Download presentation
Presentation is loading. Please wait.
Published byOliver Goodwin Modified over 9 years ago
1
RTF Staff, Subcommittee and Work Updates March 13, 2012
2
Proposal to Change UES Measure Status Residential Weatherization Manufactured Home and Single FamilyManufactured HomeSingle Family – Measures: Attic, Floor, and Wall insulation, and Window retrofits Infiltration Reduction – Current Status: Active The Issue: Infiltration Reduction measures do not account for the increased mechanical ventilation requirements required by the measure. – Savings are too high, costs are too low. Staff Recommendation – Change measure status to “Under Review” – RTF staff to work with subcommittee to come up with a proposal to estimate savings and costs. 2
3
Operations Subcommittee Met March 5 BPA “EE Utility Summit” May 8 & 9, Portland February 14 Minutes Pump VFD Subcommittee UES Measure Review Status RTUG Protocol End Use Business Case Kickoff Lighting Standard Protocol Kickoff Statements of Work
4
Small/Rural Subcommittee Eugene Rosolie and Gillian Charles Co-leads Met on 3/8 Initial focus on RTF-specific recommendations: – developing commercial school measures, – creating a measure design checklist to ensure small/rural consideration in the measure and specification development, – test out a few small saver measures Next meeting will be late March/early April – Draft the design checklist – Review progress on school measures, small savers, and GSHP.
5
Upcoming Subcommittee Meetings Standard Protocol for Pump VFD – 15 March 2012 9:00 am Measure Life Guidelines – Tuesday March 20, 10:30-12 noon – Wednesday March 28, 1-2:30 pm CVR Standard Protocol – Thursday March 22, 1 – 2:30
6
Website Updates Measure Workbooks: Residential | Weatherization - Manufactured Home (changed to Active status) Residential | Heating/Cooling - Air Source Heat Pump Upgrades MH Residential | Heating/Cooling - Air Source Heat Pump Upgrades SF Residential | Heating/Cooling - PTCS Commissioning, Controls, & Sizing MH Residential | Heating/Cooling - PTCS Commissioning, Controls, & Sizing SF (all revised to allow new construction applications) Residential | DHW - HPWH (revised to include Tier 2 interior ducted applications)
7
Contracts Underway Business Case for End Use Load Study – KEMA Underway – Kickoff Meeting, 5 March 2012 – Other Contractors Providing In-Kind Help Lighting Standard Protocol – ERS Underway – Kickoff meeting 12 March 2012
8
Statements of Work Statements of work finishing – ELCAP Data updated to modern database – 208 RTF End Use Load Shapes to 8,760 – ProCost manual and updates – UES Measure Reviews – 41 Measures
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.