Presentation is loading. Please wait.

Presentation is loading. Please wait.

April 5-May 17, 2011 Each Tuesday, 6:30-8 pm Pulaski Tech BIC 3303 E Roosevelt Road Registrar: Linda K. Smith Executive Director, USGBC Arkansas Chapter.

Similar presentations


Presentation on theme: "April 5-May 17, 2011 Each Tuesday, 6:30-8 pm Pulaski Tech BIC 3303 E Roosevelt Road Registrar: Linda K. Smith Executive Director, USGBC Arkansas Chapter."— Presentation transcript:

1 April 5-May 17, 2011 Each Tuesday, 6:30-8 pm Pulaski Tech BIC 3303 E Roosevelt Road Registrar: Linda K. Smith Executive Director, USGBC Arkansas Chapter usgbcar@yahoo.comusgbcar@yahoo.com 501-680-1573 USGBC Arkansas1 Newest LEED Gold in Arkansas – UALR EIT, April, 2011

2 Session 3 April 19, 2011 6:30 – 8:00 pm

3  Session 1 – Introduction to LEED  Session 2 - Sites  Session 3- Water + Regional & Innov. Design  Session 4 - Energy  Session 5 - Materials  Session 6- Indoor Environmental Quality  Session 7- Review, Case Study, Pretest USGBC Arkansas3

4 April AmbroseLance Wright Sustainability ConsultantProject Manager LEED AP BD&C Green Advantage Practitioner Certified Professional Constructor Former USGBC AR Steering Committee Emerging Professionals Chair 4USGBC Arkansas

5  Review of Last 2 Weeks- LEED, Sites  What are Water Efficiency LEED Credits?  What are Water Prerequisites?  What are Regional Priority Credits?  What are Innovation in Design Credits? 5USGBC Arkansas

6  LEED Professional Credentials  LEED Project Certification  Benefits of Project Certification 6USGBC Arkansas

7 LEED Green Associate LEED AP+ Specialty LEED Fellow Logo Who Nontechnical- realtors, building operators, government officials, sub contractors, green material suppliers Building Professionals, working on LEED projects 10 years expertise and multiple LEED project experience How Obtain Apply, take GA exam Apply, Take GA and AP+ specialty exam Nominated Exam 100 Multiple Choice Questions, need 85% to pass 200 Multiple Choice Questions, score 170 to pass USGBC Arkansas7 LEED Accredited Professionals- 3 levels

8 8USGBC Arkansas

9 9

10  Prerequisite 1 Construction Activity Pollution Prevention Required  Credit 1 Site Selection 1  Credit 2 Development Density and Community Connectivity 5  Credit 3 Brownfield Redevelopment 1  Credit 4.1 Alternative Transportation—Public Transportation Access 6  Credit 4.2 Alternative Transportation—Bicycle Storage and Changing Rooms 1  Credit 4.3 Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles 3  Credit 4.4 Alternative Transportation—Parking Capacity 2  Credit 5.1 Site Development—Protect or Restore Habitat 1  Credit 5.2 Site Development—Maximize Open Space 1  Credit 6.1 Stormwater Design—Quantity Control 1  Credit 6.2 Stormwater Design—Quality Control 1  Credit 7.1 Heat Island Effect—Non roof 1  Credit 7.2 Heat Island Effect—Roof 1  Credit 8 Light Pollution Reduction 1 USGBC Arkansas10

11 USGBC Arkansas11

12  Will review each prerequisite and credit  Will discuss options to reach the credits  Will discuss strategies to use  Will discuss examples in Arkansas 12USGBC Arkansas

13 13

14 14USGBC Arkansas  Reduce quantity of water needed for the building  Reduce municipal water supply and treatment burden

15 15USGBC Arkansas  Prerequisite 1 Water Use Reduction Required  Credit 1 Water Efficient Landscaping 2-4 pts  Credit 2 Innovative Wastewater Technologies 2  Credit 3 Water Use Reduction 2-4 pts

16 USGBC Arkansas16

17 USGBC Arkansas17

18 18USGBC Arkansas  Commercial ◦ Toilets ◦ Urinals ◦ Bathroom Faucets ◦ Sprayers in Food Prep Kitchens  Residential ◦ Toilets ◦ Bathroom and Kitchen Faucets ◦ Shower Heads

19 USGBC Arkansas19

20 USGBC Arkansas20

21 USGBC Arkansas21

22 USGBC Arkansas22 Kohler Dual Flush Toilets

23 USGBC Arkansas23 Waterless Urinals

24 USGBC Arkansas24 Low Flow Showerhead and Faucets

25 USGBC Arkansas25 FixtureLow-FlowConventionalSavings Toilets1.6 gallons of water per flush 3.5 gallons per flush 1.9 gallons per flush Showerheads2-1/2 gallons of water per minute Between 4 and 5 gallons per minute Between 1-1/2 to 2-1/2 gallons per minute Faucet Aerators2-1/2 gallons of water per minute 4 gallons per minute 1-1/2 gallons per minute Water Efficiency: Low Flow vs. Conventional Source: National Association of Home Builders Research Center. www.lowes.com

26 USGBC Arkansas26

27 USGBC Arkansas27

28 USGBC Arkansas28

29 USGBC Arkansas29 Native plants- Fayetteville Cistern tower- Heifer

30 USGBC Arkansas30 Bioswale Rain Barrel

31 USGBC Arkansas31

32 32USGBC Arkansas  Innovation in Design 6 Possible Points  Credit 1 Innovation in Design 1-5  Credit 2 LEED Accredited Professional 1  Credit 3 The School as Teaching Tool (LEED for schools)  Regional Priority 4 Possible Points  Credit 1 Regional Priority 1-4

33  ID Credit 1 Innovation in Design  Recognize innovation building features, sustainable building practices, and strategies not specifically addresses in LEED NC and/or Exemplary performance 33USGBC Arkansas

34  Use ID Credit Catalogue of past points earned as examples  Question ◦ What are some examples you are aware of with Arkansas projects? 34USGBC Arkansas

35 35USGBC Arkansas

36 36USGBC Arkansas

37 37

38 38USGBC Arkansas

39 39USGBC Arkansas

40 40USGBC Arkansas Use Project Zip Code at www.usgbc.orgwww.usgbc.org Credit IDOptionsThreshold/Path EAc1Option 130% new/26% existing EAc1Option 132% new/28% existing EAc1Option 134% new/30% existing EAc1Option 136% new/32% existing EAc1Option 138% new/34% existing EAc1Option 140% new/36% existing EAc1Option 142% new/38% existing EAc1Option 144% new/40% existing EAc1Option 146% new/42% existing EAc1Option 148% new/44% existing EAc1Option 128% new/24% existing EAc2 1 IEQc7.1 SSc4.1 SSc6.1 WEc3 40

41  Acid Rain  Baseline vs. Design  Blackwater  Biodiversity  Biomass  Bioswale  Cooling Tower  Gallons per flush (gpf)  Gallons per minute (gpm)  Graywater  Irrigation Efficiency  Potable Water  Wastewater 41USGBC Arkansas

42  Use Efficient Fixtures  Use Non potable Water  Install Meters 42USGBC Arkansas

43  Use Efficient Fixtures  Use Non potable Water- collect roof runoff  Install sub meters to quickly identify leaks and maintenance problem areas 43USGBC Arkansas

44  Consider New Technology  Consider New Strategies  Use LEED AP  Consult the Catalog for examples  Our area RP focuses on water, public transp., hot weather energy efficiency 44USGBC Arkansas

45 45USGBC Arkansas What role does the LEED AP play? What are some innovative strategies or technologies that were not available 10 years ago?

46 46USGBC Arkansas


Download ppt "April 5-May 17, 2011 Each Tuesday, 6:30-8 pm Pulaski Tech BIC 3303 E Roosevelt Road Registrar: Linda K. Smith Executive Director, USGBC Arkansas Chapter."

Similar presentations


Ads by Google