Download presentation
Presentation is loading. Please wait.
Published byClare Andrews Modified over 9 years ago
1
KARNATAKA SLUM DEVELOPMENT BOARD AND ABHIVRUDHI SOCIETY FOR SOCIAL DEVELOPMENT ( LEAD NGO)
2
The Consultancy Assignment for Information, Education and Communication (IEC) strategy development, implementation through selected field NGOs, designing, planning, training, monitoring, evaluation and documentation under Basic Services for Urban Poor (BSUP) Integrated Housing and Slum Development Programme (IHSDP) of Central Government sponsored JnNURM Schemes
3
The overall objective of this project is to evolve and execute an Information, Education and Communication strategy for the involvement of the urban poor especially women/children/youths/aged persons in improving living standards of their communities and situations within their families towards overall neighborhood and ultimately city improvement.
4
To improve the quality of life of slum residents, To increase the standard of Health, Education and Community life in the slums, To provide sustainable improvements in the standards of Living, Social Status, Health, Education etc.
5
To provide skill up gradation / increase potential income of people living in slums To take up Health promotional programmes like MCH, FW and Nutritional programmes and to promote Family Planning. To reduce gender disparity, drug addiction etc.
6
To formulate IEC strategy To develop media plan To workout the communication strategy To evolve action plan (implementation Plan) To design, produce and supply IEC materials to KSDB To implement the IEC action plan in the slums in 22 IHSDP towns across the state To develop and utilize CBOs for counseling and Education purposes
7
To initiate income generation activities through governmental and Non- governmental services To formulate and utilize neighborhood committees To identify and arrange for short training programmes for wage earning Counseling for transformation slums into Place for live Place for work Place for spell
8
WORK PLAN AND METHODOLOGY
9
Design survey tools Ground work-Rapport Building with Community through various community understanding events and make community to actively participation in the project Preliminary interaction, surveys. Collection of data Analysis of the data
10
Establish goals, Objectives and Targets Plan for activities at micro level Ste the goals and targets for the project cycle in consultation of KSDB
11
Selection and appointment of field NGO Capacitate the field NGOs on major indicators of the project Develop Micro Action Plan for implementing the IEC strategy in slum by Field NGOs as per the needs assessed in slum survey Develop IEC tools, mode and materials for individual type of strategy Develop financial modules for undertaking implementation of IEC strategy by Field NGOs Develop TOT Manual for Field NGOs Develop monitoring and evaluation formats Develop Documentation format in line with JNNURM project guidelines given by GoI
12
Community consultations Map the opportunities and leverages the resources for the linkage services linkages to the community on need base
13
Rapport building, Community understandings, disseminating the information, role clarity Setting up Communication channels, Mechanisms to flow of ease communication- Bottom to top
14
A. Conduct Targeted Behavioral Research, Community consultations, Focused group discussions, interactions, IPC with compilation of action plan from field NGO B. Design messages, choose media and channels Conduct trainings for identified Field NGOs to take up implementation of the project Deploy field NGO to specific town and slums Assist them to prepare Action Plan and any problem faced on field C. Develop IEC materials by adopting steps viz., Design Prototype Materials, Pretest, Revised Materials, As envisaged in the TOR issued by the KSDB, the IEC materials will be designed, developed and supply to KSDB D. Cost and cost-effectiveness of materials Mapping the existed materials and plan for leverage and utilization in consultation with KSDB
15
Training to the Key staff of the project on Project management over the project cycle Training on JnNURM and 7 Point charter to Field NGOs/KSDB Officials-State level Training on JnNURM and 7 Point charter to the Municipality officials in 22 IHSDP towns- State level Trainings to Field NGOs on formation of CBOs/SHGs and CSOs 2 days Residential Trainings to Field NGOs to build CDN proposal
16
Leadership trainings Life Skills Trainings (including Personal Development, Time Management, communication skills etc,.) Training on Gender Sensitization Trainings on EDP Trainings on availing Govt Schemes Trainings on Health and Personal Hygiene Trainings on Savings and Book Keepings Trainings on Community Mobilization Trainings Sensitization programme on immunization
17
Conduct Targeted Behavioral Research, Design messages, choose media and channels Develop IEC materials by adopting steps viz., Design Prototype Materials, Pretest, Revised Materials, Cost and cost-effectiveness of materials
18
Plan distribution strategy, Development of media plan Development of action plan Plan effective ways for utilizing materials Awareness programmes Health camps Educational camps Magic Shows Public meetings Health clinics Student/teacher sensitization programmes Referral services Introducing innovative programmes
19
IEC Day Ward Education Programme Satisfied customers contact programme IEC Center ( Corner) Social Marketing and IEC IEC through quiz competitions IEC through conducting social games IEC through Street Plays, singing songs and drama IEC through role plays and case studies
20
Structure of IEC:
21
To improve overall heath status through preventive and curative community base methods with following objectives; - Awareness about prevention and cure of common illness, - Community health services through slum based health workers and OPD, - Reduce maternal and infant mortality, promote institutional delivery - Address specific issues such as AIDS, TB, Malaria, Dengue, etc.,
22
Family Health (Nutrition, Health Care, personal hygiene), Child & Maternal Health Linkage with Government health systems for referrals, Demystify heath beliefs Health Insurance
23
To improve the education status by making innovative interventions - Increase enrolment and decreasing dropout rate, Enable children to cope with school curriculum Use of innovative teaching methods, computer training Involve parents and community in children education,
24
Increase education levels amongst dropout and non school going children especially girls, Increase literacy levels amongst adult residents
25
Gender Equity, Child Marriage, Sexual Abuse etc., Social Crimes Bias due to religion or caste
26
To increase and reinforce earning skills of slum residents, Identify and Increase earning skills, Impart and enable training for acquiring skills, Create support for practicing these skills
27
To enable savings and access to formal credit and reduce dependence on usurious money lenders. Expenditure management – resource mobilized To create savings option of for affordable amounts, To form a credible saving society with transparent record and offers fast and affordable credit, To strengthen the movement of using micro-credit as a tool of empowerment.
28
To increase options and infrastructure for increasing incomes: To identify market based income generation options, To build capacities for these skills (Human and Institutional support) To set up institutions that can independently undertake income generation operations.
29
To ensure maintenance of household and access to basic services: To facilitate access to basic services such as water, drainage, and toilets on household basis, To facilitate paved roads, street lighting and solid waste management, Housing, To ensure maintenance of household and common services,
30
Objective: To enable long term sustenance of Integrated Slum Development through community participation in implementation, management, and financial contribution. To create technical, managerial, and leadership capacities, To enable and nurture community based institutions that can sustain relevant development initiatives. Legal support available in LAW Awareness on Child Rights and Eradication of Child Labour, To identify the basic requirement viz., Livelihood Centre, Park, Creech, School etc., and to project it to appropriate authority.
31
Motivate to form groups/committees under various government schemes/policy and other CBOs/voluntary organizations. Convergence of existing schemes in government viz., SJSRY, PMRY, SCSCT Development Corporation, BC Development, Social Security measures: Awareness on the existing Government schemes of Old Age Pension, Widow Pension, Scholarship, Nutrition Programmes (ICDS) etc.,
32
Design, Plan, Develop IEC Strategies following adequate sample surveys and a systematic assessment of the target audiences and Action Plan with their participation depending on location, region, size and need of the slums, Design, planning and Develop IEC materials (communication tools) appropriate to meet the needs of the programme by involving communication professionals wherever necessary, Develop monitoring module for field NGOs who will actually implement the IEC program on field. Develop training modules and provide necessary training to the selected Field NGOs on implementation of the IEC programme in the identified slums,
33
Coordinate with the field NGO for effective implementation of the IEC program in individual slum /town/city. Coordinate Supervise, monitor field activities and update KSDB on field progress of IEC program. Documentation of process of creating awareness among the slum communities supported with both video and photos. Report of Citizen Perception Survey to measure the outcome of the project. Revise IEC Strategies and IEC materials on the feedback, experience and suggest way forward for State wide implementation of programme. Submit the relevant reports to Govt./ Coordination committee whatever required.
34
Open for Discussion
35
Thank You
Similar presentations
© 2025 SlidePlayer.com Inc.
All rights reserved.