Presentation is loading. Please wait.

Presentation is loading. Please wait.

UNCLASSIFIED 1 JCA Future Initiatives to WJTSC 10-1 31 March 2010 Joint Staff J-7, JFDID.

Similar presentations


Presentation on theme: "UNCLASSIFIED 1 JCA Future Initiatives to WJTSC 10-1 31 March 2010 Joint Staff J-7, JFDID."— Presentation transcript:

1 UNCLASSIFIED 1 JCA Future Initiatives to WJTSC 10-1 31 March 2010 Joint Staff J-7, JFDID

2 Task–>JCA Mappings JRC / JCA Mapping UJTL Readiness Model UTC / SRC Mapping Proposed/Possible Scheduled/ Tentative (JCRM) JFRR DRRS QDR FY12 IPL Submission JCA Refinement JCAMS Global Force Mgmt Architectures APEX 4Q101Q112Q113Q114Q111Q122Q123Q124Q121Q102Q103Q10 Spiral 3 Complete Svc/CSA IA/NG Readiness BEA FEA ? Capability Templates JCAMP Mid-term JCA Timeline Spiral 4 Complete AP Pilot JCTD Spt Other Segment Dev JP 5-0 Revision Initial Draft

3 3 UNCLASSIFIED Current & Future Initiatives Current: JCA – Joint Capability Requirements Manager (JCRM) integration Operational Contract Support Task Force – Implementation Near to Mid-term: Architecture Uses –Joint C2 Architecture Capability Assessment Enterprise (JACAE) –Joint Mission Threads (JMT) and Operational Testing & Evaluation JCA Refinement – Oct 2010 Service / Agency Tasks to JCA Mapping Adaptive Planning Pilot (APP) JCTD support Long-term: Adaptive Planning (APEX) support (capability templates) JCA – Chairman’s Readiness System integration Federal Enterprise Architecture (FEA)

4 UNCLASSIFIED 4 JCA Refinement JCA Core Team –Update JCA POCs (JSAP – S: 18 Mar) –Re-convene the Core Team – Refinement Process Brief Known Issues Working Groups (prior to data call) –Engineering / Installation Support –Corporate Management and Support (BTA) –Human Terrain / Linguists / Chaplain –Space Enablers –Logistics – Class of Supply vs. Supply Chain function Data Call (Sep) Refinement Process as defined in JCAMP (Oct-Nov) Other Considerations –JCA co-chair IPRs –Outreach to new users in the JCA COI –JCA refinement functionality in JCAMS Spiral 4

5 UNCLASSIFIED 5 JCA Refinement (con’t) JCAMP Guidance – JCAs should: –use a functional framework –to the extent possible, be mutually exclusive –capture all DoD capabilities –promote a stable framework –be develop / managed according to the Capability Relationship Model –developed to a level of fidelity that supports capability analysis, strategy development, investment decision making, capability portfolio management, and capabilities-based force development and operational planning –remain a logical breakdown of functional capability areas into sub- components and does not constitute prioritization or importance

6 6 UNCLASSIFIED Known JCA Refinement Aim Points Gaps Biometrics Science reach-back / CBRN forensics Chaplain Interpreters / Human terrain Personal security Overlaps Engineering Installations Support Logistics Services Further decomposition / refinement Corporate Management & Support Logistics Special interest areas Space Enabler JCA Doctrinal alignment

7 UNCLASSIFIED 7 Enterprise Architectural Uses

8 Unclass/FOUO/Draft Pre-Decisional Operational Activities Systems Functions Joint Staff J7 Mapping Architectures Analysis Accreditations Concepts/Plans Assessments Policy Standards Policy Standards Policy Standards Policy Standards Policy Standards Policy Standards Operational Programmatic Technical Documentation Policy Standards Joint Integration & Interoperability Detailed Recommendations via Detailed DOTMLPF Analysis Policy Standards Joint Capability Areas (JCAs) Other CPMs C2 Portfolio* - Programs of Record - Systems - Sub-systems - New Capabilities JCAs- to- PECs CAPE Mapping CPM Areas Capability Mapping Baseline Operational Context “Periodic Table” for Analysis NCES/NECC USAF USA USMC USN Joint Common System Functions List (JCSFL) JTF Operational Activities / Tasks / Sub-tasks Tier I UJTL SN X.X ST X.XX OP X.X.X TA X.X.X.X Joint Warfighter Billets Authoritative Sources: AUTLs, MCTL, NTTL, AFTL Platforms/Weapons Applications/Services ADS & Data Models Networks/Comms Joint Tasks Service Tasks Op Nodes Operational Nodes & Billets JCAs JCAs

9 Unclass/FOUO/Draft Pre-Decisional Operational Activities Systems Functions Joint Staff J7 Mapping Architectures Analysis Accreditations Concepts/Plans Assessments Policy Standards Policy Standards Policy Standards Policy Standards Policy Standards Policy Standards Operational Programmatic Technical Documentation Policy Standards Joint Integration & Interoperability Detailed Recommendations via Detailed DOTMLPF Analysis Policy Standards Joint Capability Areas (JCAs) Other CPMs C2 Portfolio* - Programs of Record - Systems - Sub-systems - New Capabilities JCAs- to- PECs CAPE Mapping CPM Areas Capability Mapping Baseline Operational Context “Periodic Table” for Analysis NCES/NECC USAF USA USMC USN Joint Common System Functions List (JCSFL) JTF Operational Activities / Tasks / Sub-tasks Tier I UJTL SN X.X ST X.XX OP X.X.X TA X.X.X.X Joint Warfighter Billets Authoritative Sources: AUTLs, MCTL, NTTL, AFTL Platforms/Weapons Applications/Services ADS & Data Models Networks/Comms Joint Tasks Service Tasks Op Nodes Operational Nodes & Billets JCAs JCAs Task What? When? Performer: Who? Where? Authoritative Sources – Why? Mission & Enablers How?

10 Unclass/FOUO/Draft Pre-Decisional Operational Activities Systems Functions Joint Staff J7 Mapping Architectures Analysis Accreditations Concepts/Plans Assessments Policy Standards Policy Standards Policy Standards Policy Standards Policy Standards Policy Standards Operational Programmatic Technical Documentation Policy Standards Joint Integration & Interoperability Detailed Recommendations via Detailed DOTMLPF Analysis Policy Standards Joint Capability Areas (JCAs) Other CPMs C2 Portfolio* - Programs of Record - Systems - Sub-systems - New Capabilities JCAs- to- PECs CAPE Mapping CPM Areas Capability Mapping Baseline Operational Context “Periodic Table” for Analysis NCES/NECC USAF USA USMC USN Joint Common System Functions List (JCSFL) JTF Operational Activities / Tasks / Sub-tasks Tier I UJTL SN X.X ST X.XX OP X.X.X TA X.X.X.X Joint Warfighter Billets Authoritative Sources: AUTLs, MCTL, NTTL, AFTL Platforms/Weapons Applications/Services ADS & Data Models Networks/Comms Joint Tasks Service Tasks Op Nodes Operational Nodes & Billets JCAs JCAs D D (Doctrine) O O (Organization) F F (Facilities) P P (Personnel) T T (Training) L L (Leadership) M M (Materiel) P P (Policy)

11 UNCLASSIFIED 11 UNCLASSIFIED Joint Mission Threads Joint Mission Thread (JMT): an operational and technical description of the end-to-end set of activities and systems that accomplish the execution of a joint mission. (CJCSI 6212.01E) operational context JMTs required to provide operational context for Joint Analysis, Assessments, Training, Experiments, Training, T&E and M&S but… Jointly validated, fully documented JMTs don’t exist

12 Unclass/FOUO/Draft Pre-Decisional Joint Mission Threads “Pulled” Through Capability Mapping Elements and Reused Net- Enabled Scenario Operation / Mission Reusable JMT Data Mission Thread #1 Mission Thread #2 Mission Thread # 3 Mission Thread # 4 Etc…. Mission Thread #1 Mission Thread #2

13 Unclass/FOUO/Draft Pre-Decisional 13 Joint Mission Thread (JMT) Initial List Counter IED Joint Personnel Recovery (JPR) Joint Suppression of Air Enemy Defense (JSEAD) Interdiction Joint Close Air Support (JCAS) Defensive Countermeasures EW/EA Military Deception Mine Operations CND/CNA/CNE Time Sensitive Targeting Joint Fires Counter Mine Counter Drug Amphibious Assault Tactical Airlift Medical Evacuation Air and Missile Defense CWMD PSYOP Maritime Interception Non-Lethal Attack Non Combat Evacuation Anti Air Warfare Initial JMT List Joint Close Air Support

14 UNCLASSIFIED 14 JACAE

15 UNCLASSIFIED 15 JACAE

16 UNCLASSIFIED 16 UNCLASSIFIED Joint Capabilities Requirements Manager (JCRM)

17 UNCLASSIFIED 17 Joint Requirements Code (JRC) explosive

18 18 explosive

19 UNCLASSIFIED 19 UNCLASSIFIED Proposal: Map the JCAs to the JRC JCA Tier 1 Logistics JCA Tier 2 Engineering JCA Tier 3 General Engineering Combat Engineering Geospatial Engineering

20 20 JCA Tier 1 Logistics JCA Tier 2 Engineering JCA Tier 3 Capability Search explosive

21 21 JCA Tier 1 Logistics JCA Tier 2 Engineering JCA Tier 3 Capability Search

22 UNCLASSIFIED 22 UNCLASSIFIED CJCS’ Operational Contract Support TF Collect Data –Categorize “service” contracts by type – System Spt, External Spt, Theater Spt –Map contract support by Joint Capability Area (JCA) –Cross-reference JCAs to the Universal Joint Task List (UJTL) Assess reliance/dependence on contract support across capability areas relative to organic capabilities In the Summer of 2008, SECDEF posed a question to CJCS regarding DOD’s dependence on contractors… which was further scoped to dependence on contractor provided combat and security training CJCS desired a more in-depth study to determine the range and depth of contracted capabilities necessary to support the Joint Force CJCS Intent… –Better understand contracted capabilities in Iraq and Afghanistan to determine areas of high reliance or dependence… –Guide the development of future contingency planning and force development

23 UNCLASS 23 Study Approach 266K 7.5K 15K 26K Base Camp Weapon Systems Security/Reconstruction Logistics Interpreters Systems Support Contracts External Support Contracts Theater Support Contracts USFOR

24 UNCLASS 24 Logistics JCAs likely to account for ~78% Personnel breakdown by Type of Service

25 UNCLASSIFIED 25 UNCLASSIFIED CJCS’ Operational Contract Support TF

26 UNCLASSIFIED 26 UNCLASSIFIED CJCS’ Operational Contract Support TF

27 27 UNCLASSIFIED Questions

28 Unclass/FOUO/Draft Pre-Decisional 28 Joint Mission Thread Architecture & Testing Working Group (JMTAT WG) JC2 Network Partnership Joint Systems Integration & Interoperability Lab (JSIIL) JMTAT WG NE-UJT WG JMTAT WG was formed 25 Jun 09 to collaboratively :  Develop JMT terminology and define processes for JMT development for maximum reusability, extending down to the technical/tactical level  Discover the consumers and producers of JTMs across the DoD, including Interagency and Coalition threads – intent is to leverage work already done  Develop CONOPS, and other guiding documentation, and the initial JMTs Consists of over 200 reps from across the DoD architecture, testing, exercise, and capability development communities JMTAT WG DKO Site: https://www.us.army.mil/suite/page/525239https://www.us.army.mil/suite/page/525239

29 Unclass/FOUO/Draft Pre-Decisional 29 Tier 1: Tier 2: JMT Development Products JMT “Strand” Tier 2 information represents specific documentation required to answer a particular question or solve a problem. JMT Strands are unique JMT segments that will have specific actors for each node, might use a Service-specific set of TTPs or CONOPS, may be AOR-specific or use a unique set of systems and apps – all subset of Tier 1 information (OV-5, SV-1, etc.). JMT generic data description – totally reusable architecture-based info sets JMT: AV-1(High Level), OV-1, OV-2, OV-4, OV-5a, SV-1, Measures, High-Level Executable Architecture (EA) & IV JMT “Strands”: (Additional) AV-1 (Specific), OV-2, OV-3, OV-4, OV-5b, OV-6c, SV-1, SV- 3, SV-5s, SV-6, SV-10c, SvcV-3, SvcV-5, Baseline EA, or documents that show: Node/System Pairing Message Order Distributions Timings Decision processes System attributes System Functionality (IAW JCSFL) Information Exchange Requirements (IERs) Message composition Interoperability Matrix Data Exchange Requirements (DERs) System Capabilities Tool suite will include JACAE, Architecture-Driven Analysis (ADA) EAs, augmented by: JDEIS JCSFL Joint Style Guide (Army’s Joint Test Threads +)

30 UNCLASSIFIED 30 UNCLASSIFIED

31 31 UNCLASSIFIED JRC to JCA Mapping

32 UNCLASS 32 Theater Support Data Sources CENTCOM CENSUS Data –QTRLY data spanning FY07-FY08 –Contains System, External and Theater Support contracts –Includes 13 detailed data elements (US, TCN, LN, Location, Requiring Activity, Mission, Description, K-Duration, K-Number, Company, Supporting Unit) –Does not include contract dollar value External Support Contracts –Services and Agencies Provide –FY03 through FY08 System Support Contracts –Services and Agencies Provide –FY03 through FY08 0 I II III IV V CENTCOM CENSUS 07-08 Personnel Start FY03 Linked to slide 12


Download ppt "UNCLASSIFIED 1 JCA Future Initiatives to WJTSC 10-1 31 March 2010 Joint Staff J-7, JFDID."

Similar presentations


Ads by Google