Download presentation
Presentation is loading. Please wait.
Published byDaniel Sullivan Modified over 9 years ago
1
SEA LEVEL RISE IN MIAMI BEACH MIAMIBEACH
2
Seawall Construction
3
Seawall installed
4
Setting stormwater manhole
5
Stormwater Vortex Structure
6
Stormwater Structure
7
Finishing installing vortex structure
8
Pump station wet well with lid
9
Pump station discharge pipes
10
Diversion Boxes for High Flow
11
Pump station gravity bypass
12
Pump station discharge pipes
13
Finishing the bottom of the pump station
14
Completed structure
15
Pump Station outfall pipe
16
Stormwater Outfall
17
6 th Street and West Ave
18
14 th Street and West Ave.
19
New Elevation Criteria
20
New Elevated Streets
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.