The Glenn House Mohammad Baradaranshoraka Kamal I. Mamoua Dinesh Gudavalli Swati R. Nair Udaya Sathya Chakradhar Kedarisetty Daeyang Heo December 04, 2014.

Similar presentations


Presentation on theme: "The Glenn House Mohammad Baradaranshoraka Kamal I. Mamoua Dinesh Gudavalli Swati R. Nair Udaya Sathya Chakradhar Kedarisetty Daeyang Heo December 04, 2014."— Presentation transcript:

1 The Glenn House Mohammad Baradaranshoraka Kamal I. Mamoua Dinesh Gudavalli Swati R. Nair Udaya Sathya Chakradhar Kedarisetty Daeyang Heo December 04, 2014

2 Team Organization December 04, 20142 Project Manager Earthwork Plumbing Roofing Mohammad Baradaranshoraka Estimator Plumbing Roofing Kamal I. Mamoua Estimator Openings Walls Swati R. Nair Estimator Finishes Concrete Daeyang Heo Estimator HVAC Walls Dinesh Gudavalli Estimator Electrical Walls Udaya Sathya Chakradhar Kedarisetty

3 December 04, 20143

4 Concrete Daeyang Heo December 04, 20144

5 Footings December 04, 20145 ① Length : 54'×2 sides + (28'-16"/12×2 corners )×2 sides = 158.7 FT ② Cross-section Area : (16"/12)×(14"/12) + (2"/12)2÷2 = 1.6 SF ③ Concrete(3000 psi) Volume : 158.7×1.6 = 249 CF ④ Rebar(#5) : (158.7' - 2"/12×12 edges ) × 2 ea = 313.4 FT ⑤ Form : 158.7×2 sides ×14"/12 = 370.3 SF ⑥ Anchor Bolt : [(54' + 28') ⅹ 2 sides ] ÷ 2 = 82 EA

6 Slab December 04, 20146 ① Area : 54'×28' – (14'+8"/12") ×4‘ = 1,453.3 SF ② Volume : 1,453.3 × 4/12 = 484.4 CF ③ Length of Form : (54'+28')×2 sides = 164 LF

7 Cost of Concrete December 04, 20147

8 Concrete – CSI Components December 04, 20148

9 Walls Dinesh Gudavali & Swati R. Nair & Udaya Sathya Chakradhar Kedarisetty December 04, 20149

10 Exterior Walls December 04, 201410

11 Interior Walls Porch Interior Walls and Porch December 04, 201411

12 Cost of Walls December 04, 201412

13 Cost of Walls – cont. December 04, 201413

14 Walls – CSI Components December 04, 201414

15 Roof Mohammad Baradaranshoraka & Kamal I. Mamoua December 04, 201415

16 Roof December 04, 201416

17 Cost of Roof December 04, 201417

18 Roof – CSI Components December 04, 201418

19 Openings Swati R. Nair December 04, 201419

20 Openings December 04, 201420

21 SLDRBFDDoors SLDR, BFD and Doors December 04, 201421

22 Cost of Openings December 04, 201422

23 Openings – CSI Components December 04, 201423

24 Finishes Daeyang Heo December 04, 201424

25 Floor December 04, 201425 ① Ceramic tile : 5.5×5.5 + 5.5×8.5 + (10.5×6.5 - 2.5×1.5) + 4.5×14.5 = 206.75 SF ② Cementitious acrylic : 22.5×13 - 3×3 = 283.5 SF ③ Wood floor : 1453.3 - [(6×8) + (8.5×6) + (10.5×10.5) + (13.5×22.5) + (4.5×14.5) + (3×2)] = 869.05 SF 1 1 1 1 2 3 3

26 Kitchen December 04, 201426

27 December 04, 201427 Kitchen

28 December 04, 201428 Kitchen ① Cabinet(36x34.5x24 in.): 6 EA ② Cabinet(36x24x12 in.): 3 EA ③ Cabinet(36x34.5x12 in.): 7 EA ④ Cabinet(92x34.5x12 in.): 1 EA ⑤ Corner Base Cabinet(28.375x34.5x16.5 in.): 1 EA ⑥ Counter top : (36/12×24/12×2ea)+(36/12×24/12×5ea) = 42 SF ⑦ Refrigerator: 1 EA, Hood: 1 EA, Range: 1 EA, sink: 1 EA

29 Bathroom December 04, 201429 ① Lavatory with cabinet : 1 EA ⅹ 2 places = 2 EA ② Toilet : 1 EA ⅹ 2 places = 2 EA ③ Bathtub : 1 EA ⅹ 2 places = 2 EA

30 Laundry December 04, 201430 ① Washer: 1 EA ② Dryer: 1 EA

31 Cost of Finishes December 04, 201431

32 Finishes – CSI Components December 04, 201432

33 Plumbing Mohammad Baradaranshoraka & Kamal I. Mamoua December 04, 201433

34 December 04, 201434 Plumbing

35 December 04, 201435

36 Cost of Plumbing December 04, 201436

37 Cost of Plumbing December 04, 201437

38 Cost of Plumbing December 04, 201438

39 Cost of Plumbing December 04, 201439

40 Plumbing – CSI Components December 04, 201440

41 HVAC Dinesh Gudavalli December 04, 201441

42 HVAC December 04, 201442

43 HVAC December 04, 201443

44 Cost of HVAC December 04, 201444

45 HVAC – CSI Components December 04, 201445

46 Electrical Udaya Sathya Chakradhar Kedarisetty December 04, 201446

47 December 04, 201447 Electrical Work

48 December 04, 201448 Conduits Switches Fixtures Conduits Switches and Fixtures

49 Cost of Electrical December 04, 201449

50 Electrical – CSI Components December 04, 201450

51 Earthwork Mohammad Baradaranshoraka December 04, 201451

52 Earthwork December 04, 201452

53 Cost of Earthwork December 04, 201453

54 Earthwork – CSI Components December 04, 201454

55 December 04, 201455

56 Thank You! Questions? December 04, 201456