Real-time Monitoring and Diagnostic Solution for an HVAC System ECE Team 169 Anthony Bellantoni (EE) Greg Carmichael (EPhys) Joe Grassi (EE) Sponsored.

Similar presentations


Presentation on theme: "Real-time Monitoring and Diagnostic Solution for an HVAC System ECE Team 169 Anthony Bellantoni (EE) Greg Carmichael (EPhys) Joe Grassi (EE) Sponsored."— Presentation transcript:

1 Real-time Monitoring and Diagnostic Solution for an HVAC System ECE Team 169 Anthony Bellantoni (EE) Greg Carmichael (EPhys) Joe Grassi (EE) Sponsored by: Qualtech Systems Inc. Advisor: John Chandy

2 Presentation Outline Project Goals Last Semester Accomplishments TEAMS Completed Designer Model Overview of Code Project Limitations Project Timeline Project Budget Wrapping Up Project

3 Overall Project Goals Update and complete HVAC Model - Previous Senior Design Project –Developed Partial Diagnostic Model of the ITEB HVAC System Develop C++ program, extract and analyze real-time data from the building sensors Combine model and code to detect for faults in real-time.

4 Fall 2012 Completed and fixed HVAC model Met with facilities to ensure model was correct Main Limitation o No Real-time data  Hard to develop code

5 TEAMS Testability Engineering and Maintenance system Designer RDS o R emote Diagnostic Server SDK o Combines client to RDS http://tomgpalmer.com/wp-content/uploads/legacy-images/FLASH%20LIGHT.jpg

6 Procedure

7

8 3rd Floor Schematics

9

10

11

12 Picture for RDS using mike (maintenance group) most likely 3 slides

13 RDS

14 C++ Coding Goals Extract sensor values from text file and determine whether or not a failure is occurring Save results to a text file Import results file into TEAMS-RT TEAMS-RT will combine code with our model and determine most probable failure point and associated test cost

15 How to determine a failure Set threshold value for maximum deviation from setpoint Cannot assume failure after one test Initiate a counter to count number of tests in a row that fail If consecutive tests trend toward the set point, counter returns to 0 If deviation from the set point is less than the maximum allowed, counter returns to 0 If n tests in a row fail and do not approach set point, assume failure

16 How to arrange code, method 1 Advantages/Disadvantages + Code is simple - Harder to change n - Lots of files/messy Sensor 1 Sensor 2 Sensor n Combine all sensor code to one file and create an n-column text file with results Input results into TEAMS-RT

17 Method 2 Advantages/Disadvantages + Code is neat and easy to debug + Easy to change number of sensors - Coding is difficult Temperature Humidity One code file to extract results from n sensor files and output results into an n-column text file Input results into TEAMS-RT

18 Project Limitations Cost and time of each failure o Talked to facilities: do not have information Obtaining access to actual VAV sensor values

19 Project Timeline TaskSeptemberOctoberNovemberDecemberJanuaryFebruaryMarchApril Software access Schematics Research HVAC Update model Learn C++ Develop code Merge code and model Test and debug

20 Project Budget http://i.crn.com/images/free_cloud_400.jpg http://blog.outreach.com/wp-content/uploads/2011/09/Church-events-on-no- Budget.jpg http://www.rosemarierealty.com/wp- content/uploads/2012/03/dreamstime_xs_17999966-300x300.jpg http://static.seekingalpha.com/uploads/2009/3/4/saupload_mar04_09_bm.jpg

21 Next Steps: Weekly Goals March 10 - March 16 Multiply our code to work for multiple VAVs Learn and Read TEAMS-SDK Manual Label possible reasons of failure for maintenance checks in TEAMS Designer March 17 - March 23 (Spring Break) Research associated pricing for each component (including maintenance) March 24 - March 31 Continue to debug and implement code Continue step-by-step instructions for maintenance fixes Add any found costs/maintenance pricing found into TEAMS Wrap up model + code April Contact Moises to check if model is complete Begin final presentation & report preparation Wrap up Entire project and present it

22 Questions ?