Download presentation
Presentation is loading. Please wait.
Published byJeffery Doyle Modified over 9 years ago
1
© 2013, KDE and KASA. All rights reserved. TEACHER PROFESSIONAL GROWTH AND EFFECTIVENESS SYSTEM What the year holds
2
© 2013, KDE and KASA. All rights reserved. Target Understand and communicate to certified staff the timeline, process and sources of evidence that will be used for implementing the Teacher Professional Growth and Effectiveness System (TPGES) 2
3
© 2013, KDE and KASA. All rights reserved. The vision for the Professional Growth and Effectiveness System (PGES) is to have every student taught by an effective teacher. The goal is to create a fair and equitable system to measure teacher effectiveness and act as a catalyst for professional growth. Model District Certified Evaluation Plan 3.0: KDE 3
4
© 2013, KDE and KASA. All rights reserved. Framework for Teaching Domain 1: Planning & Preparation Domain 2: Classroom Environment Domain 3: Instruction Domain 4: Professional Responsibilities
5
© 2013, KDE and KASA. All rights reserved. What are we looking for? Who is doing the work? Flow Understanding Atmosphere “The Why” Data Procedures Reflection
6
© 2013, KDE and KASA. All rights reserved. Performance Levels Exemplary Accomplished Developing Ineffective
7
© 2013, KDE and KASA. All rights reserved. Framework for Teaching Overview http://www.bath.k12.ky.us/school_Forms.aspx?schoolid=4
8
© 2013, KDE and KASA. All rights reserved. CEP Certified Evaluation Plan Teachers (pages 8 – 43) http://www.bath.k12.ky.us/school_Forms.aspx?schoolid=4
9
© 2013, KDE and KASA. All rights reserved. August / September October / November December / January February/March April/May T P G E S Teacher creates: Student Growth Goal/Plan Professional Growth Goal/Plan Meets with principal to collaborate on both goals/plans Mid-Year Conference Student Voice Survey End-of-Year Conference 4 observations 1 full observation by supervisor 3 mini observations 1 peer observation 2 supervisor observations Pre/post-conferencing protocols Timelines: p.11 of CEP At least one full observation must be conducted by the principal AND the peer observation must be done during the final year of the district’s evaluation cycle. 9
10
© 2013, KDE and KASA. All rights reserved. Observations One-Year Cycle Teachers four observations in the summative year Three-Year Cycle Teachers Peer observation and Full observation during summative year Mini observation can be spread out during the three-year cycle Mini observations will be announced, however will be scheduled in a 5 day window span. All documentation will be completed in CIITS (Continuous Instructional Improvement Technology System)
11
© 2013, KDE and KASA. All rights reserved. Trainings Observer Calibrate every year Recertified every four years Peer Observer Every three years All Certified Teachers will be trained as Peer Observers
12
© 2013, KDE and KASA. All rights reserved. Student Voice Survey p.41 Feedback that collects feedback yearly on specific aspects of the classroom experience and teaching practice. Results will be used as a source of evidence for Professional Practice. Formative years’ data will be used to inform Professional Practice in the summative year. Principal will determine the sections to participate in the survey, with consistency building-wide. 10 or more students must respond for the data to be considered. Students must be enrolled a minimum of 15 days
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.