Presentation is loading. Please wait.

Presentation is loading. Please wait.

Tonga Water Purification Project

Similar presentations


Presentation on theme: "Tonga Water Purification Project"— Presentation transcript:

1 Tonga Water Purification Project
by Dr. G. Ogonda OSIENALA (Friends of Lake Victoria) Kisumu, Kenya

2 Tonga Water Purification Project
Introduction Access to clean drinking water is a major challenge to most developing nations and according to UNICEF, every day, worldwide 4,500 children die because they lack access to clean water GNF and its Kenyan partner organisation OSIENALA (Friends of Lake Victoria) have constructed a drinking water treatment plant to the 1,000 boys and girls of Tonga Secondary School Friday, April 21, 2017

3 Tonga Water Purification Project
The water purification plant Technology by SilverSan and Buderus of Germany Solar plant by SolarWorld of Germany Transport by Lufthansa & financial grant from Ursula Merz foundation It was installed as a model/demonstration drinking water treatment plant from January 2009, the equipment supplies clean water for two schools with a total of 1,000 pupils (Tonga Girls Secondary School and Tonga Boys Secondary School). Friday, April 21, 2017

4 Tonga Water Purification Project
Tonga Community Water supply is tapped by gravity from streams flowing from the surrounding hills Water is polluted through human waste and animal grazing from the surrounding fields. Frequent outbreak of water borne diseases such as diarrhoea Water Treatment plant in constructed in Suba District Nyanza Province Friday, April 21, 2017

5 Tonga Water Purification Project
Plant The daily output of the drinking water treatment system is about 1,000 litres. The equipment comprises a pump unit as well as an additional storage tank in which the water is conserved by use of SilverSan technology. The water is filtered, sterilized and thanks silver ions added to the water conserved for the long term. Then the purified water is being pumped into a closed tank, thus avoiding bacterial growth. Friday, April 21, 2017

6 THANK YOU Friday, April 21, 2017


Download ppt "Tonga Water Purification Project"

Similar presentations


Ads by Google