify it in simulation.  Circuit schematic  Simulation verification 14Rob (1) Jana (1)  PC  SPICE simulator 1.2Purchase Components  Identify parts  Place order  Receive parts 10Rob1.1 1.3Construct & Test Circuits Build and test. 1.3.1Current Driver Circuitry Test of circuit with sensing device.  Test data  Measurement of linearity 2Jana (1) Rob (2)  Test bench  Thermo- meter 1.2 1.3.2Level Offset & Gain Circuitry Test of circuit with voltage inputs.  Test data  Measurement of linearity 3Rob (1) Jana (2)  Test bench1.2 1.3.3Integrate Components Integrate the current driver and offset circuits.  Test data verifying functionality and linearity requirement 5Rob (1) Jana (1)  Test bench  Thermo- meter 1.3.1 1.3.2 13

14 PERT: Project Evaluation and Review Technique  Statistical methods to estimate project completion time.  Based on earlier studies that show that project task completion follows a Beta probability distribution. 14

15  A network diagram is a ???  We will use AON (Activity on Node) 15

16 16

17 Problem: identify the paths to completion. 17

18 Critical Path = Slippage = Float = 18

19 Problem: Calculate the float for all activities in network. 19

20 20

21  How do you complete projects within cost?  Need to be able to estimate costs for ◦ System design ◦ Development ◦ Manufacture  Basics presented here – complex problem that requires experience. 21

22 Fixed costs Variable Costs Break-Even Point 22

23 23

24 24

25  Take the initial time estimates for activities and double them!  Assign a lot of time for testing and integration.  Factor in lead times for part ordering.  Assign a project manager(s).  Do not assign all team members to all tasks.  Track the progress versus the plan.  Don’t become a slave to the plan.  Experience counts. 25

26 A Project Plan should contain  Work Breakdown Structure. Identify the activities, deliverables, responsibilities, duration, resources, and dependencies.  Gantt Chart and/or Network Diagram. Provide a graphical representation of the project plan.  Costs. Develop a tabulated list of costs and for the equipment, materials, and labor necessary to carry out the project. 26

27  Three important objectives of project management are to complete the project ◦ On-time ◦ Within budget ◦ To meet the needs of the user.  WBS – hierarchical breakdown of activities needed to complete a project.  Network diagram – graphical representation of activities for project – can use for quantitative analysis of project.  Cost estimates ◦ Break-even analysis ◦ Cost estimation models 27