Presentation is loading. Please wait.

Presentation is loading. Please wait.

Regional transport planning update Strategic Planner Network Friday 23 Aug 2013 #2813557.

Similar presentations


Presentation on theme: "Regional transport planning update Strategic Planner Network Friday 23 Aug 2013 #2813557."— Presentation transcript:

1 Regional transport planning update Strategic Planner Network Friday 23 Aug 2013 #2813557

2 Key points: legislative changes RLTS and RLTP now become one = Regional Land Transport Plan First RLT Plan due 1 July 2015 Streamlined requirements Has 2 components: Objectives and policy requirements Programming second stage RLTS and value of land use planning input

3 Background Robust strategic policy foundation: Regional land Transport Strategy 2011-2041 (RLTS) – adopted Nov 2011 Regional Land Transport Programme 2012-15 (RLTP) – adopted May 2012 RTC responsible for Regional Land Transport Plan WRC responsible for Regional Land Transport Plan LTMAA 2013

4 Regional and local planning Planning change RMA reform LG reform Mayoral Forum work programme UNI, regional, local planning Waikato region evidence base (Dec 2013) RPS (on-going) District Plan reviews LTP 2015-18 -link to programme component UNISA activities

5 Project overview PhaseTimeframe Identify and confirm Strategic caseSept – Nov 2014 Identify and test alternative objectivesNov 2013 – Mar 2014 Confirm strategic policy objectivesMar 2014 Develop and confirm draft policy frameworkMar – May 2014 Targeted consultation: preferred policy frameworkMay 2014 Develop and confirm preferred strategic policiesJuly 2014 Develop and confirm draft Regional ProgrammeJuly – Nov 2014 Develop and confirm draft funding plan and monitoring framework Aug – Oct 2014 Full draft RLT Plan endorsed and out for consultation Dec 2014 – Feb 2015 Final plan adoptedApril 2015

6 Proposal: TA land use planners to support existing TA roading manager-based regional advisory group (RAG) RAG will be principal advisory group for RLT Plan Resource: a land use planner rep from each sub- region or F Proof and remainder of region Commitment: 4-6 meetings Timeframe: Nov 2013 - July 2014 Feedback

7


Download ppt "Regional transport planning update Strategic Planner Network Friday 23 Aug 2013 #2813557."

Similar presentations


Ads by Google