Presentation is loading. Please wait.

Presentation is loading. Please wait.

Beyond the PROFET Juergen Schulze MET Norway. Who's MET Norway?

Similar presentations


Presentation on theme: "Beyond the PROFET Juergen Schulze MET Norway. Who's MET Norway?"— Presentation transcript:

1 Beyond the PROFET Juergen Schulze MET Norway

2 Who's MET Norway?

3 3 PROFET ?

4 4 PROFF Field Editor

5 5

6 6 Prior to PROFET

7 7 Text forecast ·50000 Pages of Text forecasts a year ·5-20 people 24/7

8 8 TV forecast

9 9 Edited Meteogram ·Offshore forecast ·Subjective Point forecasts

10 10 Auto Meteogram

11 11 ICAO Products

12 12 And then came yr.no

13 13 yr.no ·Launched in September 2007 ·Free data policy ·5th biggest weather website on the planet ·Interpolation on demand ·9 mio places registered ·Top=6.9 mio unique users/week ·Point forecasts obsolete

14 14 YR Heatmap

15 15 PROFET … the intentions Bringing the forecaster into the production chain

16 16 More intentions Creating products from a single source

17 17 Even more intentions Forecast consistency by using a single source

18 18 How PROFET works ·Choosing the “correct” model ·Fixing systematic errors in the model fields

19 19 Usage – Intended ·Intention to point out dangerous errors

20 20 Usage – Intended … and real ·Intention to point out dangerous errors ·Used to adapt the model output to fit the forecasters opinion

21 21 Usage - frequency PARAMETERSUMMERWINTER 1h Precipitation1.9 % 2.8 % Wind0.9 %2.4 %

22 22 VERIFICATION

23 23 Equitable Threat Score (ETS) YESNO YESab NOcd ·Threat Score: TS= a / ( a + b + c ) ·Hits expected by chance: E = (a+b) ( a+c ) / n ·ETS = ( a – E ) / ( a + b +c – E )

24 24 Verification: Precipitation 24h precipitation / summer1h precipitation / summer APPROVED DATASET / DEFAULT MODEL

25 25 Verification Systematic error Precipitation +30h forecast BIAS [mm / 24h ] SUMMERWINTER ALL CASES DEFAULT MODEL 0.80.5 APPROVED DATASET 0.7 EDITED CASES DEFAULT MODEL 4.20.8 APPROVED DATASET 3.71.7

26 26 Verification: comments ·Edited forecasts are more pessimistic than the model ·Forecasters are able to identify situations where the model has considerable errors, but editing the fields is not the optimal way to distribute this knowledge ·Situation has changed since the beginning. The default model has been improved by postprocessing the dataset

27 27 And the production chain? More and more statistical and parametrisation fixes

28 28 Temperature? ·High resolution height model (50m horizontal) ·Inhomogeneous ·Deep valleys

29 29 Temperature? ·High resolution height model (50m horizontal) ·Inhomogeneous ·Deep valleys ·Editing forbidden

30 30 Precipitation ·Use of prob forecasts by median ·Editing is not WYSIWYG ·Post processing is time cost

31 31 Wind ·Statistical corrections for mountains and coastlines

32 32 Chosing the model ? Just two times a day, night shift has not the capacity

33 33 Single point of production? ·Auto text forecasts – only at high sea. ·Norway is quite Inhomogeneous – auto text did not succeed over land

34 34 Consistency then? ·Still TV forecast produced by table ·ICAO Products made by hand ·Text forecasts still 50K pages

35 35 Consistency - yr.no/kart vs yr.no

36 36 Consistency - yr.no/kart vs yr.no

37 37 Consistency - yr.no/kart vs yr.no

38 38 Why stopping right now? ·New Supercomputer – New Model ·AROME 2.5 km High res model over Norway ·Updates 6 or 8 times a day ·High res postprocess chains – time intensive with editing

39 39 The final reason ·Moving PROFET to AROME would cost a recognizable amount of infrastructural change – due to the implementation of NetCDF as the new grid format

40 40 What next? The Forecaster is off the production chain again

41 41 Meteorologen live ·Making direct comments on the situation ·Model/run/grid independent ·Issuing geolocalised warnings, alerts, etc directly into the final product ·Maximum latency of 10 minutes

42 42 Implementation ·Phase 0: Soon ·Using Common Technology for communication (Twitter/Blog) ·Phase 1: September 2013 ·Adapting existing infrastructure to a set of the new requirements ·Phase 2: Not yet set ·Complete new infrastructure with a postGIS database engine for the geolocalisation

43


Download ppt "Beyond the PROFET Juergen Schulze MET Norway. Who's MET Norway?"

Similar presentations


Ads by Google