Presentation is loading. Please wait.

Presentation is loading. Please wait.

REGULATION, PERMITS & AUDITS. PERMITS ARE REQUIRED PRIOR TO ANY PHYSICAL CONSTRUCTION TYPES OF PERMITS DEPEND ON THE LOCALITY, STATE RELATIONSHIPS, AND.

Similar presentations


Presentation on theme: "REGULATION, PERMITS & AUDITS. PERMITS ARE REQUIRED PRIOR TO ANY PHYSICAL CONSTRUCTION TYPES OF PERMITS DEPEND ON THE LOCALITY, STATE RELATIONSHIPS, AND."— Presentation transcript:

1 REGULATION, PERMITS & AUDITS

2 PERMITS ARE REQUIRED PRIOR TO ANY PHYSICAL CONSTRUCTION TYPES OF PERMITS DEPEND ON THE LOCALITY, STATE RELATIONSHIPS, AND FEDERAL ORGANIZATIONS –COUNTY GENERAL (http://www.sccgov.org/sites/deh/HMCD/HazMat/H MDocs/Pages/Docs_Construction.aspx) –FOR SANTA CLARA COUNTY, BUILDING PERMITS ARE SUMMARIZED ON A WEB PAGE: (http://www.sccgov.org/sites/scc/Pages/Search.asp x?svtyp=Organizations)

3 ENVIRONMENTAL PERMITS BASED ON LOCAL, STATE, REGIONAL AND FEDERAL REGULATION FEDERAL –http://www.epa.gov/http://www.epa.gov/ STATE –http://www.calepa.ca.gov/http://www.calepa.ca.gov/ ENVIRONMENTAL PERMITS ARE OBTAINED THROUGH THE ENVIRONMENTAL HEALTH DEPARTMENT (

4 WATER USE PERMITS THESE ARE NECESSARY BOTH FOR THE CONSUMPTION OR WATER AND THE GENERATION OF WASTES http://www.valleywater.org/Programs/Per mits.aspx HAS INFORMATION FOR THE VALLEY.

5 PERMIT RESPONSIBILITY COST OF PERMITS ARE TO THE OWNER WHO PAYS FOR THE PERMIT PREPARATION PAYS THE ASSOCIATED FEES RESPONDS TO THE RULING OF THE REGULATORY BODY THE ENGINEER MAY BE CONTRACTED TO PROVIDE THE PERMIT PREPARATION http://www.londonarray.com/wp- content/es-cover.jpg

6 LISTS OF REQUIRED DOCUMENTS AVAILABLE FROM LOCAL BUILDING COMMISSIONS. FOR OUR PROJECTS, IT IS NECESSARY TO ASSEMBLE A LIST OF PERMITS REQUIRED FOR THE PROJECTS AND TO DEVELOP A SCHEDULE TO COMPLETE THESE THIS GROUP OF PERMITS SHOULD SHOW UP ON THE PROJECT SCHEDULE.

7 TYPICAL PERMITS I ENVIRONMENTAL (BASED ON THE REGULATORY GROUP) COUNTY – http://www.sccgov.org/sites/deh/consum er%20protection%20division/paf/Pages/ PermitsApplicationsFees.aspx http://www.sccgov.org/sites/deh/consum er%20protection%20division/paf/Pages/ PermitsApplicationsFees.aspx STATE - http://www.calgold.ca.gov/http://www.calgold.ca.gov/ FEDERAL - http://apps.ecy.wa.gov/permithandbook/c ategory.asp?id=12 http://apps.ecy.wa.gov/permithandbook/c ategory.asp?id=12

8 AIR POLLUTION BACT TO MEET MOST STRINGENT OF STATE, LOCAL AND FEDERAL STANDARDS http://www.arb.ca.gov/html/lawsregs.htm http://www.arb.ca.gov/html/lawsregs.htm –PARTICULATE –MISTS –AEROSOLS –CHEMICALS http://www.power- technology.com/contractor_images/du stex/1.jpg

9 STREAM POLLUTION http://www.swrcb.ca.gov/water_laws/inde x.htmlhttp://www.swrcb.ca.gov/water_laws/inde x.html http://www.oehha.org/prop65/law/index.h tmlhttp://www.oehha.org/prop65/law/index.h tml WASTEWATER TREATMENT SOLIDS REMOVAL CHEMICAL REMOVAL BIOLOGICAL TREATMENT THERMAL DEEP WELL INJECTION http://www.scottsvalley.org/ Clarifier%204.jpg

10 SOLIDS DISPOSAL HAZARDOUS MATERIALS AND INTEGRATED WASTE REGULATION –http://www.dtsc.ca.gov/LawsRegulationsPolicies/index.htmlhttp://www.dtsc.ca.gov/LawsRegulationsPolicies/index.html –http://www.ciwmb.ca.gov/Law.htmhttp://www.ciwmb.ca.gov/Law.htm THERMAL TREATMENT - INCINERATION AND PYROLYSIS LAND FILL PONDS CONCENTRATION & DENSIFICATION WHEREVER POSSIBLE http://www.depweb.state.pa. us/justforkids/lib/justforkids/la ndfill.jpg

11 ENVIRONMENTAL IMPACT STATEMENT WRITTEN BY ENVIRONMENTAL REGULATORY GROUP BASED ON ENVIRONMENTAL ASSESSMENT REPORT FROM OWNER

12 OSHA STATE - http://www.dir.ca.gov/DOSH/dosh1.html# CalOSHA http://www.dir.ca.gov/DOSH/dosh1.html# CalOSHA FEDERAL - http://www.osha.gov/http://www.osha.gov/ SPECIFIC CONCERNS INCLUDE –NOISE –SAFETY –INDUSTRIAL HYGIENE

13 LOCAL IMPACT SARA TITLE III FIRE HAZARDOUS MATERIALS –HAZAN –HAZOP TRAFFIC LOCAL SERVICES –HEALTH,SAFETY AND SECURITY –OTHER PUBLIC SERVICES http://ec3.images- amazon.com/images/P/0873 711122.01._BO2,204,203,20 0_PIsitb-dp-500- arrow,TopRight,45,- 64_AA240_SH20_SCLZZZZ ZZZ_.jpg


Download ppt "REGULATION, PERMITS & AUDITS. PERMITS ARE REQUIRED PRIOR TO ANY PHYSICAL CONSTRUCTION TYPES OF PERMITS DEPEND ON THE LOCALITY, STATE RELATIONSHIPS, AND."

Similar presentations


Ads by Google