Download presentation
Presentation is loading. Please wait.
Published bySuzanna Quinn Modified over 9 years ago
1
Cost comparison in EURONU DS Mats Lindroos 1
2
How to chose? 2 Neutrino beams Physics Reach Feasibility (Risk or R&D need) Cost Safety PhD students !
3
Objectives Perform a costing of the three European candidate projects: Using identical costing strategy “It is crucial to arrive at a cost but it is even more important to use a credible method to arrive at that cost” Has to start from the beginning of the study Cost drivers are likely to be infrastructure and safety related issues The costing will be part of the input CERN council needs to take a decision in 2012
4
Training for costing Training event to be organized at CERN Trainers: Hugo Bohn, Julich Carlo Wyss, CERN Participants: All EURONU DS task leaders and participants in task with responsibility for costing EURISOL task leaders Other interested in the event Possible dates will be circulated in coming weeks!
5
Elements of EURONU costing Databases and documentation required for costing: Parameters Components Comparison and cross referencing: Completed projects such as CERN LHC project, T2K Costed future projects such as ILC, CLIC, FRIB, ESS Projects working on costing such as EURISOL, ProjectX 5 Neutrino beams
6
Conclusions We just started the design study We will all help we can get on costing The IAP can play a crucial role in costing 6 Neutrino beams
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.