Presentation is loading. Please wait.

Presentation is loading. Please wait.

Angelyn Moore IGS Central Bureau Jet Propulsion Laboratory USA The IGS Network.

Similar presentations


Presentation on theme: "Angelyn Moore IGS Central Bureau Jet Propulsion Laboratory USA The IGS Network."— Presentation transcript:

1 Angelyn Moore IGS Central Bureau Jet Propulsion Laboratory USA The IGS Network

2 Contents Stations Data Retrieval and Quality Checks Summary Information Files Network Coordination

3 Requirements are stated in http://igscb.jpl.nasa.gov/network/guide_igs.html Emphasis is on performance characteristics. Some key examples: [Receiver] Dual-frequency code and phase with AS on or off [Receiver] At least 8 channels [Receiver] At least 30 second sampling rate [Receiver] Observation synchronization +/- 1 ms of true GPS time [Monument] First-order geodetic monument with respect to stability, durability, maintenance, documentation, and access [Monument] IERS DOMES number from domes@lareg.ensg.fr or http://lareg.ensg.ign.fr/ITRF/domesreq.html [Site] Minimal obstruction to at least 15 degrees elevation Recommendation: meteorological or weather instruments (especially precise Barometer) Equipment at the IGS Stations

4 Receiver -> modem -> phone line -> modem -> computer Receiver -> computer -> internet -> computer Receiver -> wireless -> computer -> internet -> computer Receiver > VSAT > computer Operator's choice based on available infrastucture, cost, & benefits... but low latencies are always preferred Data Retrieval Methods Vary

5 Sites which meet additional requirements will be attractive to the specialized Working Group and Pilot Project applications. Ultra-rapid products/Low Earth Orbiter Data submission must be at least hourly; 1 second sampling time Troposphere Working Group Meteorological instruments including precise barometer (recommended for all stations!) Time Transfer Pilot Project Suitable receivers, external precise frequency standard (cesium or preferably H maser); special care in cabling with respect to temperature stability and reporting of cable changes Application Networks

6 Clear a 4-character site ID with the Central Bureau Fill out a site log according to ftp://igscb.jpl.nasa.gov/station/general/blank.log Submit site log and sample RINEX to CB When log is approved and available at CB, begin submitting data to a Data Center and notify the community with an IGSMail Initiation of Operations

7 Keep the site log correct and current. Email updates within one day of a major update to the site. Email the log to igscb@igscb.jpl.nasa.gov or utilize the automatic submission method described at http://igscb.jpl.nasa.gov/network/sitelog-submissions.html Observe the format. Choose equipment names from the official list at ftp://igscb.jpl.nasa.gov/station/general/rcvr_ant.tab Ongoing Site Log duties

8 Data quality should be established before transmission to Data Center Suggest simple monitoring for anomalies: Herb Dragert's "11 fields to monitor" Site ID Sample Rate Year Number of observations Julian day Number of gaps Start Time Number of cycle slips Stop Time Multipath *mean ionospheric variations (narrowlane noise normalized by sample rate) 10 of these are available from teqc +qc and do not require ephemerides ( see http ://www.unavco.ucar.edu/software ) CDDIS provides such data at ftp://cddisa.gsfc.nasa.gov/pub/reports/gpsstatus but operators should pre-monitor Ongoing Data Monitoring Duties

9 Archive raw tracking data Keep current with RINEX format (defined at ftp://igscb.jpl.nasa.gov/igscb/data/format) and your RlNEX conversion software Submit daily RINEX to a Data Center by 0200 UT Information in RINEX header (antenna, DOMES, receiver, height) must be correct and match the site log Avoid data resubmission but if it is necessary, send an IGSMail An upcoming request: be ready to switch to an alternate Data Center within 1 business day, in case of major Data Center inavailability Observe evolving IGS recommendations such as for observables in RINEX from newer codeless receivers (see next slide) Ongoing Data Submission Duties

10 Following IGSMail #2235: Older IGS receivers such as AOA Rogue and TurboRogue track 4 quantities: C1= C/A code at L1 frequency L1(C1)= C/A-based phase at L1 frequency P2-P1= cross-correlated pseudorange L2-L1= phase difference and report 4 observables: C1P2’ = C1 + (P2-P1) L1(C1)L2’= L1(C1)+(L2-L1) Codeless receivers, e.g. AOA Benchmark, Ashtech Z-XII track 6 observables: C1 and L1 (C1) P1= Y1-codeless pseudorange at L1 frequency L1 (P1)= Y1-codeless-based phase at L1 frequency P2= Y2-codeless pseudorange at L2 frequency L2(P2) = Y2-codeless-based phase at L2 frequency Transition to Codeless Receivers

11 The Problem: Use of the codeless P1 and P2 observables before April 02, 2000 (Wk 1056) or c1 and PZ’ after April 02, 2000 introduces a satellite-dependent bias (~2 ns) in ionosphere-free pseudoranges. Clock products and point positioning become corrupted in an unpredicable way when biased and unbiased (codeless and cross- correlated) measurements are mixed. Since April 02 (Wk 1056) the P1, P2 observables should be used with all IGS products and operators should be providing them to IGS. See IGS Mail #2744 for more details and how to form P1, P2 when only cross- correlated-styles C1, P2’ are available. Transition to Codeless Receivers

12 SINEX template Generated at CB from current site logs Provides tabulation of station parameters vs. time for input to analysis yyddd.status and check_* files at CDDIS Simple teqc reports and latency reports igsnet weekly email from CB with each station's Quality, Quantity, Latency QualityQuantityLatency valid clocks > 250Avg. # valid clocksAvg. in hrs <100 phase bias resets 3D formal location err < 1 cm rms pseudorange residuals <86cm pseudorange meas. >.9*phase meas. rms phase residuals <13nm Commonly Used Summaries

13

14

15

16

17 Coordination and liason functions as regards the network as a whole between station operators, users, data centers, and analysts ? Questions, concerns, suggestions are always welcome! Examples:  I need to relocate my monument. How can I make the change go smoothly for the analysts?  I am not able to get hourly data quickly enough in Europe.  Why did my station’s quality score decrease?  The SINEX template does not have a phase center for the antenna at station ABCD. Role of Network Coordinator

18 Angelyn Moore IGS Network Coordinator & Deputy Director, Central Bureau Jet Propulsion Laboratory 4800 Oak Grove Drive, M/S 238-540 Pasadena, California 91109 USA Angelyn.W.Moore@jpl.nasa.gov Questions?


Download ppt "Angelyn Moore IGS Central Bureau Jet Propulsion Laboratory USA The IGS Network."

Similar presentations


Ads by Google