1
The DMAIC Process Detail The Define Phase
© Max Zornada (2005)
2
The Define Stage Define The Voice of the Customer
The Voice of the Business The Voice of the Customer The Voice of the Process Business Case and Project Team Charter Define the Customer and the Customer Requirements Define and map the process © Max Zornada (2005)
3
The Define Phase Identify and confirm the improvement opportunity;
Develop a Project Team Charter Build an Effective Team; Define the Customer and Customer Requirement; Define and Map the Process. © Max Zornada (2005)
4
DMAIC Process Storyboard
TEAM FORMATION DEFINE MEASURE Objective: Identify and implement the measures required to establish baseline performance and quantify the opportunity. Objective: Select problem/ opportunity theme, select team members Objective: Define the Problem/Opportunity, Customers, Customer Requirements, and Process. Team charter Key Steps:- Key Steps:- Cause and Effect Diagram Run chart or control chart Flowchart Determine what to measure Understand the measures Understand Variation Assess measurement system Assess process performance Develop business case Develop project team charter Understand Customer Requirements Understand the Process. Output: Problem/Opportunity selected, Team members selected. Output: Team Project Charter, Work Plan, Measurable Customer Requirements, Process Map/Process Analysis Output: A quantified picture of the current process performance, problem impact. The process sigma rating. ANALYSE IMPROVE - I : Generate Potential Solutions Objective: Identify and verify the root cause(s) of the problem. Objective: Determine possible solutions that will address the identified root cause(s) of the problem. Key Steps:- Cause and Effect Diagram (Fishbone) Pareto Chart Checksheet Key Steps:- Analyse data Analyse process Determine potential root causes Hypothesis Testing Verify root causes Potential Solutions Action Plan Generate potential solutions Assess potential solutions Select preferred solution Test/Pilot preferred solution Develop implementation plan Step 1 Step 3 Step 2 Step 4 Step 5 Step 6 Output: Root cause(s) identified. Output: Preferred solution or countermeasures IMPROVE - II: Implement and Check CONTROL - Standardise FUTURE PLANS Objective: Implement the preferred solution. Confirm that the problem and its root cause(s) have been reduced or eliminated. Objective: Prevent the problem and its root cause from recurring. Objectives: Review team effectiveness, plan to address remaining issues and institutionalise the learning. Key steps:- Key steps:- Flowchart Standard procedure D M A C I Before After Key Steps:- Implement preferred solution Verify effectiveness Apply comparative methods if necessary. Standardise the solution (standards & procedures) Document project Implement scorecard Implement controls Define, Measure, Analyse, Improve, Control Review remaining project opportunities Review other applications Review learnings Output: Recommendations for future projects and improvements to team processes. Project documentation and learnings “pack” Output: Confirmation that the best solution to eliminate the problem & its root cause(s) has been implemented. Output: Solution embedded and “routinised” in relevant process, procedures and standards. © Max Zornada (2005)
5
Team Formation © Max Zornada (2005)
6
Team – A Definition Common people, working together to attain uncommon results; A team is a small number of people with complementary skills, who are committed to a common purpose, performance goals, and approach for which they hold themselves mutually accountable. Katzenback, Jon R. and Smith, Douglas K. The Wisdom of Teams, 1995 © Max Zornada (2005)
7
The Components of Teamwork
What we do How we do it Content Process Technical inputs required to progress the problem solving process through to a solution. eg. Technical skills; Technical knowledge; Knowledge of the process and of the business; Data and information; Other specific inputs. Task Relationship How to do it How we feel Facilitating group processes; Making the team fun to be a part of; Recognising/appreciating contributions The DMIAC process Six Sigma Process Improvement and Problem solving tools and techniques, Statistical techniques. © Max Zornada (2005)
8
Characteristics of an Effective Team
The atmosphere tends to be informal, comfortable, relaxed. There are no obvious tensions; There is a lot of discussion in which virtually everyone participates, but it remains pertinent to the task of the group; The task or objective of the group is well understood and accepted by the members; The members listen to each other; There is disagreement; Most decisions are reached by a kind of consensus, in which it is clear that everybody is in general agreement and willing to go along; Criticism is frequent, frank and relatively comfortable; People are free in expressing their feelings as well as their ideas, both on the problem and on the group's operation; When action is taken, clear assignments are made and accepted; The team leader does not dominate it, nor does the team defer unduly to him/her; The team is self-conscious about its own operations. © Max Zornada (2005)
9
Stages of Team Development
Performing Adjourning Performance Norming Forming Storming Time © Max Zornada (2005)
10
Stages of Team Development
Forming Storming Norming Performing Adjourning Who are we? Getting to know each other? We do not agree Cooperating and getting involved This is as good as it gets! Job done! Clarify the mission/ purpose of the team; Establish specific objectives and tasks; Identify roles and responsibilities of team members. Reestablish roles &/or ground rules; Acknowledge & confront conflict by focusing on the facts; Clarify & understand the team's purpose Develop decision making process; Be prepared to offer ideas & suggestions; Utilise all resources to support team effort. Actively contribute ideas; Achieve desired objectives; Establish milestones for success. Evaluate efforts; Tie up loose ends, discuss future plans; Recognise and reward team efforts. Task Get acquainted with one another; Establish a set of ground rules; Recognising that people are checking each other out. Actively listen to all options; Respond to feelings that emerge or are hidden; Create focus to direct team efforts. Support the team's decisions in and outside the team; Give and receive feedback comfortably; Respect individual differences. Feel a sense of satisfaction; Develop personal & professional relationships; Find ways to sustain momentum and enthusiasm. Express thanks and appreciation; Discuss feelings, many may feel sad, depressed; Create a sense of closure, reduce dependency on team Relationship © Max Zornada (2005)
11
Launching the Team Team/ Project Charter Form the team;
Establish ground rules; Develop a team mission/purpose; Develop a shared team vision; Develop specific team goals, objectives and performance targets. Team/ Project Charter From Katzenback, Jon R. and Smith, Douglas K. The Wisdom of Teams, 1995 © Max Zornada (2005)
12
Skills and Knowledge Required by the Team
Team Leadership Skills Group process facilitation and interpersonal skills Six Sigma Process Improvement/ Problem Solving Skills Technical job skills and knowledge of the business. © Max Zornada (2005)
13
Successful Team Functioning
Clarity in team goals; A plan to work to; Clearly defined roles; Clear communication; Beneficial team behaviours; Well-defined decision procedures; Balanced participation; Established group rules; Awareness of the group process; Use of the scientific approach (in Six Sigma DMAIC). In Six Sigma, provided by the project/ team charter From Peter Scholtes: The Team Handbook. © Max Zornada (2005)
14
Where teams and team based efforts have failed, they typically:
Lacked management support and resources; Lacked the training or the disciplines to apply "team basics" to their work i.e. no formal process like PDCA or DMAIC; Worked on projects that were considered unimportant and not connected to core business; Were not considered or integrated into long-term organisational plans; Were led by leaders that lacked leadership "know how" and/or had minimal training as team leaders. Adapted from Katzenback, Jon R. and Smith, Douglas K. The Wisdom of Teams, 1995 © Max Zornada (2005)
15
Problem/Opportunity Selection
© Max Zornada (2005)
16
Six Sigma Project Selection Establishing the Business Case
The business case establishes the importance of the project to the business in terms of meeting business objectives; Components of a business case: The output unit for the customer of the process, usually the external customer; The primary business measure of the output unit; The baseline of the primary business measure; The gap in the baseline performance with the business objective. The purpose is to establish the need in terms of business objectives - usually expressed in financial terms. © Max Zornada (2005)
17
Example: Business Case SEFP
Output unit for the External Customer Boxes food product delivered to their customers; Primary Business Measure of the output unit: Unit cost of Packaging in $/Box Baseline of the primary business measure: $23.94 per box Business Objective: $22.50 per box Gap = $1.44 per box © Max Zornada (2005)
18
Develop a Problem/Opportunity Theme Statement
The problem/opportunity theme statement provides the initial definition of the problem/opportunity area to be pursued; It is on the basis of the problem/opportunity theme statement that management decide to allocate resources (the problem solving team) and time to develop a project team charter and determine whether the problem/opportunity is worth pursuing. © Max Zornada (2005)
19
Problem/Opportunity Theme Statement
Project Title: What is the area of concern? What first brought this problem or opportunity to the attention of your business? What impact has this problem already had? What evidence is there that it is a problem worthy of attention? What will happen if the business does not address this problem? Summary problem statement (summarise the above in a concise statement). © Max Zornada (2005)
20
Problem Statements Problem Statements should ideally describe the following:- What is wrong? Where is the problem appearing? How big is the problem? (Quantify) What is the impact of the problem on the business. What problem statement should not do:- State and opinion of what is wrong; Describe the cause of the problem; Assignment blame or responsibility for the problem; Describe a solution; Combine several problems into one. © Max Zornada (2005)
21
Identifying the problem
Developing a problem statement: What is the deviation - should vs actual? What is the symptom? Be specific in what it is and what it is not; What is it? vs. what is it not? Where is it? vs. where could it also be but is not? When does it occur vs. when does it not occur? How many? How big? © Max Zornada (2005)
22
Problems as deviations
What should be happening What is happening different to What should be happening = Problem! What is happening = What should be happening No Problem! What is happening © Max Zornada (2005)
23
Problems with Problem Statements Disguised Solutions!
We’re experiencing delays in putting sales data in an understandable form. We have to purchase or otherwise obtain the necessary additional equipment. Turnover in the department is 20% higher than company average. Marketing reported a sudden increase in customer complaints about our product. We need to redesign our main product to make it more modern? We must identify the specific training required to correct this performance. Error rates in the past two months are unacceptably high. We need to stream line the ordering process. © Max Zornada (2005)
24
DMAIC Process Storyboard
TEAM FORMATION DEFINE MEASURE Objective: Identify and implement the measures required to establish baseline performance and quantify the opportunity. Objective: Select problem/ opportunity theme, select team members Objective: Define the Problem/Opportunity, Customers, Customer Requirements, and Process. Team charter Key Steps:- Key Steps:- Cause and Effect Diagram Run chart or control chart Flowchart Determine what to measure Understand the measures Understand Variation Assess measurement system Assess process performance Develop business case Develop project team charter Understand Customer Requirements Understand the Process. Output: Problem/Opportunity selected, Team members selected. Output: Team Project Charter, Work Plan, Measurable Customer Requirements, Process Map/Process Analysis Output: A quantified picture of the current process performance, problem impact. The process sigma rating. ANALYSE IMPROVE - I : Generate Potential Solutions Objective: Identify and verify the root cause(s) of the problem. Objective: Determine possible solutions that will address the identified root cause(s) of the problem. Key Steps:- Cause and Effect Diagram (Fishbone) Pareto Chart Checksheet Key Steps:- Analyse data Analyse process Determine potential root causes Hypothesis Testing Verify root causes Potential Solutions Action Plan Generate potential solutions Assess potential solutions Select preferred solution Test/Pilot preferred solution Develop implementation plan Step 1 Step 3 Step 2 Step 4 Step 5 Step 6 Output: Root cause(s) identified. Output: Preferred solution or countermeasures IMPROVE - II: Implement and Check CONTROL - Standardise FUTURE PLANS Objective: Implement the preferred solution. Confirm that the problem and its root cause(s) have been reduced or eliminated. Objective: Prevent the problem and its root cause from recurring. Objectives: Review team effectiveness, plan to address remaining issues and institutionalise the learning. Key steps:- Key steps:- Flowchart Standard procedure D M A C I Before After Key Steps:- Implement preferred solution Verify effectiveness Apply comparative methods if necessary. Standardise the solution (standards & procedures) Document project Implement scorecard Implement controls Define, Measure, Analyse, Improve, Control Review remaining project opportunities Review other applications Review learnings Output: Recommendations for future projects and improvements to team processes. Project documentation and learnings “pack” Output: Confirmation that the best solution to eliminate the problem & its root cause(s) has been implemented. Output: Solution embedded and “routinised” in relevant process, procedures and standards. © Max Zornada (2005)
25
The Define Stage During the Define Stage, we:
Define our problem or opportunity and improvement objectives; Define the customers and their requirements - the Critical-to-Quality issues (CTQ); Define the process that will be affected; Develop a plan for completing the project; Key outputs of the Define Stage: Team Project Charter and Work Plan Measurable Customer Requirements - Customer Requirements Statement Process Map/Process Analysis. © Max Zornada (2005)
26
Six Sigma Project Team Charter
Cost of Waste Reduction Project Project Title Process Box Packaging Expected Financial Impact $253,000 Green Belt Jane Verde Telephone Number John Briggs Champion Organization/Function Packaging Operations 1- October Start Date 1-April Target Completion Date Problem/Opportunity Definition The cost of waste in box packaging is excessive and causes box packaging operations to run at a loss. The cost of waste needs to be reduced to achieve target cost levels. What is the Problem to be solved or the opportunity this project will exploit. Objective Improvement target, impact on Sigma, COQ/COPQ and Customer Satisfaction Reduce net spoilage rate by 50% from 6% to 3%. Estimated Sigma level improvement from 3 to 3.4 Business Case What improvement in business performance is expected. $ impact and by when. Reduction in cost of waste of $253,000 p.a. from a baseline of $506,000. Will result in target processing cost/box being achieved. Team Members Who are the team members and key experts to be consulted. Jane Verde (Team Leader), Paul Black, Rachel Cintura, Roland Thompson, Sdravo Krysevic, Giovanni Nero (Black Belt) Project Scope Which part of the process will be investigated Box packaging from start of box filling through to placement of product on buyer shelves. Customer Benefit Who are the final customers. What benefits will they see and what are their most critical requirements. The packaging customers for whom we package and deliver product to buyers such as supermarkets and wholesalers. Benefits: competitive costs and more accurate schedule compliance. Define completion Measure completion Analyse completion Improve completion Control completion Project Completion What are key milestone dates for completion of each stage. 20-April Schedule 1-June 1-August 1-September 15-September 1-October © Max Zornada (2005)
27
Key Elements of the Project Team Charter
Problem/Opportunity Definition – see previous problem/opportunity theme statement; Objective – quantified objective to be achieved with a specified timeframe – usually expressed in physical units; Business Case – business impact expected from the project, usually expressed in financial terms; Team Members – who will be on the team; Project Scope – what is the project about, what is it not about. Provides focus. Customer Benefits – what impact will it have on the customer. Work Plan/Schedule with Key Milestones defined e.g. approximate time frame for each stage of the DMAIC Process © Max Zornada (2005)
28
Setting Objectives The SMART Principle
S for Specific - Objectives have to be specific and describe exactly what you want to achieve. Need to be able to answer the question “How will I know I have achieved my objective?” M for Measurable - if you cannot measure, you cannot manage. Objectives must be expressed in quantified (numbers) terms. A for Achievable - Objectives need to challenge enough to provide incentive, but not be unattainable. R for Relevant - Objectives must produce something of benefit. Phrase the objectives in results term - what you want to achieve, not how you will achieve it. T for Time Targeted - Objective must always specific a time frame by when they need to be achieved. If you do not know when you want to achieve you objectives by, you will always be on track. © Max Zornada (2005)
29
Breaking Down “Big” Objectives Example: Transaction Processing Operation
Reduce costs/transaction by 10% Improve Labour Reduce Rework Ask why? to go up Productivity Improve allocation Simplify work of work to people processes Ask how? to go down Develop daily schedules for allocating work to people © Max Zornada (2005)
30
Gantt Chart Working Plan Development Layout project tasks on planning proforma
Weeks People Task 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 Finalise project charter Develop CR statement Validate CR Statement Develop process map Mile stone – end of define phase Determine measures Collect measures Analyse measures Assess process stability Assess process capability/ sigma Mile stone – end of measure phase Etc. © Max Zornada (2005)
31
Gantt Chart Working Plan Development Estimate durations and time phase to indicate work sequence
Weeks People Task 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 Finalise project charter Develop CR statement Validate CR Statement Develop process map Mile stone – end of define phase Determine measures Collect measures Analyse measures Assess process stability Assess process capability/ sigma Mile stone – end of measure phase Etc. … Key Milestones © Max Zornada (2005)
32
Gantt Chart Working Plan Development Allocate People to Tasks
Weeks People Task 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 Finalise project charter Develop CR statement Validate CR Statement Develop process map Mile stone – end of define phase Determine measures Collect measures Analyse measures Assess process stability Assess process capability/ sigma Mile stone – end of measure phase Etc. … 2 2 1 1 1 1 1 1 1 1 2 2 2 3 © Max Zornada (2005)
33
Example:Project Gantt Chart & Resource Histogram on Excel
Schedule bars are drawn using the cell pattern function Float drawn using the cell borders function. © Max Zornada (2005)
34
Gantt Chart Working Plan Implementation Updating Progress
Weeks People Task 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 Finalise project charter Develop CR statement Validate CR Statement Develop process map Mile stone – end of define phase Determine measures Collect measures Analyse measures Assess process stability Assess process capability/ sigma Mile stone – end of measure phase Etc. … 2 2 1 1 1 1 1 1 1 1 2 2 2 3 © Max Zornada (2005)
35
Define the Customer and the Customer Requirements
© Max Zornada (2005)
36
Who are our customers ? A customer is anyone who comes into contact with our work
Supplier External Customer Internal Customers External Customers Those outside the organisation who use, buy or are affected by our work. Internal Customers Those within the organisation, who will be affected by our work. The next person in the process, those who may need to add to, respond to or adapt to our work. © Max Zornada (2005)
37
What is quality ? Toyota or Rolls ?
Which is higher quality? Both the Rolls Royce and the Toyota are consistently suited to their customers' purposes. © Max Zornada (2005)
38
Customer Segmentation
Different customers have different requirements; Different customers have different priorities; What Drives Customer Satisfaction Perceived Value + Perceived Quality = Customer Satisfaction © Max Zornada (2005)
39
How Customers See Quality Quality = Perceptions - Expectations
Perceived Quality Content Process What the customer gets, the actual service or product. The "technical dimension“ or output. How they get it, the process by which the service or product is delivered. The service or “experience”. © Max Zornada (2005) Parasuraman, Zeithaml and Berry (1988)
40
Dimensions of Quality Content Process Performance; Tangibles;
Features; Reliability; Conformance; Durability; Serviceability; Aesthetics. Process Tangibles; Reliability; Responsiveness; Competence; Courtesy; Credibility/Trustworthiness; Security; Access; Communication; Understanding the Customer. © Max Zornada (2005)
41
Content – Detailed Definitions
Performance. Does the product or service's primary operating characteristic measure up to the customer's expectation. eg. Is service prompt in a fast food restaurant, does the TV have good picture and sound, does the high-interest account give high interest. Features. Do the characteristics that supplement the basic function measure up to the customer's expectations. eg. Extra "bells and whistles", ability to customise your purchase. Reliability. Once you've bought it will it work for you. Conformance. Does the design conform to established standards and does your purchase conform to the design. Durability. Will it work for you on an on-going basis. Serviceability. Speed, courtesy, competence, ease of repair or ease with which problems are addressed. Aesthetics. Look, feel, sound, taste, smell. Personal judgement a significant factor. © Max Zornada (2005)
42
Process – Detailed Definitions
Tangibles. The physical evidence of service. eg. facilities, appearance of personnel, tools/equipment used to provide the service, physical representations, other customers in the service facility. Reliability. Consistency of performance, the organisation honours its promise and gets it right first time. eg. accuracy of billing, record kept correctly, no time delays. Responsiveness. Willingness and readiness of employees to provide service. Promptness, timely follow-up, calling back quickly. Competence. Skills and knowledge required to perform the service for contact and support personnel. Courtesy. Involves politeness, respect, consideration and friendliness of contact personnel. Credibility. Trustworthiness, believability, honesty, having the customers best interest at heart. Contributing to credibility are company name, reputation, personal characteristics of contact personnel, "degree of hard sell". Security. Freedom from physical danger, financial risk, or doubt about confidentiality. Access. Service is easily accessible, waiting time not excessive, convenient hours of operation, convenient locations. Communication. Keeping the customer informed and listening to them. eg. explaining the service, costs, trade-offs, how problems will be handled. Understanding the Customer. Understanding the customer's needs. eg. learning the customer's specific requirements, providing individualised attention, recognising the regular customer. © Max Zornada (2005)
43
How Customers form Expectations
Controllable Expectation Creators Past Experience External Communications Marketing Strategies Quality Dimensions Process & Content Expectations of product or service Personal Needs and Preferences Word of Mouth Competitors Un-controllable Expectation Creators © Max Zornada (2005)
44
Managing the Customer Interface
Delighted Perception Service Delivery Customer Satisfied Percep -tions Expect -ations Quality Customer interface Internal Processes Disatisfaction © Max Zornada (2005)
45
Focus on the Process Customers often assume content;
Provided the content is in the right “ball park” Customers often cannot tell the difference between good and bad content; Most of what they judge is process; Process is important! © Max Zornada (2005)
46
The RATER Framework A framework for understanding customer process
The RATER framework consolidates the dimensions of service or customer process quality into 5 key themes. Reliability - ability to perform promised service, dependably and accurately; Assurance - Knowledge and courtesy of employees and their ability to inspire trust and confidence; Tangibles - physical facilities, appearance of personnel etc.; Empathy - Providing personal understanding and customer support; Responsiveness - Willingness to help and provide prompt service. Parasuraman, Zeithaml and Berry (1988) © Max Zornada (2005)
47
The RATER Framework The RATER framework provides us with a tool for understanding and specifying the “service” or “process” dimension of the customer requirements; Used for determining what we need to establish service standards for and what these standards should be in managing interactions with customers; Can be used for designing the “operational infrastructure” required to deliver customer service to the required service standards. That is:- Processes, Organisation and Technology © Max Zornada (2005)
48
Applying the RATER Framework Example: The Room Service Process Guest Calls Room Service, Service Cycle. Quality Dimension Quality Service Standards – Customer Requirements Reliability Phone answered within five rings, 24 hours a day Assurance Phone operator has thorough knowledge of menu and prices Tangibles There is a menu in the room giving full description of what is available. Specific delivery time stated Customer name used. Prescribed guest treatment procedure carried out with sincerity. Order taken in a courteous manner. Empathy Responsiveness Effort to comply with any special requests. Prompt service. © Max Zornada (2005)
49
Using RATER to Design Service Processes
What does it mean? How do we do it? Quality Dimension Quality Service Standards Supporting Infrastructure - Processes/People/Technology Reliability Assurance Tangibles Empathy Responsiveness © Max Zornada (2005)
50
Managing Perceptions of Quality
Think of a customer contact point associated with a service you currently provide to a customer(s), how are he following dimensions managed? What could you do? Service : . Quality Dimension Quality Service Standards – Customer Requirements Reliability Assurance Tangibles Empathy Responsiveness © Max Zornada (2005)
51
Moments of Truth A moment of truth is any episode in which a customer comes into contact with any aspect of the organisation, however remote, and gets an impression of the quality of its service. When the moments of truth go unmanaged, service quality regresses to mediocrity and the customer experience of the service is poor. © Max Zornada (2005)
52
Typical Moments of Truth
Customer walks in the door; Customer telephones us; Customer receives a bill; Customer makes a special request; Customer discovers a slip-up; etc., etc.; © Max Zornada (2005)
53
Identifying the “Moments of Truth”
Review service critical incident reports to identify the types of things that go wrong; Review compensation/warranty claims etc. to see what the cause was; Understand the service cycle through "service blue printing" (process mapping); Anticipate the likely moments of truth; © Max Zornada (2005)
54
A Service System Map Understanding the Customer’s View
Front Line Manager Valuation Assessm't Document'n Stamp Settlem't Broker © Max Zornada (2005)
55
The Service Cycle © Max Zornada (2005) Customer Front Line Manager
Valuation Assessm't Document'n Stamp Settlem't Broker © Max Zornada (2005)
56
Identifying the Critical Moments of Truth
Customer Front Line Manager Valuation Assessm't Document'n Stamp Settlem't Broker © Max Zornada (2005)
57
Listening to the Voice of the Customer
© Max Zornada (2005)
58
Listening to The Voice of the Customer Tools and Techniques
Methods for obtaining feedback on customer expectations, perceptions and satisfaction. Focus groups; Face-to-face interviews; Periodic/regular formal surveys/questionnaires; Customer comment and complaint analysis; Follow-up telephone calls; Critical incident reports produced by front-line staff; Visits to major customers by management and employees; Toll-free telephone number; Follow-up customers who have discontinued dealing with us; Involve customers formally in product development; Mystery shopping. © Max Zornada (2005)
59
Customer Surveys © Max Zornada (2005)
60
Adapted Questionnaires
Adapted questionnaires aim to measure those dimensions relevant to a specific organisation and/or important to a specific customer group(s); They can be designed to have a small number of questions (eg. 10), results in an increased rate of return; Can be flexible in mode of application. eg. Customer can fill out, staff can use in face-to-face or telephone interview; Can be completed by staff and management. Comparison with customer returns can identify improvement priorities, "blind spots" and hidden strengths; Questions need to test the perceptions/expectation “gap”. © Max Zornada (2005)
61
Using Adapted Questionnaires
Questionnaires should also allow customers to give free format feedback, and not restrict them to pre-structured questions; Unstructured customer feedback can provide the spark for service and product extensions, cross-selling and innovation; Use as an ongoing monitoring tool, job-by-job, weekly, monthly - not the “big” annual customer survey. © Max Zornada (2005)
62
Adapted Questionnaires - Scoring System
No need for paired expectation-perception questions; Use - to + scale corresponding to expectations not met/met; Reduces the number of questions required to extract the same information. -2 -1 1 2 "Much less than expected" "Very disappointed" Expectations not met Unacceptable quality "As I expected" "Satisfied" Expectations met Satisfactory quality Expectations exceeded "Much more than I expected" Very impressed" Ideal quality © Max Zornada (2005)
63
Example: Hotel Customer Satisfaction Questionnaire
Assume a typical 10 question questionnaire © Max Zornada (2005)
64
Assessing Questionnaire Results Hotel Example
Item Guest Ave. Staff Ave. Gap Action 1 2 3 4 5 6 7 8 9 10 0.9 1.0 0.5 0.3 0.8 0.4 1.2 1.1 1.2 1.3 0.9 1.9 0.8 0.6 1.0 1.1 -0.3 -0.4 -1.6 -0.5 +0.6 -0.1 0.0 M C ! D ! : immediate corrective action required, C : check out for any obvious quick fix M : maintain standard, D : apparently delighting, find out why © Max Zornada (2005)
65
Customer Monitoring: A Strategy Overview
Identify Customer Priorities Major Customer Survey “Not very often” Adapted Questionnaires Weekly, by job, etc. Redo Major Survey when questions no longer reflect customer priorities. Weekly Customer Performance Monitors Monitor Questionnaires for relevance, general feedback and innovation opportunities. © Max Zornada (2005)
66
Customer Satisfaction and Loyalty
© Max Zornada (2005)
67
Impact of Customer Satisfaction on Loyalty
Would Repurchase Would Recommend Rating Category Completely Satisfied 90% 96% Somewhat Satisfied 56% 71% Neither Satisfied Nor Dissatisfied 12% 19% Somewhat Dissatisfied 3% 0% Very Dissatisfied 7% 7% Using a 5 point customer satisfaction rating. From Heil, G., Service Quality Improvement Seminar, Sydney (1992) © Max Zornada (2005)
68
Managing Customer Perceptions of Quality
Identify the elements of customer expectations you can control; Expectation levels should be set high enough to attract business, but accurately enough to reflect the reality of what is likely to be delivered 99.9% of the time; Focus on improving areas where expectations are low and importance to the customer is high; Strategic gaps in the market that provide viable footholds. Customer expectations will increase with time - so should your ability to meet them. Plan for it!; Surprise is one way to exceed customer expectations. Promise what to expect, deliver more, sometimes surprise customers. E.g. “going the extra mile when it matters. © Max Zornada (2005)
69
Kano Analysis Delighters Breakthrough Customer Needs/Features
High Customer Satisfaction Delighters Breakthrough Customer Needs/Features Satisfiers Core Competitive Requirements Not Done or Done Poorly Done Very Well Dis-satisfiers Basic Requirements Low Customer Satisfaction © Max Zornada (2005)
70
Kano Analysis Delighters Satisfiers
High Customer Satisfaction Delighters Breakthrough Customer Needs/Features Satisfiers Core Competitive Requirements Not Done of Done Poorly Dis-satisfiers Basic Requirements Done Very Well Low Customer Satisfaction © Max Zornada (2005)
71
Defining the Customer Requirements and Critical-to-Quality Requirements
Optional KANO Analysis Process/ Service/ Experience RATER Analysis Customer Requirements Statement & Ranking Customer Value Content Critical Customer Requirements CTQ Requirements Validate with Customers Interviews, focus groups, questionnaires, complaints & feedback analysis © Max Zornada (2005)
72
Simple Customer Requirements Statement
Customers need to have their food products packaged at a competitive price ($23.50) and delivered to their customers as per their schedule and order quantity manifest (100% compliance). © Max Zornada (2005)
73
Example: SEFP’s Customer Requirements Statement
What is this customer’s major complaint? What issue would they want us to work on? Outputs: Customer: Customer Requirements Measure Importance to Customer Customer Satisfaction Priority Rating 1. Cost competitiveness Boxed product delivered to buyers according to customer manifest. Contract Box Packaging Customers (Importance x Satisfaction) Target 2. Schedule compliance 2.1. On-time delivery/right day/right time. 2.2. Right product delivered 2.3. Product quality to specification 2.4. Right amount/ amount as per manifest. Processing cost $/Box % On time Returns: wrong product % Returns: off-spec product % Order shortfall % Ranking Scheme Importance to customer: 1 = Nice to Have, 2 = Important, 3 = Critical, Must Have Customer Satisfaction: 1 = Very Satisfied, 2 = OK. Could be better, 3 = Unhappy, Must be improved $22.50 97% 95% 99% 3 3* 9* 2 1 6 9 *Note: customer has not complained about price because we are absorbing difference between market price and actual costs. If customer were charged actual cost we would lose the business. In addition to price, getting the delivery amount right is a Critical-to-Quality issue for the customer. © Max Zornada (2005)
74
Define the Process © Max Zornada (2005)
75
Define the Process What process? Identifying the process;
Tools for documenting and analysing our processes: SIPOC Process Blocking Top-Down Process Map Process Mapping Process Deployment Chart Process Flow Analysis © Max Zornada (2005)
76
Identifying Processes
Ask the following questions: What are we doing for a customer? What is the first step in the chain of events that lead to meeting the customer need ? What are all the steps in between including the decisions and choices that need to be made? What order or sequence do the steps flow in from start to finish ? © Max Zornada (2005)
77
Identifying the Customer and what it is we do for them ……
Outcome Satisfaction © Max Zornada (2005)
78
Identifying what it is that tells us we have to do this for them … the “triggering event” which kicks off an operation of the process. Customer Triggering Event Outcome Satisfaction © Max Zornada (2005)
79
Identify all of the tasks, operations, activities, judgements, decisions, inspections and checks which must be done along the way in order to deliver the required outcome to the customer. Customer Triggering Event Outcome Satisfaction Task or activity required to progress the process Decision, judgement, inspection, check point or choice. Yes/No, OK/Not OK outcome. © Max Zornada (2005)
80
Link them all up to to show the order in which the process flows.
Customer Triggering Event Outcome Satisfaction Task or activity required to progress the process Decision, judgement, inspection or check point. Yes/No, OK/Not OK outcome. © Max Zornada (2005)
81
This is a process map! Customer Outcome Satisfaction Triggering Event
Task or activity required to progress the process Decision, judgement, inspection or check point. Yes/No, OK/Not OK outcome. © Max Zornada (2005)
82
Process Definition Worksheet Objective : To specifically define the scope of the process being studied Process Name: The Process Starts with: The Process Ends with: The Process includes: The Process excludes: Connecting Process: © Max Zornada (2005)
83
The SIPOC Model Suppliers - Inputs - Process - Outputs - Customers
Business or Work Process Suppliers © Max Zornada (2005)
84
SIPOC Analysis Worksheet
Date Process Name Page of Suppliers Inputs Process Steps Outputs Customers © Max Zornada (2005)
85
SIPOC Analysis Worksheet Procurement Process
Date Process Name Procurement Process Page of Suppliers Inputs Process Steps Outputs Customers Customer Dept. Purchase Requisition Receives purchase req. Complete Purchase Buyer Reviews for completeness Requisition Time stamps Assigns to buyer © Max Zornada (2005)
86
Process Block Diagramming (Process Blocking)
Block diagramming a process provides an easy way to construct a "rough cut" view of the process; Block diagramming identifies the major "chunks" in the process and which functions are involved; Block diagramming may provide a suitable level of detail for a high level analysis of the process in many cases. © Max Zornada (2005)
87
Example of Process Block Diagram
Start Receive Purchasing Order Process Raise Warehouse Data Credit Dispatch Official Processing Check picking & Delivery Order process Account Install & Rejection Payable Commission process Finish © Max Zornada (2005)
88
Technician Allocation
Top-Down Process Map Etc. Order Receival Credit Check Product Sourcing Technician Allocation Receive fax Raise formal order documentation Data process into system Send to Credit section Preliminary customer checks Obtain credit details from Bank Make credit decision. Receive order details Determine stock availability Issue to stock picker Pick stock Take to Despatch dock Pass order onto Technical Receive order details Identify schedule date Book into scheduling system Allocate technician © Max Zornada (2005)
89
Process Mapping Symbols
Name Brief Definition Operation or process step Depending on the level of detail being developed, can be used to denote anything from a simple task, major activity or a whole sub-processes. Decision Point Point where a decision must be made before any further action can be taken. Document Generated Point at which a form or report is generated by the process. Continuation Point Used to indicate the process is continued elsewhere on the flow diagram or on another sheet. Input/Output Block Optionally used to describe an input or output from a processing block. Flow lines Use to connect all blocks to display the sequence in which operations are performed. Termination point Used to indicate the start and end of a process. © Max Zornada (2005)
90
Sample Process Map: Taking a Customer Order
Note: Some computer based flow charting packages use to indicate a continuation point on another page, and to indicate a continuation point on the same page. Start An extended oval shape is used to indicate the start or finish of a process. 1 Greet customer Take customer's order A rectangle represents a processing step 1 A line with an arrowhead indicates flow and direction of the process Repeat order to customer No Customer confirms Change order A diamond shape represents a decision point Yes Confirm order on terminal Verbally announce to kitchen Continues onto the Cook’s part of the process. 1 1 A numbered circle represents a continuation point. Cook's part of process continued page 2. © Max Zornada (2005)
91
Process Deployment Chart
Re-draw the Process Map laying out each of the process segments in "bands" or "streams" which correspond to the part of the process performed by each functional position in the process; Identifies how the process is deployed through the functional organisational structure – add functions in the order that they are first “touched” by the process; Can highlight process steps performed within functions that may not be apparent from initial process map. Good at highlighting parallel processes; Identifies hand-overs and inefficient "zig-zagging" in the process; Rule of Thumb: Changes that reduce the amount of zig-zagging usually result in improved performance. © Max Zornada (2005)
92
Process Deployment Chart
Customer Sales Clerk Data Proc. Credit Technical Dispatch Service Bank © Max Zornada (2005)
93
Process Deployment Chart Variation: Service System Map The Line of Visibility Approach
Customer Interface Direct Front Line support In-Direct Front Line support Front Line Customer Manager Valuation Assessm't Document'n Stamp Settlem't Broker © Max Zornada (2005)
94
A Service System Map The Line of Visibility Approach
Front office Could be moved to a back office operation Front Line Customer Manager Valuation Assessm't Document'n Stamp Settlem't Broker © Max Zornada (2005)
95
Process Complexity Analysis
© Max Zornada (2005)
96
Complexity Concept first put forward by the Hewlett-Packard Company;
Complexity is defined as being those extra process steps that are required to deal with external errors (errors generated by factors outside the process) and to recover from internal errors (errors generated by the process). Classified all work into two categories: Real Work Complexity © Max Zornada (2005)
97
Identifying Complexity
To identify complexity, ask the question: "If the process were running perfectly, would this activity be performed ?" YES = Real Work NO = Complexity © Max Zornada (2005)
98
Two Views of Work Time Conventional View Complexity View
Time Available for Real Work Time Unavailable for Work Complexity View Complexity - Internal Errors Time Unavailable for Work Time Available for Real Work Complexity - External Errors © Max Zornada (2005)
99
Indicators of High Complexity
Lots of work-in-progress materials. Many shelves and interim storage facilities to hold materials. Many people walking from place to place, standing in line waiting for something, standing idle. Work areas that are in disarray. Dusty boxes on floors, bookcases full of dusty binders, desks and walls covered in little scraps of paper serving as reminder notes. People who can give only brief and vague explanations of what they are working on and why it is important. Humorous signs taped to the walls that say things like "You want it when ? Ha ! Ha !" or " A clean desk is a sign of a sick mind" In office areas, piles of processed and unprocessed documents, stored in the work area. Supervisors and managers pacing around the area trying to find out what's going on, ascertain who made a critical mistake and expediting late orders. © Max Zornada (2005)
100
Indicators of Low Complexity
Small amount of work-in-progress. Few shelves and temporary storage areas to hold work. Few people walking around. Most people working at a steady, relaxed pace. No one waiting in line at copy machines, office supplies stores etc. Work areas that are neat. Everything in a department has a place and a use. People using time management systems instead of scraps of paper. Desk tops containing only what the person is working on at the time. People on shop floor or office areas can give complete descriptions of what they do, why they do it, who their customers are, and what's important to those customers. The most common item displayed on department walls are monthly performance graphs, daily control charts, pareto charts of problems. In office areas all documents are received, processed and filed. In-baskets are clean. Supervisors and managers who are relaxed, walking around the area talking with employees, asking them what they are working on, and looking for ways to make their employees' jobs easier and more satisfying. © Max Zornada (2005)
101
A Simple Retail Purchasing Process The Manager's View
Customer Clerk Select goods from shelf Read price tag Enter data in register Offer to Pay Announce Total Make change Leave Wrap Goods © Max Zornada (2005)
102
The Reality of Complexity caused by Error !
Customer Clerk Supervisor Store person Pick Goods from shelf Is Price Tag OK ? No Yes Look up Printed list Explain Difference Yes Accept ? No Goods Damaged ? Yes Exit Angry ! No Discuss with supervisor ? Wrap etc. Inquire if available from storeroom No Explain to Customer Discuss situation Available ? Yes Apologise to Customer Fetch and Notify Supervisor Bring to Clerk Etc., Etc. ... © Max Zornada (2005)
103
A “generic” process map
Show the task structure and underlying logic; Would be useful to link a process to resources and costs; Process Flow Analysis (PFA) is a technique that allows us to do this. (note: PFA is also referred to as Value Stream Analysis by some). Customer © Max Zornada (2005)
104
Process Flow Analysis (Also referred to as Value Stream Analysis)
Symbol Name Brief Definition A task or activity which results in intentional changes to one or more characteristics. Operation Temporary storage between operations or waiting for some event which will allow work to continue. Delay Moving of an object or document from one physical location or work station to another. Transportation Storing materials or documents in a protected storage area, requiring authorisation for removal. Storage An examination to determine quality or quantity. Inspection Combining two symbols indicates simultaneous activities eg. inspection is conducted at the same time as the operation. Combined © Max Zornada (2005)
105
Process Flow Analysis Chart
Date Process Name Page of Estimated Time Description Operation Inspection Transport Quantity Distance Notes Delay Store D D D D D D D D D D D D D D D D D D D © Max Zornada (2005) D D
106
Process Flow Analysis Chart Internal Mail Distribution Process
Date Process Name Internal Mail Distribution Process Page of Operation Inspection Transport Estimated Time Quantity Distance Description Delay Store Notes 1. Mail sitting in mail room D 1 hr 300 Delivered 8:00am 2. Date Stamp all envelopes D 30 min 300 3. Determine addressee D 30 min 300 4. Sort in bundles by department D 10 min 15 One bundle /Dept. 5. Place in out-trays and wait for pick-up D 2 hrs 15 6. Internal Mail pick-up and delivery D 15 min 15 100m Average distance of all depts. 7. Placed in department secretary in tray D 15 min 1 8. etc., etc. .... D D D D D D D D D D D D © Max Zornada (2005) D D
107
Using PFA with a Process Map
Stream A: Dominant flow through the process Stream B: Secondary flow Secondary flows are caused by: Variations required to the dominant process to handle different products or variants of the main product through the process; Extra steps required to deal with errors and mistakes in the dominant flow e.g. rework and correction activities. Stream C: Secondary flow © Max Zornada (2005)
108
Quantifying the process by using PFA
Stream A: Dominant flow through the process Stream B: Secondary flow Volume X Time through B % % Volume X Time through C Volume of product or transactions going through stream A (Total Volume) X Time = Hours of Work Generated by the work flow. Stream C: Secondary flow © Max Zornada (2005)
109
Quantifying the process by using PFA
Apply a volume to the dominant flow and weighted volumes to the secondary flows and calculate the workload generated; From the workload generated, calculate the number of Full Time Equivalents required (FTE); Apply accepted conversion factors from work standards; Convert to number of people required to resource the process by taking into account hours worked and rostering arrangements. © Max Zornada (2005)
110
Using PFA The full PFA for a process can be set up as a spreadsheet model; This can then be used to test the viability of various opportunities for improvement when selecting what to focus on; Can be used to model proposed changes and simulate the impact on the organisation. Review Spreadsheet PFA Model © Max Zornada (2005)
111
Value-Added and Non-Value Added Analysis
Process steps can be categorised as being value added or non-value added; Value-added steps are steps considered essential to the process; Value-added process steps pass the following three tests: Is the step related to doing it right the first time ? Does the step get you one step closer to delivering the product or service to the customer ? Would the customer be willing to pay for the step ? © Max Zornada (2005)
112
Non-Value Added Work Internal failure: steps related to correcting in-process failures due to errors in prior activities in the process; External failure: steps related to fixing errors in the product or service the customer has found and re-addressed to you; Set-up: Steps that prepare work for subsequent activity; Control/Accuracy: Steps that relate to internal process review and monitoring, appraisal steps in COQ terminology; Moves and transport: Steps related to the physical transports that occur between activities in a process; Delay or wait: Time spent waiting for the next processing step © Max Zornada (2005)
113
Using PFA for Value Analysis
First pass through the process Value Added Non - Value Added If done as rework, internal or external failure All Non - Value Added © Max Zornada (2005)
114
Tollgate Review: Define Phase
© Max Zornada (2005)
115
Toll Gate Review: Define
Project has been confirmed as a valid improvement priority and is supported by management. A business case has been prepared, showing the potential business impact of this project in financial terms. A problem statement has been prepared and agreed. Objectives defining the results we are expecting from this project have been stated in the form of measurable targets. A full Project Team Charter has been prepared including a preliminary plan/schedule. The charter has been reviewed with the project sponsor and their support has been confirmed. The primary customer and their key requirements have been identified. The process concerned has been documented in the form of a process map. © Max Zornada (2005)
116
Conclusion of Define Stage Module
© Max Zornada (2005)