Presentation is loading. Please wait.

Presentation is loading. Please wait.

ARTEMIS-2010-1 pSafeCer Grant Agreement number 269265 ARTEMIS-2011-1 nSafeCer Grant Agreement number 295373 Safety Certification of Software-intensive.

Similar presentations


Presentation on theme: "ARTEMIS-2010-1 pSafeCer Grant Agreement number 269265 ARTEMIS-2011-1 nSafeCer Grant Agreement number 295373 Safety Certification of Software-intensive."— Presentation transcript:

1 ARTEMIS-2010-1 pSafeCer Grant Agreement number 269265 ARTEMIS-2011-1 nSafeCer Grant Agreement number 295373 Safety Certification of Software-intensive Systems with Reusable Components Akhela nSC WP200 – Status of the activity Massimiliano Turco (Akhela - massimiliano.turco@akhela.com ) SafeCer P7 September 25-27, 2013 Riga

2 27 th of September 2013, Riga Page 2 ARTEMIS-2010-1 pSafeCer Grant Agreement number 269265 ARTEMIS-2011-1 nSafeCer Grant Agreement number 295373 Presentation outline WP200 objectives and deliverables WP210 overview WP220 overview WP230 overview D211.1_ D212.1: status D221.1_ D222.1: status WP200 deliverables and corrective actions Forthcoming activities and potential risks

3 27 th of September 2013, Riga Page 3 ARTEMIS-2010-1 pSafeCer Grant Agreement number 269265 ARTEMIS-2011-1 nSafeCer Grant Agreement number 295373 WP200 objectives The WP200 objective is to transform the pSafeCer prototype framework of tools in a project-ready tool framework with a smart integrated tool chain, reusable components and a framework for the design, implementation, testing, validation of safety certifiable embedded systems; in addition, the CAR will provide support and automation for configuration management activities. WP200 Implementation and integration WP210 Integration of results of pSafeCer WP220 Tools extensions WP230 Evaluation and Validation of the safeCer platform

4 27 th of September 2013, Riga Page 4 ARTEMIS-2010-1 pSafeCer Grant Agreement number 269265 ARTEMIS-2011-1 nSafeCer Grant Agreement number 295373 WP210 Work package numbernSC 210Start date or starting event:Month 13 (April 2012) Work package titleIntegration of results of pSafeCer Work package leaderFBK WP210 will analyze the results of psafeCer in order to identify the enhancement necessary to use the tool framework in an industrial certification project. In particular, will analyze: The feedback of the pSafeCer instantiations to smooth the customization of the Tool Framework and Certification Artifact Repository to the specific domains. The feedback of the pSafeCer demonstrator to improve the usability and effectiveness of Tool Framework and Certification Artifact Repository along the certification process. The quality of the tools’ code and documentation.

5 27 th of September 2013, Riga Page 5 ARTEMIS-2010-1 pSafeCer Grant Agreement number 269265 ARTEMIS-2011-1 nSafeCer Grant Agreement number 295373 D211.1 Prototype analysis document D212.1 Prototype enhancement specification Document These deliverables are the output of the work package nSafeCer WP210 on “Integration of pSafeCer results”. The main objective of WP210 is to integrate the results of pSafeCer by analyzing them and specifying which enhancements should be developed by nSafeCer.

6 27 th of September 2013, Riga Page 6 ARTEMIS-2010-1 pSafeCer Grant Agreement number 269265 ARTEMIS-2011-1 nSafeCer Grant Agreement number 295373 It provides an analysis of the current status of the pSafeCer tool framework highlighting what is missing and what should be extended/integrated/implemented in nSafeCer. It highlights the drawbacks of the framework to support the certification process proposed in pSafeCer and the demonstrators that will be carried out in nSafeCer. One of the main concerns is the status of integration of the CTF and other tools with the CAR, which is seen as pivotal for the certification process. Other concerns are related to the missing support for the preparation of certification material and safety argumentation. Moreover, each tool of the framework needs some extensions mostly related to the SafeCer process and component models, contract verification, and dependability and safety analysis. It includes a high-level specification of what will be implemented in nSafeCer.

7 27 th of September 2013, Riga Page 7 ARTEMIS-2010-1 pSafeCer Grant Agreement number 269265 ARTEMIS-2011-1 nSafeCer Grant Agreement number 295373 WP220 WP220 will implement extensions of the tools developed in the framework pSafeCer CTF and CAR integration design proposal GPM integration design proposal Improvement of existing tools and new tools Mapping of Use Cases and tools Facilities Work package number220Start date or starting event:Month 21 (Dicember 2012) Work package titleTool extensions Work package leaderAKHELA

8 27 th of September 2013, Riga Page 8 ARTEMIS-2010-1 pSafeCer Grant Agreement number 269265 ARTEMIS-2011-1 nSafeCer Grant Agreement number 295373 D221.1_ D222.1 – Requirements, Architecture and Design Document for Tool Framework This deliverable includes information about the enhancement design for the Tool Framework. CTF and CAR integration design analysis GPM integration design analysis Improvement of pSafeCer tools and new tools Mapping of Use Cases and tools Facilities

9 27 th of September 2013, Riga Page 9 ARTEMIS-2010-1 pSafeCer Grant Agreement number 269265 ARTEMIS-2011-1 nSafeCer Grant Agreement number 295373 CTF and CAR integration design analysis [1] The integration of the CAR and CTF is interpreted as a mutual collaboration to implement the fundamentals tasks requested by the continuous certification objective: following the artefact evolution, regenerating the obsolete artefacts to keep the system certifiable and, maintaining artefact traceability information.

10 27 th of September 2013, Riga Page 10 ARTEMIS-2010-1 pSafeCer Grant Agreement number 269265 ARTEMIS-2011-1 nSafeCer Grant Agreement number 295373 CTF and CAR integration design analysis [2] The CAR has to work out and store the reference to the CAR imported artifacts (location) and their traceability links and dependency links, calculated on the basis of the rules defined in the CAR input model, containing the most general relationship between the artifact classes involved in the certification process. As well, the CAR has to performs the impact analysis, which checks the artifact updated status and consequently detects the artifacts to be regenerated in order to make the artifact status consistent and the system still certifiable. The CTF has to execute the tool chain, generating new artifacts or the old ones which need to be update.

11 27 th of September 2013, Riga Page 11 ARTEMIS-2010-1 pSafeCer Grant Agreement number 269265 ARTEMIS-2011-1 nSafeCer Grant Agreement number 295373 GPM integration design analysis [1] The interaction with the CTF is centered on identifying the “families” of tools required by a certification process such as: requirement management tools, modelling tools, IDE, compilers, static analysis tools and so on. SafeCer partners will be encouraged to integrated their own (or external) tools in the CTF, so as to develop an integrated tool chain covering most activities identified by the generic certification process. The interaction with the CAR consist in a mechanism to manage the certification artefacts produced by the activities described by the generic process and its domain- specific instantiations. The core idea is to deduce an artefact-centric process model and use it to configure the CAR.

12 27 th of September 2013, Riga Page 12 ARTEMIS-2010-1 pSafeCer Grant Agreement number 269265 ARTEMIS-2011-1 nSafeCer Grant Agreement number 295373

13 27 th of September 2013, Riga Page 13 ARTEMIS-2010-1 pSafeCer Grant Agreement number 269265 ARTEMIS-2011-1 nSafeCer Grant Agreement number 295373 WP120 Process: the key research element of this work package will be the development of the co-certification process and associated techniques for certifying systems developed using a product-line engineering approach. WP220: CTF, CAR and GPM interaction GPM integration design analysis [2] Integration between WP100 (GPM) and WP200 (CAR and CTF)

14 27 th of September 2013, Riga Page 14 ARTEMIS-2010-1 pSafeCer Grant Agreement number 269265 ARTEMIS-2011-1 nSafeCer Grant Agreement number 295373 Aimed to integrate the GPM with the Platform, in order to perform a specific certification process it’s key to determinate an xml as input to initialize the system (CAR/CTF and tools, sequence of tools and, consequently, artefacts to track) Definition of interface with CAR/CTF possibly by September 2013 Which process elements should the process models contain? (e.g. Tools for CTF and artefacts for CAR) Provision of the XML related to the processes, modeled in SPEM2.0/EPF GPM integration design analysis [3] Integration between WP100 (GPM) and WP200 (CAR and CTF)

15 27 th of September 2013, Riga Page 15 ARTEMIS-2010-1 pSafeCer Grant Agreement number 269265 ARTEMIS-2011-1 nSafeCer Grant Agreement number 295373 GPM integration design analysis [4] Portion of XML related to the ISO26262 process, modeled in SPEM2.0/EPF (MDH) CTF is “in charge” of the tools, so it could extract the tools info from the input process xml file. We have to discuss the details about the xml structure, involving also AdaCore and their CAR module.

16 27 th of September 2013, Riga Page 16 ARTEMIS-2010-1 pSafeCer Grant Agreement number 269265 ARTEMIS-2011-1 nSafeCer Grant Agreement number 295373 New Specific tools [1] One of the goals of sub-WP220 is to develop new specific tools or their integration in the existent pSafecer Tool Framework. The tools will be categorized in the following categories providing languages and facilities that permit the interoperation of the following tool during the safety certification process: Requirement Tool Analysis and V&V Tool Structural Design Tool Functional Design Tool IDE Testing Tool Furthermore, tools already presented in the Platform could be updated and or modified. Work-in-progress.

17 27 th of September 2013, Riga Page 17 ARTEMIS-2010-1 pSafeCer Grant Agreement number 269265 ARTEMIS-2011-1 nSafeCer Grant Agreement number 295373 New Specific tools [2] At the moment of writing the discussion is still open regarding new tools. UPM proposed the new tool PeabraiN PeabraiN is composed of a collection of PIPE tool-compliant modules for performance estimation and resource optimization based on bounds computation for Stochastic Petri Nets (SPNs).

18 27 th of September 2013, Riga Page 18 ARTEMIS-2010-1 pSafeCer Grant Agreement number 269265 ARTEMIS-2011-1 nSafeCer Grant Agreement number 295373 Mapping of Use Cases and tools [1] In the WP220 activity, an investigation has been performed regarding the planned Use Cases and the related tools indicated by the UC providers. This has been done, under the point of view of the CTF, for: 1)better understanding the specific Use Case 2)better knowing and identifying the related tools 3)better understanding the sequence of tools and, most important, 4)how this impacts on the CTF and CAR, respect the integration and then automatization of a specific certification process

19 27 th of September 2013, Riga Page 19 ARTEMIS-2010-1 pSafeCer Grant Agreement number 269265 ARTEMIS-2011-1 nSafeCer Grant Agreement number 295373 Mapping of Use Cases and tools [2] Use cases Railway [pSC WP5.3] - Intelligent mobile device for safe braking SAFE-R (RTU) [pSC WP5.3] - Snow Sensor for Point Heating Use Case SSPH (Algorego) [pSC WP5.3] - Conception ”Train control and monitoring system: Doors Control” TCMS (CAF) [nSC WP320] TCMS - Train Control Monitoring System: Doors Control (CAF) [nSC WP330] SCSLC - Safety Control System on Level Crossings (RTU) [nSC WP340] Incremental certification based on a generic fault tolerant computing platform - TAS Control Platform (Thales Austria) Aerospace [nSC WP420] Avionic On-Board Systems (TCS) [nSC WP430] Air Traffic Control – ARTAS demonstrator (Vitrociset) [nSC WP440] LOEO - Low-Orbit Earth Observation (TASE) Automotive [nSC WP520] HEVP - Hybrid Electric Vehicle Powertrain (AVL/ViF) [nSC WP530] Autosar Basic Software Modules (SP) [nSC WP550] Construction Equipment Evaluation (VCE) Cross Domain [nSC WP620] TTE - Time Triggered Ethernet Switch (TTTECH) [nSC WP630] FlexRay, BusScope on-line diagnosis (AIT) [nSC WP640] Automated External Defibrilator (Bexen Cardio/ Osatu)

20 27 th of September 2013, Riga Page 20 ARTEMIS-2010-1 pSafeCer Grant Agreement number 269265 ARTEMIS-2011-1 nSafeCer Grant Agreement number 295373 Facilities nSafeCer can add new wizards, templates and facilities that can be useful in the artifact lifecycle. MS Word plug-in proposed by Resiltech MS Word plug-in allows to import a list of requirements thanks to a document plug-in with an easy user interface. The interface should allow the user to highlight easily part of the text that is a requirements and the tool should populate a requirement DB from that. Output could be, for instance, in a format easily integrated into the CAR or in some format compatible with SQL DB.

21 27 th of September 2013, Riga Page 21 ARTEMIS-2010-1 pSafeCer Grant Agreement number 269265 ARTEMIS-2011-1 nSafeCer Grant Agreement number 295373 WP230 WP230 will to evaluate and validate the use of the SafeCer framework in a real environment, making sure that the framework is ready for industrial use. Support to the demonstrators for instantiating the SafeCer framework Collection of feedbacks from the demonstrators Properly validate the SafeCer framework Work package numbernSC 230Start date or starting event:Month 25 (April 2013) Work package titleEvaluation and Validation of the SafeCer platform Work package leaderADACORE

22 27 th of September 2013, Riga Page 22 ARTEMIS-2010-1 pSafeCer Grant Agreement number 269265 ARTEMIS-2011-1 nSafeCer Grant Agreement number 295373 WP200 deliverables Del. no Deliverable name Lead beneficiary Delivery dateComments nSC D211.1/ nSC D212.1 Prototype analysis document ------------------------------------------ Prototype enhancement specification document FBK M26 (May 2013)Released in April 2013 (M25) nSC D221.1/ nSC D222.1 Extended requirement document for tool framework ------------------------------------------- Architecture document, design document for tool framework AKHELA M30 (September 2013) Preliminary draft version released at the end of April 2013. Deliverable released for internal review the 20 th of September 2013, as scheduled. nSC D223.1 Enhanced software prototypeAKHELA M42 (September 2014) Not yet started (M31) nSC D224.1 Test cases and test results for tool framework AKHELA M48 (march 2015) Not yet started (M43) nSCD231.1 SafeCer platform instantiation report ADACORE M42 (September 2014) On-going (started M25) nSC D232.1 Demonstrator feedback on the SafeCer framework ADACORE M42 (September 2014) Not yet started (starts M33) nSC D233.1 SafeCer platform validationADACORE M48 (march 2015) Not yet started (starts M43)

23 27 th of September 2013, Riga Page 23 ARTEMIS-2010-1 pSafeCer Grant Agreement number 269265 ARTEMIS-2011-1 nSafeCer Grant Agreement number 295373 Work PackageAction\RequestResultDeadline WP210 (FBK)Merge the deliverable “nSC D211.1 Prototype analysis document” to the following one, “nSC D212.1 Prototype enhancement specification Document” Single deliverable document M25 (April 2013) WP220 (Akhela) Merge the deliverable “nSC D221.1 - Requirements Document forTool Framework” to the following one, “D222.1 - Architecture Document,Design Document for Tool Framework” Single delivarable named: “nSC D221.1_ D222.1 – Requirements, Architecture and Design Document for Tool Framework" M30 (September 2013) Same date scheduled for “D222.1 - Architecture Document, Design Document for Tool Framework”. WP200 Corrective Actions

24 27 th of September 2013, Riga Page 24 ARTEMIS-2010-1 pSafeCer Grant Agreement number 269265 ARTEMIS-2011-1 nSafeCer Grant Agreement number 295373 Forthcoming activities and potential risks Software phase following the design of new addition and enhancement of the platform, as described above. Consequently, the D221.1_D222.1 should be labeled as a “living document” to be updated and aligned accordingly to the software developments. Release of a intermediate software prototype able to perform a possible simplified certification process (GPM/CTF/CAR), possibly covering one of the planned UC (or part of it). Risk: put in place a fully working integration with CTF/CAR & GPM.


Download ppt "ARTEMIS-2010-1 pSafeCer Grant Agreement number 269265 ARTEMIS-2011-1 nSafeCer Grant Agreement number 295373 Safety Certification of Software-intensive."

Similar presentations


Ads by Google