Presentation is loading. Please wait.

Presentation is loading. Please wait.

Computer Technology Institute & Press “DIOPHANTUS”

Similar presentations


Presentation on theme: "Computer Technology Institute & Press “DIOPHANTUS”"— Presentation transcript:

1 Computer Technology Institute & Press “DIOPHANTUS”
Enhancement of Cultural Heritage through Environmental Planning and Management D3.3 – Volume II report “Strategic Assessment of the Sites” Dr. Panagiotis A. Konstantinopoulos Computer Technology Institute & Press “DIOPHANTUS” Patras, 9 July 2013

2 D3.3-Vol. II contents National Reports (6 pilot areas)
D3.3-Vol. II contents National Reports (6 pilot areas) Brief, non-structured description of Current versus Prospective situation with reference to Sectors and Indicators Matrix (Quantitative analysis - Indicators, Leopold’s table) Results (combined SWOT – StraSSE analysis) Conclusions (from application of model to various Pilot Sites) Patras, 9 July 2013

3 D3.3-Vol. II contents Introduction [any kind of general information that may be useful for the consolidated Volume II report] Presentation of Pilot site [more extensive than the brief one included in Volume I and more focused to the information with relevance to indicators, Brief, non-structured description of Current versus Prospective situation with reference to Sectors and Indicators] SWOT Analysis [brief presentation of existing SWOT analysis] Patras, 9 July 2013

4 D3.3-Vol. II contents Application of LAC Methodology: Limits of Acceptable Change (LAC) STEP 1 - Definition of all special characteristics of the study area [collection of information, checking of SWOT analysis] STEP 2 – Definition of particular activity zones [geographic area and, if necessary, individual zones] STEP 3 – Assessment of particular indices [filtering indices according to relevance and in view of SWOT, final selection] STEP 4 – Evaluation of indices for each zone [filling in the Leopold’s matrix] STEP 5 – Comparison of current conditions with referenced ones STEP 6 – Measurement taking [involvement of local actors, conclusions] Patras, 9 July 2013

5 D3.3-Vol. II contents Conclusions [general conclusions about applicability of methodology, modifications, improvisations] Bibliography Patras, 9 July 2013

6 D3.3-Vol. II state Initial deadline - End of May Plus 2+ months before submission: Aquileia – OK Idrija – mid-July Hallstatt – end of July Cetinje – end of July Bitola – mid-August Berat – end of August ? Patras, 9 July 2013

7 D3.3-Vol. II state Pilot site May June July Aug Sep Oct Nov Aquileia *
D3.3-Vol. II state Pilot site May June July Aug Sep Oct Nov Aquileia * Idrija Hallstatt Cetinje Bitola Berat Patras, 9 July 2013

8 D3.3-Vol. II state Suggested deadline - End of August 2013 Scenario -1
D3.3-Vol. II state Suggested deadline - End of August 2013 Scenario -1 Aquileia, Idrija, Hallstatt, Cetinje, Bitola, Berat Full report (May report) Scenario -2 Aquileia, Idrija, Hallstatt, Cetinje Draft report (May report) Scenario -3 Reporting in November PPR Patras, 9 July 2013

9 Dr. Panagiotis A. Konstantinopoulos
Dr. Panagiotis A. Konstantinopoulos Computer Technology Institute & Press “DIOPHANTUS” (CTI) Patras, 9 July 2013


Download ppt "Computer Technology Institute & Press “DIOPHANTUS”"

Similar presentations


Ads by Google